Go to main content
1/15
Contents
Title and Copyright Information
Preface
Intended Audience
Related Documents
Conventions
1
Introduction to the Oracle WebCenter 12c (12.2.1.1) Upgrade
1.1
Understanding the Oracle WebCenter Upgrade to 12c
1.2
Understanding the Starting Points for an Oracle WebCenter 12c Upgrade
1.3
Understanding the Interoperability and Compatibility Restrictions
1.4
Understanding the Oracle WebCenter Upgrade Process Flow
1.5
Understanding the Oracle WebCenter Upgrade Procedures
2
Pre-Upgrade Tasks for Oracle WebCenter Components
2.1
Oracle Fusion Middleware Pre-Upgrade Checklist
2.2
Creating a Complete Backup
2.2.1
Backing Up the Schema Version Registry Table
2.2.2
Maintaining Custom Domain Environment Settings
2.3
Cloning Your Production Environment for Testing
2.4
Verifying Certification and System Requirements
2.4.1
Verify Your Environment Meets Certification Requirements
2.4.2
Verify System Requirements and Specifications
2.4.3
Verify that the Database Hosting Oracle Fusion Middleware Is Supported
2.4.4
Verify that the JDK Is Certified for This Release of Oracle Fusion Middleware
2.5
Updating Policy Files when Using Enhanced Encryption (AES 256)
2.6
Purging Unused Data
2.7
Creating an Edition on the Server for Edition-Based Redefinition
2.8
Creating a Non-SYSDBA User to Run Upgrade Assistant
2.9
Performing the Oracle WebCenter Pre-Upgrade Tasks
2.9.1
Disabling Obsolete Components Before Upgrade
2.9.2
Determining Which Schemas Can be Upgraded for WebCenter
3
Upgrading an Oracle WebCenter Domain to 12c (12.2.1.1)
3.1
Installing the Required Oracle Fusion Middleware Distributions for WebCenter
3.2
Creating Schemas for WebCenter 12c
3.3
Running a Pre-Upgrade Readiness Check
3.4
Upgrading Schemas with the Upgrade Assistant
3.5
Reconfiguring the WebCenter Domain with the Reconfiguration Wizard
3.6
Upgrading the Component Configuration with the Upgrade Assistant
3.7
Performing Post-Upgrade Configuration Tasks
3.7.1
Starting and Stopping Administration Server
3.7.2
Starting and Stopping the Node Manager
3.7.3
Starting and Stopping the Managed Servers
3.7.4
Verifying the New Applications Work as Expected
4
Upgrading Oracle WebCenter Content to 12c
4.1
Understanding an Upgrade to Oracle WebCenter Content 12c
4.2
WebCenter Content Domain Upgrade Restrictions
4.3
Performing Pre-Upgrade Tasks for WebCenter Content
4.3.1
Changing Application Name for 11g (11.1.1.6) Instances
4.3.2
Upgrading the Metadata Schema (_MDS) Before Upgrading WebCenter Content Web UI 11g Domain
4.3.3
Installing the Latest Inbound Refinery (IBR) Before an Upgrade
4.4
Performing Pre-Upgrade Tasks for Oracle WebCenter Enterprise Capture
4.4.1
Verify the Batch Processing has Completed and Capture JMS Queues are Empty
4.5
Performing an Upgrade of Oracle WebCenter Content Imaging
4.6
Performing an Upgrade of Oracle WebCenter Content
4.7
Performing Post Upgrade Tasks for WebCenter Content
4.7.1
Configuring the Oracle WebCenter Content Server Domain to Include WebCenter Content - Web UI
4.7.2
Configuring E-Business Suite AXF Schema After an Upgrade
4.7.3
Removing IPM/Viewer JMS Servers for Oracle WebCenter Content: Imaging
4.7.4
Removing the IPM Server for Oracle WebCenter Content: Imaging
4.7.5
Updating the WccAdf.ear File (Optional)
4.7.6
Migrating Custom Skins for WebCenter Content Web UI
4.7.7
Upgrading Oracle Application Adapters for Oracle WebCenter Content
4.7.8
Configuring the Report Library for Records Management in Content Server
4.7.9
Using Fusion Middleware Control to Monitor IBR
4.7.10
Starting Oracle WebCenter Content Server with SOA or BAM
