31.21 Tractor Method

The Tractor Method extends the concept of Strip Funding to instruments that do not have contractual Cash Flows. These products are known as perpetual or non-maturity products and hence do not generate contractual Cash Flows. The process of determining transfer rates requires adopting the strip funding approach by splitting these products into Core and Volatile portions based on statistically established Behavioral Profiles. With this method, the volatile portion is considered to have an overnight maturity and the core portion is assigned a longer maturity (through Replicating Portfolio) which is comprised of a series of balance strips corresponding to the maximum tenor of the portfolio (on the origination of the portfolio, original strips will have shorter maturities). Each strip is assigned a transfer rate corresponding to its Origination Date and corresponding Term. The historical, active strips are retained for the portfolio and the Portfolio Transfer Rate is determined based on the Weighted Average Transfer Rate of the strips comprising the portfolio. The Weighted Average Rate from the strip portfolio is written back to all instrument records that are mapped to this portfolio through the Transfer Pricing Rule.

Figure 31-23 Tractor Method


Tractor Method

The characteristics of the replicating portfolio used by the Tractor Method are defined through Replicating Portfolio Module. The following example illustrates the behavior of a small 3-day portfolio rolling across 4 days.

Table 5:

Table 31-10 Replicating Portfolio

31-Jan-11
Strip Start Maturity Balance TP Rate Date Rolled Comment
0A 31-Jan-11 1-Feb-11 100 5.00% 1-Feb-11
0B 31-Jan-11 2-Feb-11 100 5.10% 3-Feb-11
0C 31-Jan-11 3-Feb-11 100 5.20% 3-Feb-11 Matures and rolls to 3A
1A 1-Feb-11 4-Feb-11 100 5.30%
2A 2-Feb-11 7-Feb-11 100 5.40%
3A 3-Feb-11 8-Feb-11 100 5.50% Rollover strip, TP’s by the engine
Day 1
1-Feb-11 Daily Rollover
Strip Start Maturity Balance Rate Date Rolled Comment
0A 31-Jan-11 1-Feb-11 100 5.00% 1-Feb-11 Matures and rolls to 1A
0B 31-Jan-11 2-Feb-11 100 5.10%
0C 31-Jan-11 3-Feb-11 100 5.20%
1A 1-Feb-11 4-Feb-11 100 5.30% Rollover strip, TP’s by the engine
Day 1 Maturity Profile
Total Day 1 Day 2 Day 3
2-Feb-11 3-Feb-11 4-Feb-11 Tractor TP Rate
300 100 100 100 5.20%
Day 2
2-Feb-11 Daily Rollover
0A 31-Jan-11 1-Feb-11 100 5.00% 1-Feb-11
0B 31-Jan-11 2-Feb-11 100 5.10% 2-Feb-11 Matures and rolls to 2A
0C 31-Jan-11 3-Feb-11 100 5.20%
1A 1-Feb-11 4-Feb-11 100 5.30%
2A 2-Feb-11 7-Feb-11 100 5.40% Rollover strip, Transfer Priced by the engine
Day 2 Maturity Profile
Total Day 1 Day 2 Day 3
3-Feb-11 4-Feb-11 7-Feb-11 Tractor TP Rate
300 100 100 100 5.30%
Day 3
3-Feb-11 Daily rollover, and new business (reduction of 530)
0A 31-Jan-11 1-Feb-11 100 5.00% 1-Feb-11
0B 31-Jan-11 2-Feb-11 100 5.10% 3-Feb-11
0C 31-Jan-11 3-Feb-11 100 5.20% 3-Feb-11 Matures and rolls to 3A
1A 1-Feb-11 4-Feb-11 100 5.30%
2A 2-Feb-11 7-Feb-11 100 5.40%
3A 3-Feb-11 8-Feb-11 100 5.50% Rollover strip, Transfer Priced by the engine
3B 3-Feb-11 4-Feb-11 10 5.50% New Business strip, Transfer Priced by the engine
3C 3-Feb-11 7-Feb-11 10 5.50% New Business strip, Transfer Priced by the engine
3D 3-Feb-11 8-Feb-11 10 5.50% New Business strip, Transfer Priced by the engine
Day 3 Maturity Profile
Total Day 1 Day 2 Day 3
4-Feb-11 7-Feb-11 8-Feb-11 Tractor TP Rate
270 90 90 90 5.39%
Day 4
4-Feb-11 Daily rollover
0A 31-Jan-11 1-Feb-11 100 5.00% 1-Feb-11
0B 31-Jan-11 2-Feb-11 100 5.10% 2-Feb-11
0C 31-Jan-11 3-Feb-11 100 5.20% 3.-Feb-11
1A 1-Feb-11 4-Feb-11 100 5.30% 4-Feb-11 Matures and rolls to 4A
2A 2-Feb-11 7-Feb-11 100 5.40%
3A 3-Feb-11 8-Feb-11 100 5.50%
3B 3-Feb-11 4-Feb-11 -10 5.50% 4-Feb-11 Matures and rolls to 4A
3C 3-Feb-11 7-Feb-11 -10 5.50%
3D 3-Feb-11 8-Feb-11 -10 5.50%
4A 4-Feb-11 9-Feb-11 90 5.60% Rollover strip, Transfer Priced by the engine
Day 4 Maturity Profile
Total Day 1 Day 2 Day 3
7-Feb-11 8-Feb-11 9-Feb-11 Tractor TP Rate
270 90 90 90 5.50%

This example assumes a business day calendar is enabled with the following business days defined:

  • Business Day
  • Calendar
  • 31-Jan-11
  • 1-Feb-11
  • 2-Feb-11
  • 3-Feb-11
  • 4-Feb-11
  • 7-Feb-11
  • 8-Feb-11
  • 9-Feb-11
  • 10-Feb-11
  • 11-Feb-11