Installing Trays
C H A P T E R  2

Installing Trays

Use the procedures in this chapter to install trays in a cabinet. The number of trays you need to install depends on your overall storage requirements. You can install a maximum of seven trays, one controller tray and up to six expansion trays, for each array.

This chapter describes the process of installing the Sun StorageTek 6140 array. It contains the following sections:

The installation procedures in this chapter require the following items:



caution icon Caution - Electrostatic discharge can damage sensitive components. Touching the array or its components without using a proper ground might damage the equipment. To avoid damage, use proper antistatic protection before handling any components.


Sharp Edges on Chassis


caution icon Caution - On both the controller and expansion trays, the rear of the chassis has very sharp edges.



Preparing for the Installation

Use the following procedures to prepare for installation:

Preparing the Universal Rail Kit

Use the universal rail kit to mount the Sun StorageTek 6140 array trays in any of the following cabinets:

Unpacking the Universal Rail Kit

Unpack the universal rail kit and check the contents.

The universal rail kit (part number 594-2489-02) contains the following items:



Note - Typically, the main and extender pieces of both the left and right rails are shipped pre-assembled.


Required Hardware by Cabinet/Rack Type

The mounting hardware required for each rack or cabinet type is listed in the following table:


Type

Quantity

Use

Sun Rack 900/1000

10-32 panhead screw

8

Assemble main and extender sections of left and right rails (Typically, left and right rails are shipped pre-assembled)

8-32 panhead screw

4

Mount left and right rails to front of cabinet rails

Metric M6 panhead screw

4

Mount left and right rails to back of cabinet rails

Metric M6 panhead screw

4

Secure front of tray to left and right cabinet rails

6-32 flathead screw

2

Secure back of tray to left and right side rails

Sun StorEdge Expansion cabinet

10-32 panhead screw

8

Assemble main and extender sections of left and right rails (Typically, left and right rails are shipped pre-assembled)

10-32 panhead screw

8

Mount left and right rails to inner mount points at front and back of cabinet

8-32 panhead screw

4

Mount left and right rails to front cabinet rails

10-32 panhead screw

4

Secure front of tray to left and right cabinet rails

6-32 flathead screw

2

Secure back of tray to left and right side rails

19-inch wide, 4-post EIA-compatible cabinet with 10-32 threaded cabinet rails

10-32 panhead screw

8

Assemble main and extender sections of left and right rails (Typically, left and right rails are shipped pre-assembled)

8-32 panhead screw

4

Mount left and right rails to front cabinet rails

10-32 panhead screw

4

Mount left and right rails to back cabinet rails

10-32 panhead screw

4

Secure front of tray to left and right cabinet rails

6-32 flathead screw

2

Secure back of tray to left and right side rails

19-inch wide, 4-post EIA-compatible cabinet with M5 or 12-24 threaded cabinet rails*

10-32 panhead screw

8

Assemble main and extender sections of left and right rails (Typically, left and right rails are shipped pre-assembled)

8-32 panhead screw

4

Mount left and right rails to front cabinet rails

6-32 flathead screw

2

Secure back of tray to left and right side rails

19-inch wide, 4-post EIA-compatible cabinet with unthreaded cabinet rails**

10-32 panhead screw

8

Assemble main and extender sections of left and right rails (Typically, left and right rails are shipped pre-assembled)

Cabinet rail adapter plate

2

Snaps into left and right front cabinet rails to allow you to secure the front of the array to the left and front cabinet rails

10-32 panhead screw

4

Secure the front of the array to the adapter plates on the left and front cabinet rails

6-32 flathead screw

2

Secure back of tray to left and right side rails


*For cabinet installations with M5 or 12-24 threaded cabinet rails, the following screws are not supplied. You must acquire these to match the threading requirements of your cabinet rails:

**For cabinet installations with unthreaded cabinet rails, the following hardware is not supplied. You must acquire these to match the requirements of your cabinet rails:

Loosening the Rail Adjustment Screws

To loosen the adjustment screws on the left and right rails:

Using the #2 Phillips screwdriver, loosen the four rail adjustment screws on each rail to allow adjustment of each rail length (FIGURE 2-1).

