Scrapping Assemblies
You scrap assemblies by moving them into a scrap intraoperation step as part of an intraoperation or interoperation move transaction. If you enter a scrap account number or alias, the cost of the assembly through the scrap operation is removed from the job or schedule. See: Assembly Scrap.
Prerequisites
To select a sales order, line/assembly or job to transact:
1. Navigate to the Move Transactions window.
2. Select a Sales Order, repetitive Line and Assembly, Assembly, or Job. The cursor defaults to one of these fields based on how you have the TP:WIP:Move Transaction First Field profile option set. See: Work in Process Profile Options.
You can only select a discrete job or a repetitive line and assembly for a repetitive schedule if the job or schedule has a status of Released or Complete.
To perform an intraoperation scrap move:
1. Select the From operation Sequence and intraoperation Step.
2. Select the To operation sequence and intraoperation step.
You can use any valid, alternate unit of measure for the assembly you are moving.
If you selected an alternate unit of measure, you must enter the quantity in the alternate unit of measure.
This date and time must fall within an open accounting period. It cannot be greater than the current date or less than the release date of the job or the earliest valid repetitive schedule.
If you subsequently change the To intraoperation step from Scrap to an intraoperatoin step other than Scrap, you must clear the scrap account Number or Account Alias.
References can be used to identify transactions on standard reports. They can be up to 240 characters of alpha numeric text.
9. Choose the Transact button.
To backflush pull components:
See Also
Assigning Lot Numbers
Assigning Serial Numbers
Setting Up Shop Floor Control
Performing Move Transactions
Overview of Resource Management