2 Install the Library
The SL150 library installs into a standard 19-inch rack. You must install the Base Module first, and then install any Expansion Modules below it.
Note:
These installation instructions use the Sun Rack II (a standard Oracle 19-inch rack). If your rack is different, use the instructions as a basic guide but alter the steps accordingly.
Library installation involves the following tasks:
- Verify the Site Meets Environmental Requirements
- Prepare the Rack
- Unpack and Acclimate the Library
- Install the Base Module
- Install the Expansion Module
- Install Power Supplies and Tape Drives
- Cable the Library
- Unlock the Robot
- Apply Power to the Library
- Configure the Library After Powering-on for the First Time
- Run a Self-Test