4.4 Specify the Contract Preferences
This topic describes the back valued schedules liquidation, move schedules forward or backward, specify the holiday currency, mode of liquidation, and cascade schedules.
Although schedules are inherited by a deal from the product, through the Contract Preferences screen, define the schedules for a deal.
A scheduled date:
- Should be later than or the same as the Value Date
- You can have only one schedule for a component for a date, and
- It cannot be beyond the Maturity Date
This topic contains the following subtopics: