Table of Contents
- Title and Copyright Information
- Preface
- 1 Preparing to Upgrade Oracle GoldenGate Monitor Server
- 2 Pre-Upgrade Checklist
- 3 Creating a Complete Backup
- 4 Cloning Your Production Environment for Testing
-
5
Verifying Certification and System Requirements
- 5.1 Verify Your Environment Meets Certification Requirements
-
5.2
Verify System Requirements and Specifications
-
5.2.1
Migrating from a 32-Bit to a 64-Bit Operating System
- 5.2.1.1 Procure the Hardware That Supports the Upgrade's 64-bit Software Requirement
- 5.2.1.2 Stop All Processes
- 5.2.1.3 Back Up All Files from the 32-bit Host Machine
- 5.2.1.4 Set Up the Target 64-bit Machine with the 11g Host Name and IP Address
- 5.2.1.5 Restore the 11g Backup from 32-bit Host to 64-bit Host
- 5.2.1.6 Install the 12c Product Distributions on the Target Machine
- 5.2.1.7 Upgrade the Target 64-bit Environment Using the Standard Upgrade Procedure
-
5.2.1
Migrating from a 32-Bit to a 64-Bit Operating System
- 5.3 Verify That the Database Hosting Oracle Fusion Middleware is Supported
- 5.4 Verify That the JDK Is Certified for This Release of Oracle Fusion Middleware
- 6 Updating Policy Files when Using Enhanced Encryption (AES 256)
- 7 Purging Unused Data
- 8 Creating an Edition on the Server for Edition-Based Redefinition
- 9 Creating a Non-SYSDBA User to Run the Upgrade Assistant
- 10 Upgrading the Oracle Database
- 11 Upgrading for SQL Server
- 12 Performing Post-Upgrade Tasks
- A Upgrading Oracle GoldenGate Monitor 12.2.1.2.0 Domain to 12.2.1.3.0
- B Oracle GoldenGate Monitor 12.2.1.2 and 12.2.1.3 Domain Upgrade Tool (WebLogic 12.2.1.4 Compatible)