Netra CT Server Hardware Upgrade Guide
For the Netra CT 410 Server and Netra CT 810 Server
819-2745-10
Contents |
Firmware and Software Requirements
To Calculate the Power Supply Requirements
Power Required by Sun cPCI Components
Netra CT 810 Server Configurations
Netra CT 410 Server Configurations
Preparing to Upgrade the Hardware
To Remove an Existing Fan Tray
Removing a Host or Satellite Board
Removing and Replacing the Rear Transition Module
To Upgrade a Rear Transition Module
Installing a Netra CP2500 Board
To Install a Netra CP2500 Board
To Block Open Filler Panel Openings
To Configure the Board and RTM
To Configure Fan Trays and Power Supplies
3. Firmware and Software Upgrade Process
Preparing to Upgrade Software and Firmware
To Determine Firmware Versions
To Obtain Newer Firmware Versions
To Update the OpenBoot PROM Firmware
To Update the Alarm Card Firmware
Upgrading the Solaris Operating System
To Upgrade the Operating System
To Download and Install Patches
Copyright © 2007, Sun Microsystems, Inc. All Rights Reserved.