Primavera Cloud - Resource Assignment
Description: Use this subject area to to analyze resource assignment details for units and hours.
Folder | SubFolder | Field Name | Dimension/ Fact / Lookup | Description |
---|---|---|---|---|
Time | Calendar |
|
| Calendar |
Time | Calendar | Calendar Date | Dimension | Calendar Date (01/01/2013 12:00am) |
Time | Calendar | Calendar Half | Dimension | Calendar Half (1-2) |
Time | Calendar | Calendar Month | Dimension | Calendar Month (1-12) |
Time | Calendar | Calendar Quarter | Dimension | Calendar Quarter (1-4) |
Time | Calendar | Calendar Week | Dimension | Calendar Week (1-53) |
Time | Calendar | Calendar Year | Dimension | Calendar Year (2013) |
Time | Calendar | Day Date | Dimension | Calendar Date (01/01/2013 12:00am) |
Time | Calendar | Day Name | Dimension | Full day name (January 1, 2013) |
Time | Calendar | Day Of Month | Dimension | Day of the month (1 - 31) |
Time | Calendar | Day Of Week | Dimension | Day of the week (1=Sunday, 7=Saturday) |
Time | Calendar | Day Of Year | Dimension | Day of the year (1-365) |
Time | Calendar | Financial Period | Dimension | Financial Period (2013-01-01) |
Time | Calendar | Month End Date | Dimension | Month End Date |
Time | Calendar | Month Start Date | Dimension | Month Start Date |
Time | Calendar | Short Day Name | Dimension | Day-Month (01-JAN) |
Time | Calendar | Half Name | Dimension | Year-Half name (2013-H1) |
Time | Calendar | Month Name | Dimension | Year-Month name (2013-01) |
Time | Calendar | Quarter Name | Dimension | Year-Quarter name (2013-Q4) |
Time | Calendar | Week Name | Dimension | First day of the week (2013-01-01) |
Time | Calendar | Year Name | Dimension | Year Name (2013) |
Workspace |
|
|
| Workspace |
Workspace |
| Root Level Id | Dimension | A short code which uniquely identifies the root level Workspace |
Workspace |
| Root Level Name | Dimension | The name of the root level Workspace |
Workspace |
| Workspace Id Level 1 | Dimension | Workspace Id Level 1 |
Workspace |
| Workspace Name Level 1 | Dimension | Workspace Name Level 1 |
Workspace |
| Workspace Id Level 2 | Dimension | Workspace Id Level 2 |
Workspace |
| Workspace Name Level 2 | Dimension | Workspace Name Level 2 |
Workspace |
| Workspace Id Level 3 | Dimension | Workspace Id Level 3 |
Workspace |
| Workspace Name Level 3 | Dimension | Workspace Name Level 3 |
Workspace |
| Workspace Id Level 4 | Dimension | Workspace Id Level 4 |
Workspace |
| Workspace Name Level 4 | Dimension | Workspace Name Level 4 |
Workspace |
| Workspace Id Level 5 | Dimension | Workspace Id Level 5 |
Workspace |
| Workspace Name Level 5 | Dimension | Workspace Name Level 5 |
Workspace |
| Workspace Id Level 6 | Dimension | Workspace Id Level 6 |
Workspace |
| Workspace Name Level 6 | Dimension | Workspace Name Level 6 |
Workspace |
| Workspace Id Level 7 | Dimension | Workspace Id Level 7 |
Workspace |
| Workspace Name Level 7 | Dimension | Workspace Name Level 7 |
Workspace |
| Workspace Id Level 8 | Dimension | Workspace Id Level 8 |
Workspace |
| Workspace Name Level 8 | Dimension | Workspace Name Level 8 |
Workspace |
| Workspace Id Level 9 | Dimension | Workspace Id Level 9 |
Workspace |
| Workspace Name Level 9 | Dimension | Workspace Name Level 9 |
Workspace |
| Workspace Id Level 10 | Dimension | Workspace Id Level 10 |
Workspace |
| Workspace Name Level 10 | Dimension | Workspace Name Level 10 |
Workspace |
| Workspace Id Level 11 | Dimension | Workspace Id Level 11 |
Workspace |
| Workspace Name Level 11 | Dimension | Workspace Name Level 11 |
Workspace |
| Workspace Id Level 12 | Dimension | Workspace Id Level 12 |
Workspace |
| Workspace Name Level 12 | Dimension | Workspace Name Level 12 |
Workspace |
| Workspace Id Level 13 | Dimension | Workspace Id Level 13 |
Workspace |
| Workspace Name Level 13 | Dimension | Workspace Name Level 13 |
Workspace |
| Workspace Id Level 14 | Dimension | Workspace Id Level 14 |
Workspace |
| Workspace Name Level 14 | Dimension | Workspace Name Level 14 |
Workspace |
| Workspace Id Level 15 | Dimension | Workspace Id Level 15 |
Workspace |
| Workspace Name Level 15 | Dimension | Workspace Name Level 15 |
Workspace |
| Workspace Id Level 16 | Dimension | Workspace Id Level 16 |
Workspace |
| Workspace Name Level 16 | Dimension | Workspace Name Level 16 |
Workspace |
| Workspace Id Level 17 | Dimension | Workspace Id Level 17 |
Workspace |
| Workspace Name Level 17 | Dimension | Workspace Name Level 17 |
Workspace | Workspace Hierarchy |
|
|
|
Workspace | Workspace Hierarchy | All | Dimension |
|
Workspace | Workspace Hierarchy | Workspace Root Level | Dimension |
|
Workspace | Workspace Hierarchy | Workspace Level 1 | Dimension |
|
Workspace | Workspace Hierarchy | Workspace Level 2 | Dimension |
|
Workspace | Workspace Hierarchy | Workspace Level 3 | Dimension |
|
Workspace | Workspace Hierarchy | Workspace Level 4 | Dimension |
|
Workspace | Workspace Hierarchy | Workspace Level 5 | Dimension |
|
Project Portfolio |
|
|
| Portfolios consist of projects grouped together in a meaningful way. Portfolios are used to do project analysis across the enterprise. |
