7.3.1 Facilities Layout Options

  1. To change the layout of Facilities tab in the Limit Configuration screen to table view, click Table View icon.
    The layout is changed as shown below.
  2. To view the facility details in table view, click the required Line Number.
    The Facility Details window is displayed.

    Figure 7-27 Facility Basic Details



    For information on fields in the Basic Info screen, refer the table below.

    Table 7-2 Basic Info

    Fields Description
    Utilized Amount Displays the utilized amount.
    Branch Search and Select Branch from list of Branch Code.
    Line Code Enter Line Code for the facility.
    Line Serial Number Line Serial Number will be defaulted to 1 and you cannot modify line serial number.
    Parent Facility ID Search and Select Parent Facility ID and enter the following fields:
    • Facility ID
    • Facility Description
    • Line Code
    • Line Serial
    Facility Type Select Facility Type from the below checklist. The options are:
    • Funded
    • Non Funded
    Facility Category Search and Select Facility Category from list of Category Code.
    Facility Description Enter Facility Description for the facility.
    Project Id Search and Select Project Id from list of Category Code.
    Class Code Search and Select Class Code from list of Category Code.
    Commitment Status Select Commitment Status from the below checklist. The options are:
    • Committed
    • Uncommitted
    Secured Click Secured option and select Cascade check box, if required.
    Revaluation Required Select Revaluation Required option, if required.
    Rate Agreement Required Select Rate Agreement Required option, if required.
    Drop Line Limits Switch to indicate, if the facility limit drops over time based on a schedule.
    For information on fields in the Sanction screen, refer the table below.

    Table 7-3 Sanction

    Fields/Icon Description
    Currency Search and select Currency in which the facility has to be offered.
    Requested Amount Specify the amount requested by the party in Requested Amount field.
    Probability of Default Enter Probability of Default. Select Decrement and Increment drop-down list option on right to increase or decrease the probability.
    Loss Given Default Enter Loss Given Default. Select Decrement and Increment drop-down list option on right to increase or decrease the loss given.
    Facility Risk Rating Enter Facility Risk Rating. Select Decrement and Increment drop-down list option on right to increase or decrease the facility risk rating.
    RAROC Enter RAROC. Select Decrement and Increment drop-down list option on right to increase or decrease the RAROC.
    Sanctioned Amount Displays the sanctioned amount.
    Day Light Limit Enter Day Light Limit for the facility.
    Shadow Limit Click Shadow Limit check box to select Shadow Limit.
    Day Light Overdraft Limit Displays the day light overdraft limit.
    Effective Line Amount Displays the effective line amount.
    Limit Amount Basis Select Limit Amount Basis from the below drop-down list. The options are:
    • Limit Amount
    • Limit Amount + Collateral Contribution
    • Minimum of Limit Amount or Collateral
    Bulk Payment Click Bulk Payment check box to select Bulk Payment.
    Internal Remarks Enter Internal Remarks, if required.

    Figure 7-29 Facility -Utilization Order



    For information on fields in the Availability screen, refer the table below.

    Table 7-4 Availability

    Fields/Icon Description
    Limit Amount Specify the line amount.
    Collateral Amount Specify the collateral amount.
    Pool Amount Specify the pool amount.
    Line Start Date Select Date for Line Start Date.
    Line Expiry Date Click Select Date and select date for Line Expiry Date.
    Renewal Date Click Renewal Date and select date for Renewal Date.
    Maintenance Value Date Click Maintenance Value Date and select date for Maintenance Value Date.
    Drawing Power Backed Enable Drawing Power Backed, if required.
    Revolving Line Enable Revolving Line, if required.
    Is Non Revolving Special Line Enable Is Non Revolving Special Line, if required.
    Unadvised Enable Unadvised, if required.
    Available Displays the current Available status of the line.
    Availability Period Specify the Availability Period for the facility.
    For information on fields, refer the field below.

    Table 7-5 Limit Review

    Fields/Icon Description
    Release Type Select Release Typefrom the drop-down list. The options are:
    • Full
    • Partial
    Released Amount Displays the released amount.
    Yet to be Released Amount Displays the amount yet to be released.
    Limit Status Select Limit Status from the drop-down list. The options are:
    • Active
    • Closed
    • Frozen
    Next Review Date Select Date for Next Review Date.
    Review Frequency Select Review Frequency from the drop-down list. The options are:
    • Half yearly
    • Monthly
    • Quarterly
    • Yearly

    Figure 7-31 Facility - Utilization



    For information on fields in the Utilization screen, refer the table below.

    Table 7-6 Utilization

    Fields/Icon Description
    Available Amount Specify the available amount.
    Blocked Amount Specify the blocked amount.
    Utilized Amount Specify the utilized amount.
    Total Repaid Amount Specify the total repaid amount.
    Outstanding Unutilized Commitment Amount Displays the utilized outstanding amount.
    Outstanding Utilized Amount Displays the utilized amount.
    Utilization Tracking Select Utilization Tracking from the drop-down list. The options are:
    • Local
    • Global
    Exception Transaction Amount Specify the transaction amount.
    Netting Required Select the option from the available list.
    Exception Breach Precentage Specify the exception breach percentage.
    Net Utilization Displays the net utilization.
    Peak Utilization Displays the peak utilization.
    Average Utilization Displays the average utilization.
  3. To view the facility writeup, click the writeup icon in Writeups column.
  4. To change the layout of Facilities tab in Limit Configuration screen to structural view, click Facility Structure icon.
    The layout is changed as shown below.

    Note:

    For more information on fields, refer Field Configuration Parameters
  5. Select the required layout option.
    The facility structure is changed to the selected layout.