2.2.3 Schedules Maintenance
This topic describes about the procedure to define limit schedule.
The system allows to reduce the limit assigned to a customer under a revolving line, while maintaining limits for a customer.
For a liability code and credit line combination, you can define limit schedules and indicate the limit that is applicable for the period. You can enter a negative limit amount. However, the Limit Date should not be earlier than the Limit start date and later than the Limit Expiry Date.
The Facility batch that runs at BOD checks the limit schedule for a facility and if a schedule is due on the current date in the branch. If this is the case, the system adjusts the limit amount for the facility with the upcoming schedule to match the schedule limit amount.
Note:
The fields, which are marked with an asterisk, are mandatory.- On Facilities Maintenance screen, click the
Schedules tab.The Schedules Maintenance screen is displayed. For more information on fields, refer to the field description table.
Table 2-19 Schedules Maintenance - Field Description
Field Description Limit Date Specify the limit date. The limit date cannot be earlier than current business date. The limit date cannot be earlier than Line Start Date. It should be future date of Line Start Date.
Schedules Limit Amount Specify the limit amount for the specific limit date. Note:
- Backdated schedule cannot be modified or deleted.
- Future dated schedule can be modified to future date.
- Future dated schedule cannot be modified to before Line start date.
- Future dated schedule can be modified or deleted.
- Limit amount can be modified for future dated schedule.
In this screen, you need to enter details only for transactions that involve a Tenor (Example, Loans, Money market transactions, and so on). Through this screen you can specify a list of Tenors and the associated limit that tenor based transactions can utilize under this line.
For example, you have defined a limit schedule for a facility for your client ABC Corporation where the Limit Amount initially is USD 1 million and the start date for the facility is Jan 01,2009. The schedule is as shown below:Table 2-20 Schedules
Limit Date Schedules Limit Amount February 01, 2009 500000 March 02, 2009 800000 April 03, 2009 400000 May 04, 2009 900000 In this case, during BOD on Feb 01, 200r, the limit amount is updated to USD 500,000 and on Mar 02, 2009 it is modified again to USD 800,000. If the batch does not run on Mar 02, 2009, it will be run on Mar 03, 2009. Accordingly, the ‘Scheduled Limit Amount’ defined for Mar 02, 2009 Schedule is updated as Facility Limit Amount.
During EOD, the system processes limits schedules and revision process takes place for the facilities as per the scheduled date. It processes the limit schedules till next working day and marks all the schedules till date as processed.
When the Facility Start Date and Schedule Date falls on the same day, then on save of Facility record, you get an override message for confirmation on updating the limit amount of Facility as per the schedule amount.
While processing, if there are any errors or overrides, it should be logged. The following are the possible errors:- Available amount is negative for the facility.
- The Tenor Limit Amount exceeds the Line Approved Limit Amount as the validation of the Tenor Limit Amount is against the Approved Limit Amount.
- The amount cannot exceed the overall limit specified for the liability id.
- The Main Line Limit cannot be less than any of its Sub Line Limit.
- The Sub Line Limit cannot exceed the Main Line Limit.
Example
Assume the following:- Liability - GROUPLIAB
- Line - SHTLLIMIT
- Serial - 1
- Start Date - 01-Jul-2009
- Limit Currency - USD
- Limit Amount - 50000
Table 2-21 Schedules
Limit Date Schedules Limit Amount 15-July-2009 60000 28-July-2009 65000 30-July-2009 75000 15-Aug-2009 80000 - System Date - 14-Jul-2009
- Limit Amount - 50000
On 14-Jul-2009 EOD, limit revision process takes the 15-Jul-2009 schedule and update 60000 as limit amount. The revised limit is enforced or effective on 15-Jul-2009.
- System Date - 15-Jul-2009
- Limit Amount - 60000
Table 2-22 Schedules
Limit Date Schedules Limit Amount 15-July-2009 60000 28-July-2009 65000 30-July-2009 75000 15-Aug-2009 80000 - System Date - 27-Jul-2009
- Limit Amount - 60000
- Next working Day - 30-Jul-2009
- System Date - 30-Jul-2009
- Limit Amount - 75000
Table 2-23 Schedules
Limit Date Schedules Limit Amount 15-July-2009 60000 28-July-2009 65000 30-July-2009 75000 15-Aug-2009 80000 - Click Save to save the record.
Parent topic: Facilities Maintenance