Overview of Building Repetitive Schedules
Steps involved in building repetitive schedules include:
- Using Shop Floor Control to coordinate, on an as required basis, the following:
- Moving assemblies between routing operations and intraoperation steps as required. See: Production Line Moves.
- Backflushing or issuing and returning operation pull and assembly pull components automatically with move transactions.