- Enterprise Limits Management
- Limits
- Facilities Maintenance
- Facility Main Line Change Maintenance
- Facility Main Line Change Summary
2.2.6.1 Facility Main Line Change Summary
This topic describes about the procedure to view main line change summary details.
- On the Home screen, specify
GESFMLCG in the text box and click the
icon.The Facility Main Line Change Summary screen is displayed.For more information on fields, refer to the field description table.Figure 2-11 Facility Main Line Change Summary
Table 2-30 Facility Main Line Change Summary - Field Description
Field Description Authorization Status Select the authorization status from the drop-down list. The available options are: - Authorized
- Unauthorized
- Rejected
Record Status Select the record status from the drop-down list. The available options are: - Open
- Closed
Reference Number Click the
icon and select the reference number from the
list.
Liability No Click the
icon and select the liability number from the
list.
Line Code Click the
icon and select the line code from the
list.
Line Serial Click the
icon and select the line serial from the
list.
Main Line Code Click the
icon and select the main line code from the
list.
To Main Line Code Click the
icon and select the to main line code from the
list.
Effective Date Specify the effective date. Status Click the
icon and select the status from the list.
Error Code Click the
icon and select the error code from the
list.
Error Parameters Click the
icon and select the error parameters from the
list.
Parent topic: Facility Main Line Change Maintenance