FIGURE 2-1 Loosening the Rail Screws to Adjust
the Rail Length



Figure showing location of rail adjusting screws located toward the back of the mounting rail.




Note - The rails are preconfigured to adjust to cabinet rail depths of between 26.18 inches (664.97 mm) and 28.93 inches (734.82 mm). For cabinet rail depths outside of this range, remove and reposition the four rail adjustment screws (FIGURE 2-1) to support your required rail length.


Preparing the Tray



caution icon Caution - Two people are needed to lift and move the tray. Use care to avoid injury. A tray can weigh up to 95 pounds (43 kg). Do not lift the front of the tray; this can cause damage to the drives.


 

1. Unpack the tray.

2. Check the contents of the box for the following items:

AC power cords are shipped separately for each tray.

Preparing the Cabinet

Select the cabinet in which you will be installing the array. Be sure the cabinet is installed as described in the installation instructions provided with it.

1. Stabilize the cabinet as described in the cabinet documentation.

2. If the cabinet has casters, make sure the casters are locked to prevent the cabinet from rolling.

3. Remove or open the top front panel.

4. Remove or open the vented back panel.

Planning the Order of the Tray Installation

Install the trays starting with the controller tray at the lowest available 3RU tray slot in the cabinet. Next, install the expansion trays for the first controller tray. If room remains in the cabinet, repeat for the next controller and expansion trays.

Starting at the bottom distributes the weight correctly in the cabinet.


Attaching the Rails to a Cabinet

Depending on the type of cabinet in which you will install the tray, use one of the following procedures to attach the rails:

Attaching the Universal Rail Kit to a Standard Sun or 19-Inch Cabinet With Threaded Cabinet Rails

This procedure describes the steps to attach the universal rail kit to:

To attach the universal rail kit to a cabinet with M5 or 12-24 threaded cabinet rails:

1. Figure showing proper positioning of the rack alignment template.Position the front of the left rail behind the left front cabinet rail (FIGURE 2-2).

FIGURE 2-2 Positioning the Front of the Left
Rail Behind the Left Front Cabinet Rail




Figure showing the positioning of the left rail behind the left front cabinet rail.

2. Use the #2 Phillips screwdriver to insert and tighten two 8-32 screws to secure the left rail to the front of the cabinet (FIGURE 2-3).

Each array requires three standard mounting units (3RU) of vertical space in the cabinet. Each standard mounting unit (U) has three mounting holes in the left and right cabinet rails. Insert the screws into the lowest holes in the top two mounting units of the 3RU slot in which the tray is to be mounted.

These screws pass through the cabinet rail holes and screw into threaded holes in the left rail.


FIGURE 2-3 Securing the Left Rail to the Front
of the Cabinet




Figure showing the location of the two screws at the front of the cabinet.

3. Repeat Step 1 and Step 2 for the right rail.

4. At the back of the cabinet, adjust the length of the left rail as needed to fit the cabinet, and position the rail flange over the face of the cabinet rail (FIGURE 2-4).

FIGURE
2-4 Adjusting the Length of the Left Rail
at the Back of the Cabinet


Figure showing the rail extension flange positioned over the vertical rail.

5. Align the rail flange so that the mounting holes correspond to those at the front of the cabinet.

6. Depending on the type of cabinet you have, do one of the following (FIGURE 2-5):


FIGURE
2-5 Securing the Left Rail to the Back of
the Cabinet


Figure showing the location of the screws in the rail extension flange.

7. Repeat Step 4, Step 5, and Step 6 for the right rail.

8. Using the #2 Phillips screwdriver, tighten the eight adjustment screws (four on each side) toward the back of each rail (FIGURE 2-6).

FIGURE2-6 Tightening the Rail Adjustment Screws




Figure showing the tightening of the rail adjusting screws on the rail extension.

