Index

A

about installing data host software for non-Solaris host, 1

about IP addressing, 1

array

about IP addressing, 1

balancing expansion trays, 1

cabling a 1x2 configuration, 1

cabling a 1x3 configuration, 1

cabling a 1x4 configuration, 1

cabling a 1x5 configuration, 1

cabling a 1x6 configuration, 1

cabling a 1x7 configuration, 1

configuration naming convention, 1

configuring controller IP addressing, 1

installation checklist for, 1

powering on, 1

powering-off, 1

pre-installation process for, 1

attaching rails to a Telco rack

2-post rack, 1

B

balancing expansion trays, 1

book

before you read, 1

organization, 1

related documentation, 1

submitting comments to Sun, 1

C

cabinet

attaching rails to a standard 19-inch cabinet, 1

attaching rails to a Sun Expansion cabinet, 1

attaching rails to a Sun Fire cabinet, 1

attaching rails to a Sun Rack 900/1000, 1

controller tray slot, 1

installing a tray, 1

preparing for tray installation, 1

universal rail kit mounting hardware, 1

cabling

1x2 array configuration, 1

1x3 array configuration, 1

1x4 array configuration, 1

1x5 array configuration, 1

1x6 array configuration, 1

1x7 array configuration, 1

Ethernet ports directly to management host, 1

Ethernet ports to a management LAN, 1

Ethernet ports using a hub, 1

intertray connections, 1

power connections, 1

comments

submitting to Sun, 1

components

expansion tray, 1

configuration naming convention, 1

Configuration wizard for DHCP, 1

configuring controller IP addressing, 1

configuring DHCP IP addressing, 1

configuring IP addressing using the controller serial port, 1

configuring static IP addressing, 1

connecting a data host through an FC switch, 1

connecting a terminal to a controller serial port, 1

connecting data hosts directly, 1

connecting power cables, 1

connecting the management host, 1

contacting technical support, 1

contents

universal rail kit, 1

controller

configuring IP addressing, 1

connecting a terminal to the serial port, 1

connecting Ethernet ports to a management LAN, 1

connecting Ethernet ports to directly to management host, 1

connecting using an Ethernet hub, 1

establishing communication between a terminal and the serial port, 1

using the serial port to configure IP addressing, 1

controller tray

installation slot in cabinet, 1

ship kit contents, 1

controller tray configuration, 1

controller tray LEDs and switches, 1, 2

D

data host

connecting directly, 1

connecting through FC switches, 1

setting up, 1

data host software

about installing for a non-Solaris host, 1

downloading software for a non-Solaris OS, 1

installing for a non-Solaris host, 1, 2, 3

DHCP

Configuration wizard for, 1

server configuration

before you begin, 1

Solaris DHCP server setup, 1

Windows 2000 Advanced Server installation, 1

Windows 2000 Advanced Server requirements, 1

DHCP IP addressing

configuring, 1

documentation

accessing from Sun, 1

related, 1

downloading data host software for a non-Solaris host, 1

E

emulation

setting up a terminal, 1

enabling multipathing software, 1

establishing communication between a terminal and a controller serial port, 1

Ethernet ports

connecting directly to management host, 1

connecting to a management LAN, 1

connecting using a hub, 1

expansion tray, 1

balancing, 1

LEDS (back), 1

LEDS (front), 1

ports and components, 1

ship kit contents, 1

F

FC switch

connecting a data host through, 1

H

hardware

universal rail kit, 1

hardware overview, 1

controller tray configuration in, 1

controller tray LEDs and switches in, 1, 2

expansion trays in, 1

host

connecting data directly, 1

connecting data through a FC switch, 1

connecting for management, 1

setting up a data host, 1

I

installation of trays

Telco 2-post rack, 1

installation process, 1

installing a tray in a cabinet, 1

installing data host for a non-Solaris host, 1

installing data host software for a non-Solaris host, 1

installing data host software for non-Solaris host, 1, 2

intertray cabling, 1

1x2 configuration, 1

1x3 configuration, 1

1x4 configuration, 1

1x5 configuration, 1

1x6 configuration, 1

1x7 configuration, 1

IP addressing

about, 1

configuring DHCP, 1

configuring for array controllers, 1

configuring static, 1

using the controller serial port, 1

L

LEDs

controller tray (back), 1

controller tray (front), 1, 2

expansion tray (back), 1

expansion tray (front), 1

Port Link Rate, 1

link rate

checking for a port, 1

setting, 1

M

management host

connecting, 1

mounting

universal rail kit hardware, 1

multipathing software

enabling, 1

N

New Scope wizard, 1

O

organization of book, 1

P

part numbers

universal rail kit, 1

planning the tray installation order, 1

Port Link Rate LED, 1

ports

expansion tray, 1

power

connecting cables, 1

powering off the array, 1

power-on procedures

array, 1

before powering-on, 1

checking the port link rate, 1

preparing the cabinet for tray installation, 1

preparing the tray for installation, 1

product overview, 1

hardware, 1

controller tray configuration, 1

controller tray LEDs and switches, 1, 2

expansion tray, 1

software, 1

R

rack

universal rail kit mounting hardware, 1

rackmount kit preparation, 1

rail kit

unpacking, 1

rails

attaching to a Sun Expansion cabinet, 1

attaching to a Sun Fire cabinet, 1

attaching to a Telco rack

2-post rack, 1

attaching to standard 19-inch cabinet, 1

attaching to Sun Rack 900/1000, 1

attaching to unthreaded cabinet

attaching rails to unthreaded cabinet, 1

loosening length adjustment screws, 1

related documentation, 1

S

serial port

connecting a terminal, 1

establishing communication with a terminal, 1

setting up terminal emulation, 1

using to configure IP addressing, 1

setting the tray link rate, 1

setting up a data host, 1

setting up terminal emulation, 1

ship kit

controller tray, 1

expansion tray, 1

software

enabling multipathing, 1

installing data host for non-Solaris host, 1, 2

software overview, 1

static IP addressing

configuring, 1

switch

connecting a data host through, 1

Tray Link Rate, 1

T

technical support

contacting, 1

terminal

connecting to a controller serial port, 1

establishing communication with a controller serial port, 1

setting up emulation, 1

third party web sites, 1

tools

required for tray installation, 1

tools required for tray installation, 1

tray

installation order, 1

installing, 1

intertray cabling, 1

preparing for installation, 1

preparing the cabinet for installation, 1

setting the link rate, 1

ship kit contents, 1

tools required for installation, 1

unpacking, 1

tray installation

preparing the rackmount kit for, 1

tools required for, 1

Tray Link Rate switch, 1

U

universal rail kit

attaching to a standard 19-inch cabinet, 1

attaching to a Sun Expansion cabinet, 1

attaching to a Sun Fire cabinet, 1

attaching to a Sun Rack 900/1000, 1

attaching to unthreaded cabinet, 1

contents, 1

mounting hardware, 1

part numbers, 1

unpacking, 1

unpacking a tray, 1

W

web sites

third-party, 1