Go to main content
2/30
List of Figures
2-1 Low-Voltage Single Phase Power Connector
2-2 Low-Voltage Three-Phase Power Connector
2-3 High-Voltage Single Phase Power Connector
2-4 High-Voltage Three-Phase Power Connector
2-5 Typical Data Center Configuration for Perforated Floor Tiles
3-1
X7
Back—plane External Network Connectivity
3-2 Network Diagram for Recovery Appliance
3-3 Network Connections to the Recovery Appliance Rack Components
3-4 Recovery Appliance Connection to an Oracle Tape System
3-5 Recovery Appliance Connection to a Third-Party Tape System
4-1 Auto Service Request Network Connections
5-1 Oracle Exadata Deployment Assistant Welcome Page
6-1
ZDLRA Rack
in Shipping Crate
6-2 Carefully Push
ZDLRA Rack
from Behind
6-3 Location of Leveling Feet on
ZDLRA Rack
6-4 Securing
ZDLRA Rack
Using the Leveling Feet
6-5 Location of Leveling Feet on
ZDLRA Rack
X7
6-6 Securing
ZDLRA Rack
Using the Leveling Feet
6-7 Earth Ground Attachment Bolt Location
6-8 Power Cord Routing Example
6-9 PDU Switch Locations
7-1 Server Expansion Kit Components
7-2 Removing the Rack Doors
7-3 Removing the Filler Panels
7-4 Location of the Trough
7-5 Aligning the Side-Rail Assembly With the Rack
7-6 Inserting the Server with Mounting Brackets into the Slide Rails
9-1 Recovery Appliance Connected to an Exadata Quarter Rack
9-2 Recovery Appliance Connected to an Exadata Half or Full Rack
9-3 Recovery Appliance Connected to Multiple Exadata Racks
D-1 Front View of Oracle Server
X7
Oracle Database Server
D-2 Rear View of
X7
Oracle Database Server
D-3 Front View of Oracle Server X6-2 or X5-2
D-4 Rear View of Oracle Server X6-2 or X5-2
D-5 Front View of Sun Server X4-2
D-6 Rear View of Sun Server X4-2
D-7 Front View of
Oracle Exadata Storage Server X7-2 High Capacity
Server
D-8 Rear View of
Oracle Exadata Storage Server X7-2 High Capacity
Server
D-9 Front View of Oracle Server X6-2L or X5-2L
D-10 Rear View of Oracle Server X6-2L or X5-2L
D-11 Front View of Sun Server X4-2L
D-12 Rear View of Sun Server X4-2L
E-1 Rack Layout of the Recovery Appliance X7, X6, or X5 Full Rack
E-2 Rack Layout of the Recovery Appliance X7, X6, or X5 Minimum Configuration
F-1 Rack Layout of the Recovery Appliance X4 Full Rack
F-2 Rack Layout of the Recovery Appliance X4 Minimum Configuration
G-1 In-Rack Connections Between Spine Switch and Leaf Switches
G-2 In-Rack Connections Between the Servers and the Leaf Switches
G-3 Connecting Switches Across Two Racks
G-4 Connecting Switches Across Eight Racks
G-5 Connecting Switches Across 18 Racks
Scripting on this page enhances content navigation, but does not change the content in any way.