Attaching the Universal Rail Kit to a Sun StorEdge Expansion or Sun Fire Cabinet

This procedure describes the steps to attach the universal rail kit to:

To attach the universal rail kit to a Sun StorEdge Expansion or Sun Fire cabinet, follow these steps first for the left rail and then for the right rail:

1. In each of the four inner mounting rails, insert a 10-32 screw in the center hole of the mounting unit of the 3RU slot in which the tray is to be mounted (FIGURE 2-7).

Do not tighten at this time. You will hang the side rails on these screws.

FIGURE
2-7 Inserting Rail Mounting Screws in
Middle Holes of the Upper Mounting Unit of the Mounting Slot


Figure showing the location of the rail mounting screws in the front and back of the cabinet.Figure showing the location of the mounting screws in the front and back of the cabinet.Figure showing how to position the rack alignment template.

2. Hang the rail by aligning the large slots of the rail over the front and back screws and then pulling the rail down so that each screw is at the top of the slot (FIGURE 2-8).

FIGURE
2-8 Hanging the Rail


Figure showing detail of how to hang the left rail in the cabinet.



3. Adjust the length of the rail to fit the cabinet.


4. Using the #2 Phillips screwdriver, insert two 10-32 screws in the lower side mounting holes for the rail (FIGURE 2-9).

The hole corresponds to the center hole of the middle mounting unit of the 3RU slot in which the rail is installed.

FIGURE 2-9 Inserting Screws in the Lower Side
Mounting Holes of the Cabinet




Figure showing the location of the two mounting holes on the left side rail.


5. Use the #2 Phillips screwdriver to insert and tighten two 8-32 screws to secure the rail to the front of the cabinet (FIGURE 2-10).

These screws pass through the cabinet rail holes and screw into threaded holes in the front of the rails.

Insert the screws into the lowest holes in the top two mounting units of the 3RU slot in which the tray is to be mounted.

FIGURE 2-10 Securing the Rail to the Front of
the Cabinet




Figure showing the location of the two screws at the front of the cabinet.


6. Tighten all screws on the rail.

Attaching the Universal Rail Kit to a Standard
19-Inch Cabinet With Unthreaded Cabinet Rails

This procedure describes the steps to attach the universal rail kit to:

To attach the universal rail kit to a cabinet with unthreaded cabinet rails, follow these steps first for the left rail and then for the right rail:

1. Snap two cage nuts over the middle holes in the upper and lower mounting units of the 3RU cabinet slot in which you will mount the tray (FIGURE 2-11).

FIGURE 2-11 Inserting Cage Nuts Over Rail
Mounting Holes in Cabinet Rails





2. Hook a cabinet rail adapter plate over the front of the cabinet rail. (FIGURE 2-12)

Position the adapter plate over of the 3RU slot in which the tray is to be mounted.

FIGURE 2-12 Inserting the Cabinet Rail Adapter
Plate on the Cabinet Rail





3. Use the #2 Phillips screwdriver to insert and tighten two 8-32 screws to secure the rail to the front of the cabinet (FIGURE 2-13).

These screws pass through the unthreaded inner holes of the cabinet rail adapter plate and screw into the threaded holes in the front of the mounting rail.

FIGURE 2-13 Securing the Rail to the Front of
the Cabinet






4. On the corresponding cabinet rail at the back of the cabinet, snap one cage nut over the lowest hole in the middle mounting unit of the 3RU cabinet slot in which you will mount the tray (FIGURE 2-14).


FIGURE 2-14 Inserting A Cage Nut on the Cabinet
Rail at the Rear of the Cabinet




5. At the back of the cabinet, adjust the length of the rail as needed to fit the cabinet, and position the rail flange over the face of the cabinet rail (FIGURE 2-15).

FIGURE 2-15 Adjusting the Length of the Rail at
the Back of the Cabinet

 



Figure showing the rail extension flange positioned over the vertical rail.