Project Portfolio |
| Project Portfolio Name | Dimension | The name of the portfolio. |
Project Portfolio |
| Project Portfolio Description | Dimension | The description of the portfolio. |
Project |
|
|
|
|
Project | General - (Project) |
|
| General Project Information |
Project | General - (Project) | Project Object ID | Dimension | The Unique ID of the project. |
Project | General - (Project) | Project Id | Dimension | The Project Id of the project |
Project | General - (Project) | Project Name | Dimension | The project name |
Project | General - (Project) | Added By | Dimension | The name of the user who added the project |
Project | General - (Project) | Status | Dimension | The status of the project as active, inactive, planned or what-if |
Project | General - (Project) | Overall Project Score | Dimension | The Project score |
Project | General - (Project) | Schedule Health Score | Dimension | Schedule Health Score |
Project | General - (Project) | Datasource Id | Dimension | A unique source Id created for the data source being used. Used to identify data sources when using multiple data sources. |
Project | Dates - (Project) |
|
| Project Dates |
Project | Dates - (Project) | Anticipated Start | Dimension | Anticipated start date of the project. |
Project | Dates - (Project) | Anticipated Finish | Dimension | Anticipated finish date of the project. |
Project | Dates - (Project) | Data Date | Dimension | The current data date for the project. The project status is up to date as of the data date. The data date is modified when project actuals are applied. |
Project | Dates - (Project) | Date Added | Dimension | The date this project was added. |
Project | Dates - (Project) | Start | Dimension | The current start date of the project. For a not started project, this is the project's planned start date. For a project that has started or is complete, this is the project's actual start date. For projects with no activities, the start date is equal to the anticipated start date if one is defined; if no anticipated start is defined, then the start date is equal to the project's planned start date. |
Project | Dates - (Project) | Finish | Dimension | The current finish date of the project. For not started and in-progress projects, this is the latest early finish date from all activities in the project. For completed projects, this is the latest actual finish date derived from all activities. For projects with no activities, the Finish Date is equal to the Anticipated Finish date if one is defined. For projects with no activities and no Anticipated Finish date, the Finish Date field is blank. |
Project | Dates - (Project) | Forecast Start Date | Dimension | The start date optionally used by the project scheduler. |
Project | Dates - (Project) | Forecast Finish Date | Dimension | The end date optionally used by the project scheduler. |
Project | Dates - (Project) | Must Finish By | Dimension | The optional date constraint you can specify for the project end date. |
Project | Dates - (Project) | Planned Start | Dimension | The date the project is scheduled to start. |
Project | Dates - (Project) | Scheduled Finish | Dimension | The calculated latest early finish date, which is based on the schedule most recently generated for the project. |
Project | Durations - (Project) |
|
| Project Durations |
Project | Durations - (Project) | Actual Duration | Dimension | Actual duration is the total time from the project actual start date to the actual finish date (for completed projects), or to the current data date (for in-progress projects). |
Project | Durations - (Project) | At Completion Duration | Dimension | The duration at completion is the total time from the project current start date to the current finish date. |
Project | Durations - (Project) | Baseline Project Duration | Dimension | The duration of the baseline project. |
Project | Durations - (Project) | Planned Duration | Dimension | Planned duration is the total time from the project planned start date to the planned finish date. |
Project | Durations - (Project) | Remaining Duration | Dimension | Remaining duration is the total time from the current data date to the current finish date. |
Project | Durations - (Project) | Variance - Baseline Project Duration | Dimension | The duration between the baseline project duration and the current project duration. Calculated as Planned Duration minus At Completion Duration. |
Project | Location - (Project) |
|
| Project Location |
Project | Location - (Project) | Location Name | Dimension | The name of the location |
Project | Location - (Project) | Location Type | Dimension | Location Type |
Project | Location - (Project) | Address Line 1 | Dimension | The first line of the address |
Project | Location - (Project) | Address Line 2 | Dimension | The second line of the address |
Project | Location - (Project) | City Name | Dimension | The city name for this Location |
Project | Location - (Project) | Municipality Name | Dimension | The municipality name for this Location |
Project | Location - (Project) | State Name | Dimension | The state name for this Location. |
