Front-Mounting a Square Hole Rack Installation
To install the stationary slide rails on the front of a square hole equipment rack:
-
Locate the
following components:
-
2 x stationary slide rail sections
-
4 x 10-32 x 5/8” screws
-
2 x mounting spacers
-
2 x nut bars
-
-
Line up the
stationary slide rail end with three mounting slots with an appropriate mount
point on the front of the equipment rack.
Front Mount Point
- Place 2 x 10-32 screws through the mounting spacer, through the stationary slide rail ear, through the square rack slide rail.
- Hold the nut bar behind the front rack slide rail.
-
Secure the 10-32
screw to the nut bar you are holding in place. Refer to the following exploded
view of procedure:
Screwing In and Securing the Stationary Slide Rail
Do not completely torque the screws; leave a small amount of play at this point.
-
Repeat Steps 3 - 5
for the other mounting point.
Stationary Slide Rain Secured to Front Mount Point
- Repeat this procedure for the other stationary slide.