6. Insert and tighten a screw appropriate for the cage nut to secure the rail to the back cabinet rail (FIGURE 2-16).

The screw passes through the lower unthreaded inner hole of the mounting rail and screws into the threaded hole of the cage nut.


FIGURE 2-16 Securing the Rail to the Back of the
Cabinet





Preparing the Two-Post Telco Rack

Use the procedures in this chapter to install trays in a standard Telco rack. (You can use the existing universal rack kit and procedures to install the Sun StorageTek 6140 array in a four-post Telco rack.) The number of trays you need to install depends on your overall storage requirements. You can install a maximum of eight, one controller tray and up to seven expansion trays, in a third-party Telco rack.

This chapter describes the process of installing Sun StorEdge 6140 trays. It contains the following sections:

The installation procedures in this chapter require the following items:



caution icon Caution - Electrostatic discharge can damage sensitive components. Touching the array or its components without using a proper ground might damage the equipment. To avoid damage, use proper antistatic protection before handling any components.


Preparing the Telco Rack

Install the rack as described in the installation instructions provided by the manufacturer.



Note - Sun Microsystems makes no warranties or guaranties as to fit, form, or function of the Sun StorEdge 6140 array installed in third-party racks or cabinets. It is the customer’s responsibility to ensure that the rack or cabinet can house the Sun StorEdge 6140 array in all conditions that may exist. All racks and cabinets must comply with local building and construction codes.


Populating a rack with trays starting from the bottom and moving up distributes the weight correctly in the cabinet.

Attaching the Rails to a Telco 2-Post Rack

This procedure describes how to attach the rackmount rail kit to a Telco 2-post frame. You can use rack rails with a depth of 3-to-6 inches.

You will mount each tray with its horizontal center aligned with the frame of the Telco 2-post rack.

1. Loosely adjust the rail length to accommodate the length of the array.

1. Insert four (12-24 or 10-32) screws (one in each post side) in the front and back mounting holes of the right and left posts (FIGURE 2-17). Do not tighten at this time.

Use the lowest available mounting hole at the bottom of each post that can be aligned with the top mount slot on the rail. The mount slot allows the rail to hang over the screw. Make sure that all four screws are aligned and mounted at the same height.




FIGURE 2-17 Inserting Screws in the Front and
Back Mounting Holes
 




Figure showing the location and positioning of the screws in the front and back mounting holes of the Telco 2-post rack.

2. Align the open slot of the left mounting rail over the front and back screws of the left post, and press the rail down until it is seated over the screws (FIGURE 2-18). Repeat for the right rail.

FIGURE 2-18 Seating the Mounting Rails Over the
Front and Back Screws




Figure showing the location of the rails mounted on the front and back screws of the Telco 2-post rack

3. Insert eight more (12-24 or 10-32) screws (two in each post side) in the lower mounting holes at the front and back of the left and right rails (FIGURE 2-19).


FIGURE 2-19 Inserting Screws in the Lower
Mounting Holes




Figure showing detail and location of the lower mounting holes of the rails on the Telco 2-post rack.

4. Using the #3 Phillips screwdriver, tighten all twelve screws (three on each side of a post) at the front and back of both mounting rails to secure each rail to its post (FIGURE 2-20).


FIGURE 2-20 Inserting Screws in the Lower
Mounting Holes




Figure showing detail and location of the lower mounting holes of the rails on the Telco 2-post rack.

 

 

Installing a Tray in a Telco 2-Post Rack

When installing a tray in a Telco 2-post rack, follow these instructions:

1. Unsnap and remove the left and right end caps on the tray to permit access to the screw mounting holes.

2. Using two people, one at each side of the tray, carefully lift and rest the tray on the bottom ledge of the left and right rails (FIGURE 2-21).



caution icon Caution - Use care to avoid injury. An tray can weigh up to 95 pounds (45 kg).


FIGURE 2-21 Positioning the Tray in the Rack




Figure showing one person at each side of the array positioned at the bottom of the 2-post rack.

