Siebel Business Process Framework: Task UI Guide > Configuring Task UI > Editing Task Flows >

Connecting Task Steps


Use the procedure that follows to define each branch.

NOTE:  Tasks do not support parallel processing. Make sure that you define your conditions such that entry conditions are satisfied for only one branch at a time. If entry conditions are satisfied for multiple branches at once, the exact execution path is not guaranteed.

To connect two steps

  1. In the Task Designer, drag a Connector arrow from the Task Palette to the design canvas, dropping the start of the arrow on the earlier of the two steps (for example, the Start step).
  2. Drag the tip of the connector arrow onto the second of the two steps.