5.1.1 Prerequisites

Following are the prerequisites for the ALM Results Transformation Process:

  1. An ALM Process (or processes) (Stochastic or Deterministic) has been executed successfully and produced results.
  2. Hierarchy Transformation is executed successfully.
  3. Dimension Movement (SCD) and DIM_RUN population executed successfully.
  4. Dim Dates process executed successfully.
  5. All the post-install steps mentioned in the Oracle Financial Services Analytical Applications Infrastructure (OFSAAI) Installation and Configuration Guide and the Oracle Financial Services Asset Liability Management User Guide and Oracle Financial Services Asset Liability Analytics User Guide must be completed successfully.
  6. Application users must be mapped to a role that has the seeded batch execution function (BATPRO).
  7. Before executing a batch, check if the following services are running on the Application Server.
    • Iccserver
    • Router
    • AM
    • Messageserver

    For more information on how to check if the services are up and on, and how to start the services if you find them not running, see the Oracle Financial Services Analytical Applications Infrastructure User Guide.

    Batches must be created for executing the function. This is explained in section Executing the ALM Results Transformation Process.