8.2 Liquidity Coverage Ratio Components

Table 8-3 Liquidity Coverage Ratio Components

Field Names Description
Report Name Liquidity Coverage Ratio Components
Report Level Filters Not applicable
Report Description The drill-through report named Components of Liquidity Coverage Ratio that was available as part of the Liquidity Ratio report are available as part of this report.
Report Type

Combination of Column and Line Graph

The following are displayed on the X-axis:

Pre-option

Each applicable option

The Liquidity Coverage Ratio is displayed as a line graph on the primary Y-axis. Only the line markers are displayed, the line itself is not displayed.

The following components of LCR are displayed as columns on the secondary Y-axis:

Stock of High Quality Liquid Assets

Net Cash Outflows

Dimensions

Legal Entity

Asset Level

Cash Flow Type

Base Measures

Stock of Level 1 Assets

Stock of Level 2A Assets

Stock of Level 2B RMBS Assets

Stock of Level 2B non-RMBS Assets

Adjustment due to Cap on Level 2B Assets

Adjustment due to Cap on Level 2 Assets

Stock of High Quality Liquid Assets

Total Cash Inflows

Total Cash Outflows

75 % of Total Cash Outflows

Net Cash Outflows

Liquidity Coverage Ratio

Computed Measures Not applicable
Drill-through On Chart
Drill-through’s

Level 1:

Page Level Display Parameters: The following parameters are displayed:

As of Date

Process/Run

Run Execution ID

Run Type

Consolidation Type

Legal Entity

Page Level Filters: Currency Type

Report Name: Break-up of Liquidity Coverage Ratio Components

The pre and post option LCR is displayed.

Chart 1:

Chart Name: Stock of HQLA Components

Report Type: Column Chart

The stock of HQLA and its components are displayed on the x-axis and the values prior to option and post each option are displayed as columns on the y-axis.

Level 2 Drill- through On: Not applicable

Chart 2:

Chart Name: Net Cash Outflow Components

Report Type: Column Chart

Net cash outflow and its components are displayed on the x-axis and the values prior to option and post each option are displayed as columns on the y-axis.

Level 2 Drill- through On: Not applicable

Note:

If the run purpose in the Run Management window is selected as U.S. Fed Liquidity Ratio Calculation then, Liquidity Coverage Ratio Components report is not applicable.