Project | Location - (Project) | Country Code | Dimension | The country code for this Location |
Project | Location - (Project) | Postal Code | Dimension | The postal code for this Location |
Project | Location - (Project) | Longitude | Dimension | The longitude for this Location |
Project | Location - (Project) | Latitude | Dimension | The latitude for this Location |
|
|
|
|
|
Activity |
|
|
|
|
Activity | General - (Activity) |
|
| General Activity Information |
Activity | General - (Activity) | Activity ID | Dimension | A short ID which uniquely identifies the activity within the project. |
Activity | General - (Activity) | Activity Name | Dimension | The name of the activity. The activity name does not have to be unique. |
Activity | General - (Activity) | Activity Owner Id | Dimension | The ID of the owner of the activity. |
Activity | General - (Activity) | Activity Owner | Dimension | The name of activity owner. |
Activity | General - (Activity) | Activity Status | Dimension | The current status of the activity, either Not Started, In Progress, or Completed. |
Activity | General - (Activity) | Activity Type | Dimension | The type of activity, either 'Task Dependent', 'Resource Dependent', 'Level of Effort', 'Start Milestone' or 'Finish Milestone'. A Task Dependent activity is scheduled using the activity's calendar rather than the calendars of the assigned resources. A Resource Dependent activity is scheduled using the calendars of the assigned resources. This type is used when several resources are assigned to the activity, but they may work separately. A Start/Finish Milestone is a zero-duration activity, marking a significant start/end of project event. A Level of Effort activity has a duration which is determined by its dependent activities. Administration-type activities are typically level of effort. |
Activity | General - (Activity) | Auto Compute Actuals | Dimension | Identifies whether the actual and remaining units, start date, finish date, and percent complete for the activity are computed automatically using the planned dates, budgeted units and the activity's schedule percent complete. If this option is selected, the actual/remaining units and actual dates are automatically updated when project actuals are applied. This assumes that all work for the activity proceeds according to plan. |
Activity | General - (Activity) | Duration Type | Dimension | The duration type of the activity. One of Fixed Units per Time, Fixed Duration, or Fixed Units. For Fixed Units per Time activities, the resource units per time are constant when the activity duration or units are changed. This type is used when an activity has fixed resources with fixed productivity output per time period. For Fixed Duration activities, the activity duration is constant as the units or resource units per time are changed. This type is used when the activity is to be completed within a fixed time period regardless of the resources assigned. For Fixed Units activities, the activity units are constant when the duration or resource units per time are changed. This type is used when the total amount of work is fixed, and increasing the resources can decrease the activity duration. |
Activity | General - (Activity) | Is Critical | Dimension | Indicates whether the activity is critical. An activity is critical when its Total Float is below the critical duration specified for the project. Delaying critical activities will delay the finish date of the project. |
Activity | General - (Activity) | Percent Complete Type | Dimension | The activity percent complete type is one of Duration, Units, or Physical. The percent complete type controls whether the Activity % Complete is tied to the Duration % Complete, the Units % Complete, or the Physical % Complete for the activity. Set the percent complete type to Duration for activities which are duration driven, for example, administration tasks and training classes. Set the percent complete type to Physical for activities which are work-product driven, for example, creating a document or a product. Set the percent complete type to Units for activities which are work effort driven, for example, providing a consulting service. |
Activity | General - (Activity) | Primary Constraint Type | Dimension | The type of constraint applied to the activity start or finish date. Activity constraints are used by the project scheduler. Start date constraints are 'Start On', 'Start On or Before', 'Start On or After' and 'Mandatory Start'. Finish date constraints are 'Finish On', 'Finish On or Before', 'Finish On or After' and 'Mandatory Finish'. Another type of constraint, 'As Late as Possible', schedules the activity as late as possible based on the available free float. |
Activity | General - (Activity) | Secondary Constraint Type | Dimension | The second type of constraint applied to the activity start or finish date. |
Activity | Dates - (Activity) |
|
| Activity Dates |
Activity | Dates - (Activity) | Actual Finish | Dimension | The date on which the activity actually finished |
Activity | Dates - (Activity) | Actual Start | Dimension | The date on which the activity actually started |
