Index

B  C  D  G  H  L  M  O  P  R  S  U  V 

B

backing out from an I-level CDS, 1.2.7.2
Bulk CAP
adding to or removing from a partition with the HSC down, 5.7.6.11
adding to or removing from a partition with the HSC up, 5.7.6.12
changing the CAP state for Bulk CAP with the HSC up, 5.7.6.12
changing the CAP state with the HSC down, 5.7.6.11

C

CDS
oVTCS database server, M
configuring HSC
creating and cataloging the HSC startup procedure, 4.9
creating the HSC CDS, 4.1
creating the HSC PARMLIB member, 4.6
defining command authority, 4.7
defining the SYS1.PARMLIB member SMFPRMxx, 4.4, 4.5
defining volumes to ELS, 4.3
performance considerations, 4.10
running multiple HSC tapeplexes on one LPAR, 4.2
updating HSM, 4.8
configuring VTCS
building a simple CONFIG deck, 6.1
defining MVC pool volser authority, 6.3
storing VTCS locks in a coupling facility, 6.4
updating the TMS for VSM, 6.2
control data set
limiting access privileges, 1.2.4
control data set (CDS)
backing out from an I-level CDS, 1.2.7.2
placement, 1.2.2
serializing, 1.2.5
sharing, 1.2.3
space requirements, 1.2.6
types, 1.2.1
using CDS logging to recover the CDS, 1.2.8
VTCS level requirements, 1.2.7

D

data chaining a VTD Read forward or Write command, 1.2.16
determining HSC/VTCS configuration values, 1.2

G

guidelines for MVCs, 1.2.12

H

HSC
starting, 7.1
stopping, 7.2

L

limiting CDS access privileges, 1.2.4
LSMs
planning for, 1.2.9

M

MVC media preferencing
using the STORclas MEDIA parameter for, 1.2.12.2
MVCs
guidelines for, 1.2.12

O

oVTCS CDS database server
running, M

P

partitioning
adding or removing a Bulk CAP to or from a partition
HSC down, 5.7.6.11
HSC up, 5.7.6.12
CAP considerations, 5.7.3
LibraryStation considerations, 5.7.4
requirements and prerequisites, 5.7.1
restrictions, 5.7.2
Streamline libraries, 5.7
term definitions, 5.7.5
partitioning procedures
adding a library to the HSC complex, 5.7.6.4
adding a partition to the library, 5.7.6.6
adding resources to a library, 5.7.6.9
changing the CAP state for Bulk CAP with the HSC down, 5.7.6.11
changing the CAP state for Bulk CAP with the HSC up, 5.7.6.12
converting a non-partitioned library to a partitioned library, 5.7.6.2
converting a partitioned library to a non-partitioned library, 5.7.6.3
moving a partition from one host group to another host group, 5.7.6.8
removing a library from the HSC complex, 5.7.6.5
removing a partition from the library, 5.7.6.7
removing resources from a library, 5.7.6.10
starting from scratch using LIBGEN, SLICR EAT, 5.7.6.1
varying the ACS online after a configuration change, 5.7.6.13
planning for HSC/VCTS configuration
determining configuration values, 1.2
how VSM measures sizes and capacities, 1.1
planning for library volumes, 1.2.11
planning for library-attached transports, 1.2.10
planning for LSMs, 1.2.9
planning for VTDs, 1.2.14
planning for VTSSs, 1.2.13
planning for VTVs, 1.2.15
planning VTCS operating policies
general policies, 2.4
locked resource policy, 2.2
making CDS logging required, 2.1
MVC policies, 2.7
VTSS policies, 2.3
VTV migration policies, 2.5
VTV replication policies, 2.6
preparing for configuration
configuring MSP device numbers and esoterics, 3.2
defining a security system user ID for HSC/VTCS, 3.1
setting the MSP missing interrupt handler (MIH) value, 3.3
procedures, dynamic hardware reconfiguration
adding/removing expansion modules, 5.3.1.7, 5.3.1.8
changing CAP types, HSC down, 5.3.1.10

R

reconfiguring a tapeplex
adding a new VTSS, 5.4
combining two separate ACSs into one ACS, 5.2.3
combining two separate Streamline libraries, 5.2.4
consolidating two data centers, 5.2.2
HSC SET CDKLOCK utility, 5.6
HSC SET VAULTVOL and SET VAULT utilities, 5.5
partitioning Streamline libraries, 5.7
removing PTPs and splitting an ACS using MERGEcds, 5.2.5
removing vaulted volume information, 5.2.7
renaming a VTSS, 5.2.6
using Audit instead of MERGEcds for Streamline libraries, 5.3.2
using dynamic reconfiguration, 5.3.1
using the MERGEcds utility, 5.2
when do you need to reconfigure, 5.1
without using MERGEcds, 5.3
running the oVTCS CDS database server, M

S

SL8500 library
changing CAP types
HSC down, 5.3.1.10
Near Continuous Operation (NCO)
adding/removing expansion modules, 5.3.1.7, 5.3.1.8
SL8500 partitioning
adding or removing a Bulk CAP to or from a partition
HSC down, 5.7.6.11
HSC up, 5.7.6.12
space requirements for a CDS, 1.2.6
starting HSC, 7.1
stopping HSC, 7.2

U

using CDS logging to recover the CDS, 1.2.8

V

VSM
configuration
record, M
how it measures sizes and capacities, 1.1
VSM console
running the oVTCS CDS database server, M
VTCS CDS level requirements, 1.2.7