Table of Contents
- Title and Copyright Information
- Preface
- 1 Introduction to Upgrading Oracle Internet Directory to 12c (12.2.1.3.0)
-
2
Pre-Upgrade Requirements
- Pre-Upgrade Checklist
- Creating a Complete Backup
- Creating a Replica of Your Production Environment for Testing
-
Verifying Certification and System Requirements
- Verify Your Environment Meets Certification Requirements
-
Verify System Requirements and Specifications
-
Migrating from a 32-Bit to a 64-Bit Operating System
- Procure the Hardware That Supports the Upgrade's 64-bit Software Requirement
- Stop All Processes
- Back Up All Files from the 32-bit Host Machine
- Set Up the Target 64-bit Machine with the 11g Host Name and IP Address
- Restore the 11g Backup from 32-bit Host to 64-bit Host
- Install the 12c Product Distributions on the Target Machine
- Upgrade the Target 64-bit Environment Using the Standard Upgrade Procedure
-
Migrating from a 32-Bit to a 64-Bit Operating System
- Verify That the Database Hosting Oracle Fusion Middleware is Supported
- Verify That the JDK Is Certified for This Release of Oracle Fusion Middleware
- Updating Policy Files when Using Enhanced Encryption (AES 256)
- Purging Unused Data
- Creating a Non-SYSDBA User to Run the Upgrade Assistant
- Shutting Down the Node Managers
-
Part I In-Place Upgrade of Oracle
Internet Directory
-
3
Upgrading Oracle Internet Directory Single Node 11g Environments
- About the Oracle Internet Directory Upgrade Process
- Installing Oracle Internet Directory
- Running a Pre-Upgrade Readiness Check
- Creating the Required Schemas
- Stopping Servers and Processes
- Upgrading Product Schemas
- About Reconfiguring the Domain
- Upgrading Domain Component Configurations
- Starting Servers and Processes
- Creating SSL Wallet in 12c
- Accessing the New Oracle Directory Services Manager Console
-
4
Upgrading Oracle Directory Integration Platform from 11g
- About the Oracle Directory Integration Platform Upgrade Process
- Extending the 11g Domain to Include Oracle Directory Integration Platform
- Installing Oracle Internet Directory
- Creating the Required Schemas
- Running a Pre-Upgrade Readiness Check
- Stopping Servers and Processes
- Upgrading Product Schemas
- About Reconfiguring the Domain
- Upgrading Domain Component Configurations
- Additional Configuration to Include Oracle Directory Integration Platform
- Starting Servers and Processes
- Performing Post-Upgrade Tasks for Oracle Directory Integration Platform
- 5 Upgrading Oracle Internet Directory Highly Available Environments
-
3
Upgrading Oracle Internet Directory Single Node 11g Environments
-
Part II Out-of-Place Upgrade of Oracle
Internet Directory
-
6
Performing an Out-of-Place Upgrade of Oracle
Internet Directory
- Pre-Upgrade Assessment
- Set the Source Directory to Read-Only Mode
- Exporting the Required Data from the Source Directory
-
Loading the Data
- Copying the Exported Data File to the Target Environment Directory Host
- Stopping all Oracle Internet Directory Instances in the Target 12c Environment
- Deleting the Current baseDN Data in Bulk
- Loading the Exported Data Into the Target Directory in Bulk
- Starting the Oracle Internet Directory Instances in the Target 12c Environment
-
6
Performing an Out-of-Place Upgrade of Oracle
Internet Directory
- A Validating OID Instances and Setting Environment Variables
- B Updating the JDK After Installing and Configuring an Oracle Fusion Middleware Product