5.5.5 Scheduling One or More Validations

To schedule a future validation, or to schedule validations on a recurring basis, follow these steps:
  1. Navigate to Operations and select Batch Scheduler. The Batch Scheduler window appears.
  2. In the Batch Name pane, select the Scheduled Batch ID. An unchecked box means that no validation is scheduled to run.
  3. Select New Schedule or Existing Schedule.
    The Existing Schedule can be selected only if there are existing schedule batches to view.
    If New Schedule is selected, the New Schedule pane appears. Enter the Scheduled Task Name.
    To schedule the validation on a recurring basis, select Daily, Weekly, Monthly, or Adhoc.
  4. In the Schedule Task pane, enter the Start Date and End Date in the Date field.
  5. In the Run Time field, enter the time for the next validation to be run.
  6. Click Save to set the schedule as specified or Cancel to drop your changes.
    Any error messages or warnings generated during the validation process are displayed in the View Log. For more information, see Viewing the Messages.
    For more information, see the OFS Analytical Applications Infrastructure User Guide.