Exit Print View

Sun Datacenter InfiniBand Switch 72 User’s Guide

Get PDF Book Print View
 

Document Information

Using This Documentation

Related Documentation

Documentation, Support, and Training

Documentation Feedback

Installing the Switch

Understanding Switch Specifications

Routing Service Cables

Understanding InfiniBand Cabling

Understanding the Installation

Shipping Carton Contents

Install the Switch in the Rack

Powering On the Switch

Connecting InfiniBand Cables

Verifying the InfiniBand Fabric

Administering the Switch

Troubleshooting the Switch

Administrative Command Overview

Monitoring the Hardware

Monitoring the InfiniBand Fabric

Controlling the Hardware

Controlling the InfiniBand Fabric

Servicing the Switch

Understanding Service Procedures

Servicing the Power Supplies

Inspecting a Power Supply

Identify the Power Supply

Inspect the Power Supply Hardware

Inspect the Power Supply Connectors

Power Off a Power Supply

Remove a Power Supply

Install a Power Supply

Power On a Power Supply

Servicing the Fans

Servicing the InfiniBand Cables

Servicing the Battery

Upgrading the Firmware

Index

Inspect the Power Supply Hardware

  1. Identify the prerequisite and subsequent service tasks you must perform in conjunction with this procedure.

    See Inspecting a Power Supply.

  2. Unwrap the replacement power supply from its antistatic packaging.

  3. Verify that there is no visible damage to the power supply chassis.

  4. Verify that the release tab moves freely and smoothly.

  5. Inspect the power supply connectors.

    See Inspect the Power Supply Connectors.

Related Information