Activity | Dates - (Activity) | Baseline Project Finish | Dimension | The Project Baseline Planned Finish Date |
Activity | Dates - (Activity) | Baseline Project Start | Dimension | The Project Baseline Planned Start Date |
Activity | Dates - (Activity) | Early Finish | Dimension | The earliest possible date the activity can finish. This date is calculated by the project scheduler based on activity relationships, schedule constraints, and resource availability. |
Activity | Dates - (Activity) | Early Start | Dimension | The earliest possible date the remaining work for the activity can begin. This date is calculated by the project scheduler based on activity relationships, schedule constraints, and resource availability. |
Activity | Dates - (Activity) | Expected Finish | Dimension | The date the activity is expected to finish. Typically, this date is entered in the Timesheets module by the primary resource. |
Activity | Dates - (Activity) | Finish | Dimension | The current finish date of the activity. Set to the activity remaining early finish date while the activity is not started or in progress, and the actual finish date once the activity is completed. |
Activity | Dates - (Activity) | Late Finish | Dimension | The latest possible date the activity must finish without delaying the project finish date. This date is calculated by the project scheduler based on activity relationships, schedule constraints, and resource availability. |
Activity | Dates - (Activity) | Late Start | Dimension | The latest possible date the remaining work for the activity must begin without delaying the project finish date. This date is computed by the project scheduler based on network logic, schedule constraints, and resource availability. |
Activity | Dates - (Activity) | Planned Finish | Dimension | The date the activity is scheduled to finish. This date is computed by the project scheduler but can be updated manually by the project manager. This date is not changed by the project scheduler after the activity has been started. |
Activity | Dates - (Activity) | Planned Start | Dimension | The date the activity is scheduled to begin. This date is computed by the project scheduler but can be updated manually by the project manager. This date is not changed by the project scheduler after the activity has been started. |
Activity | Dates - (Activity) | Primary Constraint Date | Dimension | The constraint date for the activity, if the activity has a constraint. The activity's constraint type determines whether this is a start date or finish date. Activity constraints are used by the project scheduler. |
Activity | Dates - (Activity) | Remaining Early Finish | Dimension | The date the remaining work for the activity is scheduled to finish. This date is computed by the project scheduler but can be updated manually by the project manager. Before the activity is started, the remaining finish date is the same as the planned finish date. This is the finish date that Progress Reporter users follow. |
Activity | Dates - (Activity) | Remaining Early Start | Dimension | The date the remaining work for the activity is scheduled to begin. This date is computed by the project scheduler but can be updated manually by the project manager. Before the activity is started, the remaining start date is the same as the planned start date. This is the start date that Progress Reporter users follow. |
Activity | Dates - (Activity) | Remaining Late Finish | Dimension | Remaining late end date as calculated by the scheduler |
Activity | Dates - (Activity) | Remaining Late Start | Dimension | Remaining late start date as calculated by the scheduler |
Activity | Dates - (Activity) | Resume Date | Dimension | The date progress is resumed on an activity |
Activity | Dates - (Activity) | Secondary Constraint Date | Dimension | The second constraint date for the activity, if the activity has a constraint |
Activity | Dates - (Activity) | Start | Dimension | The current start date of the activity. Set to the activity remaining early start date while the activity is not started, and the actual start date once the activity is started. |
Activity | Dates - (Activity) | Suspend Date | Dimension | The date progress is suspended on an activity |
Activity | Durations - (Activity) |
|
| Activity Durations |
Activity | Durations - (Activity) | Actual Duration | Dimension | Actual duration is the total working time from the activity actual start date to the actual finish date (for completed activities), or to the current data date (for in-progress activities). The actual working time is computed using the activity's calendar. |
Activity | Durations - (Activity) | At Completion Duration | Dimension | The duration at completion is the total working time from the activity's current start date to the current finish date. The current start date is the planned start date until the activity is started, then it is the actual start date. The current finish date is the activity planned finish date while the activity is not started, the remaining finish date while the activity is in progress, and the actual finish date once the activity is completed. The total working time is computed using the activity's calendar. |
