| Previous | Next | Contents | Index | Navigation | Glossary | Library |
| Roll Up Costs | Navigates to the Cost Rollup window, where you can perform a cost rollup. |
| Roll Up Lead Times | Executes the Calculate Cumulative Lead Times program. |
| Check for Loops | Executes the Loop Check program that searches for loops in your bill. Bill loops occur when you assign a bill as a component to itself somewhere in the multilevel structure of the bill. |
| Transfer Bill / Rtg | Navigates to the Transfer Engineering Data window so that you can transfer engineering data to manufacturing. |
| Copy Bill / Rtg From | Navigates to the Copy Bill / Rtg From window where you can copy bills or routings. |
| Assign Common Bill / Rtg | Navigate to the Common Bill / Rtg window where you can reference a common bill or routing. |
| Configure Bill | Navigate to the Oracle Product Configurator window. |
Rolling Up Cumulative Lead Times
Transferring or Copying Engineering Items, Bills, and Routings
Copying Bill and Routing Information
Referencing Common Bills and Routings
| Previous | Next | Contents | Index | Navigation | Glossary | Library |