Go to main content
1/6
Contents
Title and Copyright Information
Preface
Audience
Documentation Accessibility
Related Documents
Conventions
1
Introduction to Oracle GoldenGate Studio Upgrade
1.1
About the Oracle GoldenGate Studio Upgrade to 12c
1.2
About Upgrade Restrictions
2
Preparing to Upgrade Oracle GoldenGate Studio
2.1
Pre-Upgrade Checklist
2.2
Creating a Complete Backup
2.2.1
Backing Up the Schema Version Registry Table
2.3
Cloning Your Production Environment for Testing
2.4
Verifying Certification and System Requirements
2.4.1
Verify Your Environment Meets Certification Requirements
2.4.2
Verify System Requirements and Specifications
2.4.3
Verify That the Database Hosting Oracle Fusion Middleware Is Supported
2.4.4
Verify That the JDK Is Certified for This Release of Oracle Fusion Middleware
2.5
Updating Policy Files when Using Enhanced Encryption (AES 256)
2.6
Purging Unused Data
2.7
Creating an Edition on the Server for Edition-Based Redefinition
2.8
Creating a Non-SYSDBA User to Run the Upgrade Assistant
2.9
Identifying Existing Schemas Available for Upgrade
3
Performing the Oracle GoldenGate Studio Upgrade
3.1
About the Oracle GoldenGate Studio Upgrade Process
3.2
Stopping Servers and Processes
3.3
Installing Oracle GoldenGate Studio
3.4
Upgrading Product Schemas
3.4.1
Starting the Upgrade Assistant
3.4.1.1
Upgrade Assistant Parameters
3.4.2
Upgrading the Schemas with the Upgrade Assistant
3.4.3
Verifying the Schema Upgrade
Scripting on this page enhances content navigation, but does not change the content in any way.