Activity | Durations - (Activity) | Baseline Duration | Dimension | The duration for the activity in the primary baseline |
Activity | Durations - (Activity) | Baseline Planned Duration | Dimension | Baseline Planned Duration is the total working time from the baseline activity planned start date to the baseline planned finish date. The baseline planned working time is computed using the activity's calendar. |
Activity | Durations - (Activity) | Free Float | Dimension | The amount of time the activity can be delayed before delaying the start date of any successor activity. |
Activity | Durations - (Activity) | Original Duration | Dimension | Original Duration is the total working time from the activity planned start date to the planned finish date. The planned working time is computed using the activity's calendar. |
Activity | Durations - (Activity) | Remaining Duration | Dimension | Remaining duration is the total working time from the activity remaining start date to the remaining finish date. The remaining working time is computed using the activity's calendar. Before the activity is started, the remaining duration is the same as the Original Duration. After the activity is completed the remaining duration is zero. |
Activity | Durations - (Activity) | Remaining Float | Dimension | The amount of time remaining by which the activity can be delayed before delaying the project finish date. Computed as Late Finish - Remaining Finish. If the remaining finish is the same as the early finish ( in general, when the activity is not started), then the remaining float is the same as the total float. |
Activity | Durations - (Activity) | Total Float | Dimension | The amount of time the activity can be delayed before delaying the project finish date. Total float can be computed as Late Start - Early Start or as Late Finish - Early Finish; this option can be set when running the project scheduler. |
Activity | Percent Completes - (Activity) |
|
|
|
Activity | Percent Completes - (Activity) | Duration Percent Complete | Dimension | The percent complete of the activity duration. Computed as (Original Duration - Remaining Duration)/Original Duration * 100. Always in the range 0 to 100. The Original Duration is taken from the current plan, not from the baseline. |
Activity | Percent Completes - (Activity) | Labor Units % Complete | Dimension | The percent complete of units for all labor resources for the activity. Computed as Actual Labor Units / At Completion Labor Units * 100. Always in the range 0 to 100. |
Activity | Percent Completes - (Activity) | Nonlabor Units % Complete | Dimension | The percent complete of units for all nonlabor resources for the activity. Computed as Actual Nonlabor Units / At Completion Nonlabor Units * 100. Always in the range 0 to 100. |
Activity | Percent Completes - (Activity) | Percent Complete | Dimension | The activity percent complete. This value is tied to the activity Duration % Complete, Units % Complete, or Physical % Complete, depending on the setting for the activity's Percent Complete Type, which is one of Duration, Units, or Physical. Always in the range 0 to 100. |
Activity | Percent Completes - (Activity) | Performance % Complete | Dimension | The activity performance percent complete. The performance percent complete is used to compute earned value and may be based on the Activity % Complete, on the 0/100 rule, on the 50/50 rule, etc., depending on the technique for computing earned-value percent complete for the activity's WBS. The Performance % Complete specifies what percentage of the activity's planned worth has been earned so far. |
Activity | Percent Completes - (Activity) | Physical % Complete | Dimension | The physical percent complete can either be user entered or calculated from the activity's weighted steps. There is a project setting specifying this. |
Activity | Percent Completes - (Activity) | Schedule % Complete | Dimension | The activity schedule percent complete. The Schedule % Complete specifies how much of the activity's baseline duration has been completed so far. Computed based on where the current data date falls between the activity's baseline start and finish dates. If the data date is earlier than the baseline Start, the Schedule % Complete is 0. If the data date is later than the baseline Finish, the Schedule % Complete is 100. The Schedule % Complete indicates how much of the activity duration should be currently completed, relative to the selected baseline. |
Activity | Percent Completes - (Activity) | Units % Complete | Dimension | The percent complete of units for all labor and nonlabor resources assigned to the activity. Computed as Actual Units / At Completion Units * 100. Always in the range 0 to 100. |
|
|
|
|
|
Resource | General - (Resource) |
|
| General Resource Information |
Resource | General - (Resource) | Resource ID | Dimension | A short code which uniquely identifies the resource |
Resource | General - (Resource) | Resource Name | Dimension | The name of the resource