3. Carefully slide the tray onto the mounting rails until the front bezel of the tray contacts the rail flange on each side (FIGURE 2-22).

FIGURE 2-22 Sliding the Tray Into the Rack




Figure showing the positioning and placement of the array at the bottom of the 2-post rack



4. Use the #2 Phillips screwdriver to insert and tighten four 10-32 x 1/2“ screws, washers, and nuts (two each per side) to secure the tray to the front of the rack (FIGURE 2-23).


FIGURE 2-23 Securing the Tray to the Front of
the Rack





Figure showing the location of the four 10-32 screws used to secure the array to the front of the 2-post rack

5. Replace the left and right end caps to hide the front mounting screws.

The end caps snap onto the front bezel of the tray.

6. At the back of the tray, make a final adjustment to the rail lengths to align the back mounting points (FIGURE 2-24) on the rail and array.

7. At the back of the tray, use the flathead screwdriver to install and tighten two
6-32 flat-head screws (one per side) through the back mounting points (FIGURE 2-25).


FIGURE 2-24 Securing the Tray to the Back of the
Rack




Figure showing the location of the two screws used to secure the array to the back of 2-post rack

8. Tighten the four10-32 locknuts (two on each rail) on each rail extension to secure the rail length.


 

FIGURE 2-25 Tightening the Locknuts on the Rail Extension






Figure showing the location of the two screws used to secure the array to the back of 2-post rack



Installing a Tray in a Cabinet

Install the controller tray in the first empty 3RU slot at the bottom of the cabinet. If you are installing expansion trays, continue installing the trays from the bottom up.

1. Using two people, one at each side of the tray, carefully lift and rest the tray on the bottom ledge of the left and right rails (FIGURE 2-26).

Figure showing the proper handling and positioning of the tray.

Caution - Use care to avoid injury. A tray can weigh up to 95 pounds (45 kg).




FIGURE 2-26 Positioning the Tray in the Cabinet


 





Figure showing the proper handling and positioning of the tray.

Controller FRU Handle Can Be Hazardous


caution icon Caution - Be careful using the FRU handle on the controller tray. It can snap shut when pushed hard during installation, pinning fingers between the tray and handle edges.


2. Carefully slide the tray into the cabinet until the front flanges of the tray touch the vertical face of the cabinet (FIGURE 2-27).

FIGURE 2-27 Sliding the Tray Into the Cabinet



Figure showing the placement of the array at the bottom of the cabinet.

3. Depending on the type of cabinet you have, do one of the following:

FIGURE 2-28 Securing the Tray to the Front of a
Sun Rack 900/1000 Cabinet





FIGURE 2-29 Securing the Tray to the Front of a
Sun StorEdge Expansion Cabinet




4. Install and tighten two 6-32 screws (one per side) at the back of the tray, to secure the back of the tray to the cabinet (FIGURE 2-30).



Note - The two upper holes on the back of the tray are not used.


Figure showing the screws used to secure the array to the back of the cabinet.Figure showing the screws used to secure the array to the back of the cabinet.

FIGURE 2-30 Securing the Tray to the Back of the Cabinet Rail



Figure showing the location and positioning of the screws in the front and back mounting holes of the Telco 2-post rack.Figure showing the location of the rails mounted on the front and back screws of the Telco 2-post rackFigure showing detail and location of the lower mounting holes of the rails on the Telco 2-post rack.Figure showing the location of all twelve screws you must tighten on the left and right rails. Figure showing the location and positioning of loosely-mounted screws in the front and back posts of the 4-post rack. Figure showing the left and right rails mounted on the front and back posts of the 4-post rackFigure showing the location of the hand knobs used to adjust the rails and the eight screws you must tighten on the left and right rails of the 4-post rack. Figure showing the location of the end caps and the outward motion used to remove each end cap from the left and right sides of the tray. Figure showing one person at each side of the array positioned at the bottom of the 2-post rack. Figure showing the positioning and placement of the array at the bottom of the 2-post rackFigure showing the location of the four 10-32 screws used to secure the array to the front of the 2-post rackFigure showing the location of the two screws used to secure the array to the back of 2-post rackFigure showing the location of the end caps and the outward motion used to remove each end cap from the left and right sides of the tray.Figure showing one person at each side of the array positioned at the bottom of the 4-post rack. Figure showing the positioning and placement of the array at the bottom of the 4-post rackFigure showing the location of the four 10-32 screws used to secure the array to the front of the 4-post rackFigure showing the location of the two 8-32 screws used to secure the array to the back of the 4-post rack.




