Reloading Macros
As mentioned on the Live Energy Connect Concepts and Terminology page when the Oracle Utilities Live Energy Connect (LEC) Server starts, it uses the configuration defined in the Configuration Manager and the PDI macros defined in the DataflowMacros.pdi file to instantiate a server configuration.
Sometimes, customers may need to update which macros are loaded into a server configuration if they are upgrading from an older version of LEC or if they were provided custom PDI macros to use in their configuration.
To reload macros:
- Stop any running LEC Server instances on the machine. To do this, select Stop from the Services tab in the Central panel (for running services). Alternatively, select Stop Server from the Configuration Alias panel (for any running server processes).
- Unload any batch files by selecting the batch files in the Batch Files tab of the Properties panel and click Unload.
- Select Reload macros from the File menu in the Menu Bar. The Configuration Manager will automatically start the LEC Server as a process and reload the macro definitions in the DataflowMacros.pdi file, or any custom macros specified in the User macros field, and then stop itself.