|
Resource | General - (Resource) | Resource Title | Dimension | The title of the resource |
Resource | General - (Resource) | Resource Type | Dimension | Indicates whether the resource is labor, nonlabor, or material |
Resource | General - (Resource) | Active Flag | Dimension | Indicates whether the resource is currently active. Nonactive resources may have left the organization but are not deleted from the system since they may have actual hours. |
Resource | General - (Resource) | Primary Role Object Id | Dimension | The unique Id of the role that is assigned as the resource's primary role |
Resource | General - (Resource) | Primary Role Name | Dimension | The name of the role that is assigned as the resource's primary role |
Resource | General - (Resource) | Datasource Id | Dimension | A unique source Id created for the Primavera data source being used. Used to identify data sources when using multiple Primavera data sources. |
Resource | Resource Hierarchy - (Resource) |
|
| Resource Hierarchy |
Resource | Resource Hierarchy - (Resource) | Full Path Name | Dimension | Full Path Name |
Resource | Resource Hierarchy - (Resource) | Resource ID | Dimension | Resource ID |
Resource | Resource Hierarchy - (Resource) | Resource ID Level 1 | Dimension | Resource ID Level 1 |
Resource | Resource Hierarchy - (Resource) | Resource ID Level 10 | Dimension | Resource ID Level 10 |
Resource | Resource Hierarchy - (Resource) | Resource ID Level 11 | Dimension | Resource ID Level 11 |
Resource | Resource Hierarchy - (Resource) | Resource ID Level 12 | Dimension | Resource ID Level 12 |
Resource | Resource Hierarchy - (Resource) | Resource ID Level 13 | Dimension | Resource ID Level 13 |
Resource | Resource Hierarchy - (Resource) | Resource ID Level 14 | Dimension | Resource ID Level 14 |
Resource | Resource Hierarchy - (Resource) | Resource ID Level 15 | Dimension | Resource ID Level 15 |
Resource | Resource Hierarchy - (Resource) | Resource ID Level 16 | Dimension | Resource ID Level 16 |
Resource | Resource Hierarchy - (Resource) | Resource ID Level 17 | Dimension | Resource ID Level 17 |
Resource | Resource Hierarchy - (Resource) | Resource ID Level 18 | Dimension | Resource ID Level 18 |
Resource | Resource Hierarchy - (Resource) | Resource ID Level 19 | Dimension | Resource ID Level 19 |
Resource | Resource Hierarchy - (Resource) | Resource ID Level 2 | Dimension | Resource ID Level 2 |
Resource | Resource Hierarchy - (Resource) | Resource ID Level 20 | Dimension | Resource ID Level 20 |
Resource | Resource Hierarchy - (Resource) | Resource ID Level 21 | Dimension | Resource ID Level 21 |
Resource | Resource Hierarchy - (Resource) | Resource ID Level 22 | Dimension | Resource ID Level 22 |
Resource | Resource Hierarchy - (Resource) | Resource ID Level 23 | Dimension | Resource ID Level 23 |
Resource | Resource Hierarchy - (Resource) | Resource ID Level 24 | Dimension | Resource ID Level 24 |
Resource | Resource Hierarchy - (Resource) | Resource ID Level 3 | Dimension | Resource ID Level 3 |
Resource | Resource Hierarchy - (Resource) | Resource ID Level 4 | Dimension | Resource ID Level 4 |
Resource | Resource Hierarchy - (Resource) | Resource ID Level 5 | Dimension | Resource ID Level 5 |
Resource | Resource Hierarchy - (Resource) | Resource ID Level 6 | Dimension | Resource ID Level 6 |
Resource | Resource Hierarchy - (Resource) | Resource ID Level 7 | Dimension | Resource ID Level 7 |
Resource | Resource Hierarchy - (Resource) | Resource ID Level 8 | Dimension | Resource ID Level 8 |
Resource | Resource Hierarchy - (Resource) | Resource ID Level 9 | Dimension | Resource ID Level 9 |
Resource | Resource Hierarchy - (Resource) | Resource Level | Dimension | Resource Level |
Resource | Resource Hierarchy - (Resource) | Resource Name | Dimension | Resource Name |
Resource | Resource Hierarchy - (Resource) | Resource Name Level 1 | Dimension | Resource Name Level 1 |
Resource | Resource Hierarchy - (Resource) | Resource Name Level 10 | Dimension | Resource Name Level 10 |
Resource | Resource Hierarchy - (Resource) | Resource Name Level 11 | Dimension | Resource Name Level 11 |
Resource | Resource Hierarchy - (Resource) | Resource Name Level 12 | Dimension | Resource Name Level 12 |
Resource | Resource Hierarchy - (Resource) | Resource Name Level 13 | Dimension | Resource Name Level 13 |
Resource | Resource Hierarchy - (Resource) | Resource Name Level 14 | Dimension | Resource Name Level 14 |
Resource | Resource Hierarchy - (Resource) | Resource Name Level 15 | Dimension | Resource Name Level 15 |
Resource | Resource Hierarchy - (Resource) | Resource Name Level 16 | Dimension | Resource Name Level 16 |
Resource | Resource Hierarchy - (Resource) | Resource Name Level 17 | Dimension | Resource Name Level 17 |
Resource | Resource Hierarchy - (Resource) | Resource Name Level 18 | Dimension | Resource Name Level 18 |
Resource | Resource Hierarchy - (Resource) | Resource Name Level 19 | Dimension | Resource Name Level 19 |
Resource | Resource Hierarchy - (Resource) | Resource Name Level 2 | Dimension | Resource Name Level 2 |