Connecting the Power Cables

1. Verify that both power switches are off for each tray in the cabinet.

2. Connect each power supply in the tray to a separate power source in the cabinet.

3. Connect the primary power cables from the cabinet to the external power source.



Note - Do not power on the array until you complete the procedures in this chapter. The power-on sequence is described in detail in Chapter 4.




Intertray Cabling

This section describes how to cable a controller tray to expansion trays for several different configurations. The controller tray uses Controller A and Controller B expansion ports to connect to FC-AL ports at the back of each expansion tray (FIGURE 2-31).


FIGURE 2-31 Expansion Ports on the Controller and Expansion Trays






.


Array Configuration Naming Convention

The configuration naming convention is “controllers x trays” where the first number is the controller tray and the second is the sum of the controller tray and the number of expansion trays. wFor example, 1x1 is a standalone controller tray, 1x2 is the controller tray and one expansion tray, and 1x7 is the controller tray and 6 expansion trays (TABLE 2-1).


TABLE 2-1 Controller and Expansion
Tray Configurations

Configuration Identifier

Controller Tray

Number of Expansion Trays

1x1

1

0

1x2

1

1

1x3

1

2

1x4

1

3

1x5

1

4

1x6

1

5

1x7

1

6


Use the following instructions to connect the dual-RAID controller tray to one or more expansion trays.

Balancing Expansion Trays

Each controller in the Sun StorageTek 6140 Array has two expansion channels. For optimal reliability, availability, and serviceability, installation of expansion trays should be divided evenly between the two expansion channels.

If there are an uneven number of expansion trays, such as in a 1x4 and 1x6 array configuration, cable the extra expansion tray in the expansion channels of the two lowest expansion trays in the cabinet. This allows for easier addition of an expansion tray in the future.

Cabling a 1x2 Array Configuration

A 1x2 array configuration consists of one controller tray and one expansion tray. Two 2-meter optical FC cables are required.

FIGURE 2-32 1x2 Array Configuration Cabling





1. Locate the Controller A and Controller B expansion ports at the back of the controller tray (FIGURE 2-31).

2. Locate expansion ports 1A (In) and 1B (Out) at the A-side and B-side back of the expansion tray (FIGURE 2-31).

3. Connect one FC cable between the Controller B channel 1 expansion port and the B-side port 1B of the expansion tray (FIGURE 2-32).

4. Connect one FC cable between the Controller A channel 1 expansion port and the A-side port 1B of the expansion tray (FIGURE 2-32).

In this configuration, the following expansion ports are not used:

Cabling a 1x3 Array Configuration

A 1x3 array configuration consists of one controller tray and two expansion trays. Four 2-meter optical FC cables are required.

FIGURE 2-33 1x3 Array Configuration Cabling





1. Locate the Controller A and Controller B expansion ports at the back of the controller tray (FIGURE 2-31).

2. Locate expansion ports 1A (In) and 1B (Out) at the A-side and B-side back of the expansion tray (FIGURE 2-31).

3. Connect one FC cable between the Controller B channel 1 expansion port and the B-side expansion port 1B of expansion tray 1 (FIGURE 2-33).

4. Connect one FC cable between the Controller B channel 2 expansion port and the B-side expansion port 1B of expansion tray 2 (FIGURE 2-33).

5. Connect one FC cable between the Controller A channel 1 expansion port and the A-side expansion port 1B of expansion tray 1 (FIGURE 2-33).

