Netra CT Server Hardware Upgrade Guide
For the Netra CT 410 Server and Netra CT 810 Server
819-2745-10
|
Contents |
Firmware and Software Requirements

To Calculate the Power Supply Requirements
Power Required by Sun cPCI Components
Netra CT 810 Server Configurations
Netra CT 410 Server Configurations
Preparing to Upgrade the Hardware

To Remove an Existing Fan Tray
Removing a Host or Satellite Board
Removing and Replacing the Rear Transition Module

To Upgrade a Rear Transition Module
Installing a Netra CP2500 Board

To Install a Netra CP2500 Board

To Block Open Filler Panel Openings

To Configure the Board and RTM

To Configure Fan Trays and Power Supplies
3. Firmware and Software Upgrade Process
Preparing to Upgrade Software and Firmware

To Determine Firmware Versions

To Obtain Newer Firmware Versions

To Update the OpenBoot PROM Firmware

To Update the Alarm Card Firmware
Upgrading the Solaris Operating System

To Upgrade the Operating System

To Download and Install Patches
Copyright © 2007, Sun Microsystems, Inc. All Rights Reserved.