Resource | Resource Hierarchy - (Resource) | Resource Name Level 20 | Dimension | Resource Name Level 20 |
Resource | Resource Hierarchy - (Resource) | Resource Name Level 21 | Dimension | Resource Name Level 21 |
Resource | Resource Hierarchy - (Resource) | Resource Name Level 22 | Dimension | Resource Name Level 22 |
Resource | Resource Hierarchy - (Resource) | Resource Name Level 23 | Dimension | Resource Name Level 23 |
Resource | Resource Hierarchy - (Resource) | Resource Name Level 24 | Dimension | Resource Name Level 24 |
Resource | Resource Hierarchy - (Resource) | Resource Name Level 3 | Dimension | Resource Name Level 3 |
Resource | Resource Hierarchy - (Resource) | Resource Name Level 4 | Dimension | Resource Name Level 4 |
Resource | Resource Hierarchy - (Resource) | Resource Name Level 5 | Dimension | Resource Name Level 5 |
Resource | Resource Hierarchy - (Resource) | Resource Name Level 6 | Dimension | Resource Name Level 6 |
Resource | Resource Hierarchy - (Resource) | Resource Name Level 7 | Dimension | Resource Name Level 7 |
Resource | Resource Hierarchy - (Resource) | Resource Name Level 8 | Dimension | Resource Name Level 8 |
Resource | Resource Hierarchy - (Resource) | Resource Name Level 9 | Dimension | Resource Name Level 9 |
Resource | Resource Hierarchy - (Resource) | Resource Unique ID | Dimension | Resource Unique ID |
Resource | Resource Hierarchy - (Resource) | Resource Unique ID Level 1 | Dimension | Resource Unique ID Level 1 |
Resource | Resource Hierarchy - (Resource) | Resource Unique ID Level 10 | Dimension | Resource Unique ID Level 10 |
Resource | Resource Hierarchy - (Resource) | Resource Unique ID Level 11 | Dimension | Resource Unique ID Level 11 |
Resource | Resource Hierarchy - (Resource) | Resource Unique ID Level 12 | Dimension | Resource Unique ID Level 12 |
Resource | Resource Hierarchy - (Resource) | Resource Unique ID Level 13 | Dimension | Resource Unique ID Level 13 |
Resource | Resource Hierarchy - (Resource) | Resource Unique ID Level 15 | Dimension | Resource Unique ID Level 15 |
Resource | Resource Hierarchy - (Resource) | Resource Unique ID Level 16 | Dimension | Resource Unique ID Level 16 |
Resource | Resource Hierarchy - (Resource) | Resource Unique ID Level 17 | Dimension | Resource Unique ID Level 17 |
Resource | Resource Hierarchy - (Resource) | Resource Unique ID Level 18 | Dimension | Resource Unique ID Level 18 |
Resource | Resource Hierarchy - (Resource) | Resource Unique ID Level 19 | Dimension | Resource Unique ID Level 19 |
Resource | Resource Hierarchy - (Resource) | Resource Unique ID Level 2 | Dimension | Resource Unique ID Level 2 |
Resource | Resource Hierarchy - (Resource) | Resource Unique ID Level 20 | Dimension | Resource Unique ID Level 20 |
Resource | Resource Hierarchy - (Resource) | Resource Unique ID Level 21 | Dimension | Resource Unique ID Level 21 |
Resource | Resource Hierarchy - (Resource) | Resource Unique ID Level 22 | Dimension | Resource Unique ID Level 22 |
Resource | Resource Hierarchy - (Resource) | Resource Unique ID Level 23 | Dimension | Resource Unique ID Level 23 |
Resource | Resource Hierarchy - (Resource) | Resource Unique ID Level 24 | Dimension | Resource Unique ID Level 24 |
Resource | Resource Hierarchy - (Resource) | Resource Unique ID Level 3 | Dimension | Resource Unique ID Level 3 |
Resource | Resource Hierarchy - (Resource) | Resource Unique ID Level 4 | Dimension | Resource Unique ID Level 4 |
Resource | Resource Hierarchy - (Resource) | Resource Unique ID Level 5 | Dimension | Resource Unique ID Level 5 |
Resource | Resource Hierarchy - (Resource) | Resource Unique ID Level 6 | Dimension | Resource Unique ID Level 6 |
Resource | Resource Hierarchy - (Resource) | Resource Unique ID Level 7 | Dimension | Resource Unique ID Level 7 |
Resource | Resource Hierarchy - (Resource) | Resource Unique ID Level 8 | Dimension | Resource Unique ID Level 8 |
Resource | Resource Hierarchy - (Resource) | Resource Unique ID Level 9 | Dimension | Resource Unique ID Level 9 |
Resource | Resource Hierarchy - (Resource) | Root Level Resource ID | Dimension | Root Level Resource ID |
Resource | Resource Hierarchy - (Resource) | Root Level Resource Name | Dimension | Root Level Resource Name |
Resource | Resource Hierarchy - (Resource) | Root Level Resource Unique ID | Dimension | Root Level Resource Unique ID |
|
|
|
|
|
Assignment | General - (Assignment) |
|
|
|
Assignment | General - (Assignment) | Resource Name | Dimension | The name of the resource for this assignment |
Assignment | General - (Assignment) | Role Name | Dimension | The name of the role for this assignment |
Assignment | Dates- (Assignment) |
|
|
|
Assignment | Dates- (Assignment) | Actual Finish | Dimension | The date on which the assignment is complete. |
Assignment | Dates- (Assignment) | Actual Start | Dimension | The date on which the assignment actually started. |
Assignment | Dates- (Assignment) | Planned Finish | Dimension | The date the assignment is scheduled to be finished. |
Assignment | Dates- (Assignment) | Planned Start | Dimension | The date work on the assignment is scheduled to begin. |
