Go to main content

Sun Storage 16 Gb Fibre Channel ExpressModule Host Bus Adapter, Emulex Installation Guide For HBA Model 7101690

Exit Print View

Updated: August 2018
 
 

Configuring the HBA for Hot-Plug Operation

Follow the procedure in this section to configure the HBA for hot-plug operation.

To Configure the HBA for Hot-Plug Operation

  1. Locate the green OK/Power LED indicator near the bottom of the HBA front panel, as shown in LEDs and Attention (ATTN) Button.

    The OK/Power LED indicator status is shown in Figure 7, Table 7, OK/Power LED States.

  2. If the green OK/Power indicator is not illuminated, briefly press the Attention (ATTN) button near the bottom of the HBA front panel.

    The green OK/Power LED will blink for approximately five seconds and then remain on, indicating that the HBA is properly configured.

  3. To cancel the operation, press the Attention (ATTN) button again before it stops blinking.