Installing your Oracle Exalytics In-Memory Machine into a four-post rack using the slide-rail and cable management arm options involves the following steps:
Reviewing Rack Compatibility
Disassembling the Slide-Rails
Installing the Mounting Brackets Onto Oracle Exalytics In-Memory Machine
Attaching the Slide-Rail Assemblies to the Rack
Installing Oracle Exalytics In-Memory Machine into the Slide-Rail Assemblies
Installing the Cable Management Arm
Verifying the Operation of the Slide Rails and CMA
Parent topic: Installing Oracle Exalytics In-Memory Machine Into a Rack
Scripting on this page enhances content navigation, but does not change the content in any way.