Sun Fire V1280/Netra 1280 Systems Site Planning Guide
817-3333-11
Contents |
1.2.4 Environmental Requirements
1.2.5 Facility Power Requirements
3. Environmental and Electrical Specifications
3.1 Environmental Requirements
3.1.2 Ambient Relative Humidity
3.2 Airflow and Heat Dissipation
3.3 Sun Fire V1280 System Power Requirements
3.3.2 Connecting AC Power for Redundancy
3.4 Netra 1280 System Power Requirements
3.4.1 Source Site Requirements
3.4.1.1 Grounding Requirements
3.4.1.2 Overcurrent Protection Requirements
3.4.1.3 Disconnection and Isolation
3.4.2 Connecting DC Power for Redundancy
Copyright © 2006, Sun Microsystems, Inc. All Rights Reserved.