Figures |
FIGURE 2-2 Example of a Server Room Layout
FIGURE 2-3 Example Configuration 1--Three Chassis, No External SCSI Devices
FIGURE 2-4 Example Configuration 2--Three Chassis, Two External SCSI Devices
FIGURE 2-5 Physical Specifications for the Netra CT Chassis, DC model
FIGURE 2-6 Physical Specifications for the Netra CT Chassis, AC model
FIGURE 2-7 Netra CT 810 Server Physical Specifications
FIGURE 2-8 Netra CT 410 Server Physical Specifications
FIGURE 2-10 Installing a Grounding Plate
FIGURE 3-1 Center-Mounting the Chassis
FIGURE 3-2 Installing the Mounting Bracket Adapters
FIGURE 3-3 Loosening the Screws at the Top of a Netra CT 810 Server
FIGURE 3-4 Loosening the Screws at the Top of a Netra CT 410 Server
FIGURE 3-5 Loosening the Screws at the Bottom of a Netra CT 810 Server
FIGURE 3-6 Loosening the Screws at the Bottom of a Netra CT 410 Server
FIGURE 3-7 Removing a Netra CT 810 Server From the Chassis
FIGURE 3-8 Removing a Netra CT 410 Server From the Chassis
FIGURE 3-9 Mounting the Netra CT Chassis in a Rack
FIGURE 3-10 Connecting the DC Grounding Cable to the DC Grounding Studs
FIGURE 4-1 Unpacking a Netra CT Server
FIGURE 4-2 Installing a Netra CT 810 Server in the Chassis
FIGURE 4-3 Installing a Netra CT 410 Server in the Chassis
FIGURE 4-4 Tightening the Screws at the Top of a Netra CT 810 Server
FIGURE 4-5 Tightening the Screws at the Top of a Netra CT 410 Server
FIGURE 4-6 Tightening the Screws at the Bottom of a Netra CT 810 Server
FIGURE 4-7 Tightening the Screws at the Bottom of a Netra CT 410 Server
FIGURE 5-1 Attaching the Antistatic Wrist Strap
FIGURE 5-2 Supported Locations for Satellite CPU or I/O Cards in a Netra CT 810 Server
FIGURE 5-3 Supported Locations for Satellite CPU or I/O Cards in a Netra CT 410 Server
FIGURE 5-4 Buses for the Netra CT 810 Server (Front View)
FIGURE 5-5 Buses for the Netra CT 410 Server (Front View)
FIGURE 5-6 Aligning the Card with the Card Cage Cutouts
FIGURE 5-7 Tightening the Ejection Lever Captive Screws
FIGURE 5-8 Supported Locations for Rear Transition Card Sets in a Netra CT 810 Server (Top View)
FIGURE 5-9 Supported Locations for Rear Transition Card Sets in a Netra CT 410 Server (Top View)
FIGURE 5-10 Supported and Unsupported Host CPU Rear Transition Card for a Netra CT Server
FIGURE 5-11 Aligning the Card With the Rear Card Cage Cutouts
FIGURE 6-2 Installing the Cable Management Brackets
FIGURE 6-3 Host CPU Card Locations
FIGURE 6-4 Connectors on the Host CPU Card
FIGURE 6-5 RJ-45 Ethernet Connector Diagram
FIGURE 6-6 CPU Card Front Panel TTY A Diagram
FIGURE 6-7 Host CPU Front Transition Card Location in a Netra CT 410 Server
FIGURE 6-8 Connectors on the Host CPU Front Transition Card (Netra CT 410 Server)
FIGURE 6-9 Parallel Connector
FIGURE 6-10 RJ-45 Ethernet B Connector Diagram
FIGURE 6-11 TTY B Connector
FIGURE 6-12 Supported Locations for a Single-Wide 6U Alarm Card
FIGURE 6-13 Location of Double-Wide 3U Alarm Card
FIGURE 6-14 Plugging in Cables in Alarm Card in Netra CT 810 Server
FIGURE 6-15 Plugging in Cables in Alarm Card in Diskless Netra CT 410 Server
FIGURE 6-16 Connectors on the Alarm Card in Diskfull Netra CT 410 Server
FIGURE 6-17 Alarm Port
FIGURE 6-18 RJ-45 Ethernet Connector Diagram
FIGURE 6-19 RJ-45 Ethernet Connector Diagram
FIGURE 6-20 CPU Rear Transition Card (CPU RTC) in a Netra CT 810 Server (Top View)
FIGURE 6-21 CPU Rear Transition Card (CPU RTC) in a Netra CT 410 Server (Top View)
FIGURE 6-22 Connectors on the CPU Rear Transition Card
FIGURE 6-23 RJ-45 Ethernet Connector Diagram
FIGURE 6-24 Supported Location for the Alarm Rear Transition Card in a Netra CT 810 Server (Top View)
FIGURE 6-25 Supported Location for the Alarm Rear Transition Card in a Netra CT 410 Server (Top View)
FIGURE 6-26 Connectors on the Alarm Rear Transition Card
FIGURE 6-27 RJ-45 Ethernet Connector Diagram
FIGURE 6-28 COM Ports 1 and 2
FIGURE 6-29 Alarm Port
FIGURE 6-31 Stripping the Insulation From the Wire
FIGURE 6-32 Opening the DC Input Plug Cage Clamp Using the Cage Clamp Operating Lever
FIGURE 6-33 Opening the Cage Clamp Using a Screwdriver
FIGURE 6-36 Routing the Wires Out of the Bottom Portion of the Strain Relief Housing
FIGURE 6-39 DC Connector Locations, Front-Access Model
FIGURE 6-41 Disconnecting the DC Input Power Cable From the DC Connector
FIGURE 6-42 Locating the DC Connectors
FIGURE 6-43 AC Connectors on a Netra CT Chassis
FIGURE 7-1 Locating the Power Supply Locking Mechanism on the Netra CT 810 Server
FIGURE 7-2 System Status Panel Locations
FIGURE 7-3 System Power Button and System Power LED Locations (Netra CT 810 Server)
FIGURE 7-4 System Power Button and System Power LED Locations (Netra CT 410 Server)
FIGURE A-1 Locating the SCSI Port on the Host CPU Front Transition Card (Netra CT 410 Server)
FIGURE A-2 SCSI Connector on the CPU Rear Transition Card
Copyright © 2004, Sun Microsystems, Inc. All rights reserved.