6. Connect one FC cable between the Controller A channel 2 expansion port and the A-side expansion port 1B of expansion tray 2 (FIGURE 2-33).

In this configuration, the following expansion ports are not used:

Cabling a 1x4 Array Configuration

A 1x4 array configuration consists of one controller tray and three expansion trays. Six 2-meter optical FC cables are required.

Figure showing interconnection cables between 3 expansion trays and one controller tray.

FIGURE 2-34 1x4 Array Configuration Cabling





1. Locate the Controller A and Controller B expansion ports at the back of the controller tray (FIGURE 2-31).

2. Locate the expansion ports 1A (In) and 1B (Out) at the A-side and B-side back of the expansion tray (FIGURE 2-31).

3. Connect one FC cable between the Controller B channel 1 expansion port and the B-side expansion port 1B of expansion tray 1 (FIGURE 2-34).

4. Connect one FC cable between the Controller B channel 2 expansion port and the B-side expansion port 1B of expansion tray 3 (FIGURE 2-34).

5. Connect one FC cable between the B-side expansion port 1A of expansion tray 1 and the B-side expansion port 1B of expansion tray 2 (FIGURE 2-34).

6. Connect one FC cable between the Controller A channel 1 expansion port and the A-side expansion port 1B of expansion tray 2 (FIGURE 2-34).

7. Connect one FC cable between the Controller A channel 2 expansion port and the A-side expansion port 1B of expansion tray 3 (FIGURE 2-34).

8. Connect one FC cable between the A-side expansion port 1B of expansion tray 1 and the A-side expansion port 1A of expansion tray 2 (FIGURE 2-34).

In this configuration, the following expansion ports are not used:

A 1x5 array configuration consists of one controller tray and four expansion trays. Eight 2-meter optical FC cables are required.

FIGURE 2-35 1x5 Array Configuration Cabling





1. Locate the Controller A and Controller B expansion ports at the back of the controller tray (FIGURE 2-31).

2. Locate the expansion ports 1A (In) and 1B (Out) at the A-side and B-side back of the expansion tray (FIGURE 2-31).

3. Connect one FC cable between the Controller B channel 1 expansion port and the B-side expansion port 1B of expansion tray 1 (FIGURE 2-35).

4. Connect one FC cable between the B-side expansion port 1A of expansion tray 1 and the B-side expansion port 1B of expansion tray 2 (FIGURE 2-35).

5. Connect one FC cable between the Controller B channel 2 expansion port and the B-side expansion port 1B of expansion tray 3 (FIGURE 2-35).

6. Connect one FC cable between the B-side expansion port 1A of expansion tray 3 and the B-side expansion port 1B of expansion tray 4 (FIGURE 2-35).

7. Connect one FC cable between the Controller A channel 1 expansion port and the A-side expansion port 1B of expansion tray 2 (FIGURE 2-35).

8. Connect one FC cable between the A-side expansion port 1A of expansion tray 2 and the A-side expansion port 1B of expansion tray 1 (FIGURE 2-35).

9. Connect one FC cable between the Controller A channel 2 expansion port and the B-side expansion port 1B of expansion tray 4 (FIGURE 2-35).

10. Connect one FC cable between the A-side expansion port 1A of expansion tray 4 and the A-side expansion port 1B of expansion tray 3 (FIGURE 2-35).

In this configuration, the following expansion ports are not used:

Cabling a 1x6 Array Configuration

A 1x6 array configuration consists of one controller tray and five expansion trays. Ten 2-meter optical FC cables are required.

Figure showing interconnection cables between 3 expansion trays and a controller tray.

FIGURE 2-36 1x6 Array Configuration Cabling







1. Locate the Controller A and Controller B expansion ports at the back of the controller tray (FIGURE 2-31).

2. Locate the expansion ports 1A (In) and 1B (Out) at the A-side and B-side back of the expansion tray (FIGURE 2-31).

3. Connect one FC cable between the Controller B channel 1 expansion port and the B-side expansion port 1B of expansion tray 1 (FIGURE 2-36).