5
Upgrading Oracle WebCenter Portal 11g to 12c
5.1
Performing Pre-Upgrade Tasks for Oracle WebCenter Portal
5.1.1
Ensuring OID is Up and Running
5.1.2
Exporting Metadata for Portlet Producer Applications
5.1.3
Saving OmniPortlet and Web Clipping Configuration
5.1.4
Migrating Portal Framework Applications
5.2
Upgrading Oracle WebCenter Portal 11g Installations
5.2.1
Running the upgradeWebCenterPortal WLST Command
5.2.1.1
Output Generated by the upgradeWebCenterPortal WLST command
5.2.2
Running the Upgrade Audit Tool
5.2.3
Accessing Upgrade Metrics
5.3
Performing Post-Upgrade Tasks for Oracle WebCenter Portal
5.3.1
Upgrading 11g Portlet Producers
5.3.1.1
Migrating a Portlet Producer Application
5.3.1.2
Redeploying a Portlet Producer Application
5.3.1.3
Migrating Customizations
5.3.2
Restoring OmniPortlet and Web Clipping Configuration
5.3.3
Removing Duplicate Portal Pages
5.3.4
Verify the Content Server Connection is Upgraded
5.3.5
Upgrading WebCenter Portal 11g Assets to 12c
5.4
Understanding the Impact of Upgrade on Deprecated Features
5.4.1
Portal-Level Device Settings
5.4.2
Hierarchical Portals
5.4.3
Deprecated Portlets
5.5
Troubleshooting Oracle WebCenter Portal Upgrade Issues
5.5.1
Extra Entries Appear for the ACTIVITIES Schema
5.5.2
Floating Toolbar Not Available for Custom Page Templates
5.5.3
Running the Predeployment Tool does not Update 11g Portlet Producers
5.5.4
Handling Errors While Upgrading Oracle WebCenter Portal
5.5.5
Errors on Accessing Documents/Blogs/Wiki Pages in an Upgraded Portal
5.5.6
Portal Upgrade Fails
6
Upgrading Oracle WebCenter Sites to 12c (12.2.1.1)
6.1
Understanding the WebCenter Sites Upgrade from 11g to 12c
6.2
Upgrading WebCenter Sites from 11g to 12c
6.2.1
Installing Fusion Middleware Infrastructure
6.2.2
Installing WebCenter Sites 12.2.1.1.0 Distribution
6.2.3
Creating the Required Schemas before the Upgrade
6.2.4
Configuring the WebCenter Sites Domain
6.2.5
Configuring WebCenter Sites Instance
6.2.5.1
Prerequisites for Configuring WebCenter Sites Instance
6.2.5.2
Configuring WebCenter Sites with the Configurator
6.2.6
Post-Configuration Tasks
6.2.6.1
Switching to Authentication Against an LDAP Directory
6.2.6.2
Switching to Authentication Against Oracle Access Manager
6.2.7
Before Running the Upgrade Assistant
6.2.7.1
Creating a Non-SYSDBA User to Run Upgrade Assistant
6.2.7.2
Copying 11.1.1.8 Schema from a DB2 Source to a New Target Database
6.2.8
Upgrading the Schemas using the Upgrade Assistant
6.2.9
Upgrading the Configuration using the Upgrade Assistant
6.2.10
Post-Upgrade Validation Tasks
6.2.11
Post-Upgrade Tasks
6.3
Understanding the WebCenter Sites Upgrade Process from a Previous 12c Release
6.4
Upgrading WebCenter Sites from a Previous 12c Release
6.4.1
Installing Fusion Middleware Infrastructure
6.4.2
Installing WebCenter Sites 12.2.1.1.0 Distribution
6.4.3
Shutting Down the Administration Server and the Managed Servers
6.4.4
Backing up the 12.2.1.0 Environment
6.4.5
Reconfiguring the WebCenter Sites Domain with the Reconfiguration Wizard
6.4.6
Before Running the Upgrade Assistant
6.4.7
Upgrading the Schemas using the Upgrade Assistant
6.4.8
Upgrading the Configuration using the Upgrade Assistant
6.4.9
Post-Upgrade Validation Tasks
6.4.10
Post-Upgrade Tasks
6.5
Migrating Custom Java Libraries or Static Web Resources
7
Upgrading WebCenter in a Clustered Topology
7.1
Troubleshooting a WebCenter Cluster Upgrade
7.1.1
Accessing WebCenter Content URLs Post Upgrade
Scripting on this page enhances content navigation, but does not change the content in any way.