Assignment | Dates- (Assignment) | Remaining Finish | Dimension | The date the assignment is scheduled to be finished. This date can be updated manually by the user. Before the activity is started, this date is the same as the Planned Finish date. |
Assignment | Dates- (Assignment) | Remaining Start | Dimension | The date the assignment is scheduled to begin. This date can be updated manually by the user. Before the activity is started, this date is the same as the Planned Start date. |
|
|
|
|
|
WBS | WBS Hierarchy - (WBS) |
|
| WBS Hierarchy |
WBS | WBS Hierarchy - (WBS) | Full Path Name | Dimension | Full path for wbs hierarchy |
WBS | WBS Hierarchy - (WBS) | WBS Code (Project Level) | Dimension | A short code assigned to each WBS element for identification. Each WBS element is uniquely identified by concatenating its own code together with its parents codes |
WBS | WBS Hierarchy - (WBS) | WBS Name (Project Level) | Dimension | The name of the WBS element |
WBS | WBS Hierarchy - (WBS) | WBS ID Level 1 | Dimension | WBS ID Level 1 |
WBS | WBS Hierarchy - (WBS) | WBS ID Level 10 | Dimension | WBS ID Level 10 |
WBS | WBS Hierarchy - (WBS) | WBS ID Level 11 | Dimension | WBS ID Level 11 |
WBS | WBS Hierarchy - (WBS) | WBS ID Level 12 | Dimension | WBS ID Level 12 |
WBS | WBS Hierarchy - (WBS) | WBS ID Level 13 | Dimension | WBS ID Level 13 |
WBS | WBS Hierarchy - (WBS) | WBS ID Level 14 | Dimension | WBS ID Level 14 |
WBS | WBS Hierarchy - (WBS) | WBS ID Level 15 | Dimension | WBS ID Level 15 |
WBS | WBS Hierarchy - (WBS) | WBS ID Level 16 | Dimension | WBS ID Level 16 |
WBS | WBS Hierarchy - (WBS) | WBS ID Level 17 | Dimension | WBS ID Level 17 |
WBS | WBS Hierarchy - (WBS) | WBS ID Level 2 | Dimension | WBS ID Level 2 |
WBS | WBS Hierarchy - (WBS) | WBS ID Level 3 | Dimension | WBS ID Level 3 |
WBS | WBS Hierarchy - (WBS) | WBS ID Level 4 | Dimension | WBS ID Level 4 |
WBS | WBS Hierarchy - (WBS) | WBS ID Level 5 | Dimension | WBS ID Level 5 |
WBS | WBS Hierarchy - (WBS) | WBS ID Level 6 | Dimension | WBS ID Level 6 |
WBS | WBS Hierarchy - (WBS) | WBS ID Level 7 | Dimension | WBS ID Level 7 |
WBS | WBS Hierarchy - (WBS) | WBS ID Level 8 | Dimension | WBS ID Level 8 |
WBS | WBS Hierarchy - (WBS) | WBS ID Level 9 | Dimension | WBS ID Level 9 |
WBS | WBS Hierarchy - (WBS) | WBS Name Level 1 | Dimension | WBS Name Level 1 |
WBS | WBS Hierarchy - (WBS) | WBS Name Level 10 | Dimension | WBS Name Level 10 |
WBS | WBS Hierarchy - (WBS) | WBS Name Level 11 | Dimension | WBS Name Level 11 |
WBS | WBS Hierarchy - (WBS) | WBS Name Level 12 | Dimension | WBS Name Level 12 |
WBS | WBS Hierarchy - (WBS) | WBS Name Level 13 | Dimension | WBS Name Level 13 |
WBS | WBS Hierarchy - (WBS) | WBS Name Level 14 | Dimension | WBS Name Level 14 |
WBS | WBS Hierarchy - (WBS) | WBS Name Level 15 | Dimension | WBS Name Level 15 |
WBS | WBS Hierarchy - (WBS) | WBS Name Level 16 | Dimension | WBS Name Level 16 |
WBS | WBS Hierarchy - (WBS) | WBS Name Level 17 | Dimension | WBS Name Level 17 |
WBS | WBS Hierarchy - (WBS) | WBS Name Level 2 | Dimension | WBS Name Level 2 |
WBS | WBS Hierarchy - (WBS) | WBS Name Level 3 | Dimension | WBS Name Level 3 |
WBS | WBS Hierarchy - (WBS) | WBS Name Level 4 | Dimension | WBS Name Level 4 |
WBS | WBS Hierarchy - (WBS) | WBS Name Level 5 | Dimension | WBS Name Level 5 |
WBS | WBS Hierarchy - (WBS) | WBS Name Level 6 | Dimension | WBS Name Level 6 |
WBS | WBS Hierarchy - (WBS) | WBS Name Level 7 | Dimension | WBS Name Level 7 |
WBS | WBS Hierarchy - (WBS) | WBS Name Level 8 | Dimension | WBS Name Level 8 |
WBS | WBS Hierarchy - (WBS) | WBS Name Level 9 | Dimension | WBS Name Level9 |
|
|
|
|
|
Fact - Primavera - Lean Task | Metrics |
|
| Metrics |
Fact - Primavera - Resource Assignment | Metrics | # of Activities | Fact | # of Activities |
Fact - Primavera - Resource Assignment | Metrics | # of Projects | Fact | # of Projects |
Fact - Primavera - Resource Assignment | Metrics | # of Tasks | Fact | # of Resources |
Fact - Primavera Cloud - Resource Assignment | Units |
|
| Units |
Fact - Primavera - Resource Assignment | Units | Actual Overtime Units | Fact | Actual Overtime Units |
Fact - Primavera - Resource Assignment | Units | Actual Regular Units | Fact | Actual Regular Units |
Fact - Primavera - Resource Assignment | Units | Actual Units | Fact | Actual Units |
Fact - Primavera - Resource Assignment | Units | At Completion Units | Fact | At Completion Units |
Fact - Primavera - Resource Assignment | Units | Planned Units | Fact | Planned Units |
Fact - Primavera - Resource Assignment | Units | Remaining Late Units | Fact | Remaining Late Units |
Fact - Primavera - Resource Assignment | Units | Remaining Units | Fact | Remaining Units |
Fact - Primavera - Resource Assignment | Units | Staffed Remaining Late Units | Fact | Staffed Remaining Late Units |
Fact - Primavera - Resource Assignment | Units | Staffed Remaining Units | Fact | Staffed Remaining Units |
Fact - Primavera - Resource Assignment | Units | Unstaffed Remaining Late Units | Fact | Unstaffed Remaining Late Units |
Fact - Primavera - Resource Assignment | Units | Unstaffed Remaining Units | Fact | Unstaffed Remaining Units |