4. Connect one FC cable between the B-side expansion port 1A of expansion tray 1 and the B-side expansion port 1B of expansion tray 2 (FIGURE 2-36).

5. Connect one FC cable between the B-side expansion port 1A of expansion tray 2 and the B-side expansion port 1B of expansion tray 3 (FIGURE 2-36).

6. Connect one FC cable between the Controller B channel 2 expansion port and the B-side expansion port 1B of expansion tray 4 (FIGURE 2-36).

7. Connect one FC cable between the B-side expansion port 1A of expansion tray 4 and the B-side expansion port 1B of expansion tray 5 (FIGURE 2-36).

8. Connect one FC cable between the Controller A channel 1 expansion port and the A-side expansion port 1B of expansion tray 3 (FIGURE 2-36).

9. Connect one FC cable between the A-side expansion port 1A of expansion tray 3 and the A-side expansion port 1B of expansion tray 2 (FIGURE 2-36).

10. Connect one FC cable between the A-side expansion port 1A of expansion tray 2 and the A-side expansion port 1B of expansion tray 1 (FIGURE 2-36).

11. Connect one FC cable between the Controller A channel 2 expansion port and the A-side expansion port 1B of expansion tray 5 (FIGURE 2-36).

12. Connect one FC cable between the A-side expansion port 1A of expansion tray 5 and the A-side expansion port 1B of expansion tray 4 (FIGURE 2-36).

In this configuration, the following expansion ports are not used:

Cabling a 1x7 Array Configuration

A 1x7 array configuration consists of the controller tray and six expansion trays. Twelve 2-meter optical FC cables are required.


FIGURE 2-37 1x7 Array Configuration Cabling



1. Locate the Controller A and Controller B expansion ports at the back of the controller tray (FIGURE 2-31).

2. Locate the expansion ports 1A (In) and 1B (Out) at the A-side and B-side back of the expansion tray (FIGURE 2-31).

3. Connect one FC cable between the Controller B channel 1 expansion port and the B-side expansion port 1B of expansion tray 1 (FIGURE 2-37).

4. Connect one FC cable between the B-side expansion port 1A of expansion tray 1 and the B-side expansion port 1B of expansion tray 2 (FIGURE 2-37).

5. Connect one FC cable between the B-side expansion port 1A of expansion tray 2 and the B-side expansion port 1B of expansion tray 3 (FIGURE 2-37).

6. Connect one FC cable between the Controller B channel 2 expansion port and the B-side expansion port 1B of expansion tray 4 (FIGURE 2-37).

7. Connect one FC cable between the B-side expansion port 1A of expansion tray 4 and the B-side expansion port 1B of expansion tray 5 (FIGURE 2-37).

8. Connect one FC cable between the B-side expansion port 1A of expansion tray 5 and the B-side expansion port 1B of expansion tray 6 (FIGURE 2-37).

9. Connect one FC cable between the Controller A channel 1 expansion port and the A-side expansion port 1B of expansion tray 3 (FIGURE 2-37).

10. Connect one FC cable between the A-side expansion port 1A of expansion tray 3 and the A-side expansion port 1B of expansion tray 2 (FIGURE 2-37).

11. Connect one FC cable between the A-side expansion port 1A of expansion tray 2 and the A-side expansion port 1B of expansion tray 1 (FIGURE 2-37).

12. Connect one FC cable between the Controller A channel 2 expansion port and the A-side expansion port 1B of expansion tray 6 (FIGURE 2-37).

13. Connect one FC cable between the A-side expansion port 1A of expansion tray 6 and the A-side expansion port 1B of expansion tray 5 (FIGURE 2-37).

14. Connect one FC cable between the A-side expansion port 1A of expansion tray 5 and the A-side expansion port 1B of expansion tray 4 (FIGURE 2-37).

In this configuration, the following expansion ports are not used:


Next Steps

Now you are ready to connect the management and data hosts, as described in Chapter 3.