Primavera Cloud - Risk

Description: Use this subject area to analyze risk data at the project level. The data can be aggregated and displayed with its associated project, workspace, and risks.

Folder

SubFolder

Field Name

Dimension/ Fact / Lookup

Description

Activity

Costs - (Activity)

 

 

 

Activity

Costs - (Activity)

Actual Schedule Cost

Dimension

The date on which the activity actually started

Activity

Costs - (Activity)

At Completion Schedule Cost

Dimension

The date on which the activity actually started

Activity

Costs - (Activity)

Planned Schedule Cost

Dimension

The date on which the activity actually started.

Activity

Costs - (Activity)

Remaining Schedule Cost

Dimension

The date on which the activity actually started.

Activity

Dates - (Activity)

 

 

 

Activity

Dates - (Activity)

Actual Finish

Dimension

The date on which the activity actually finished.

Activity

Dates - (Activity)

Actual Start

Dimension

The date on which the activity actually started.

Activity

Dates - (Activity)

Baseline Project Finish

Dimension

The Project Baseline Planned Finish Date.

Activity

Dates - (Activity)

Baseline Project Start

Dimension

The Project Baseline Planned Start Date.

Activity

Dates - (Activity)

Early Finish

Dimension

The earliest possible date the activity can finish. This date is calculated by the project scheduler based on activity relationships, schedule constraints, and resource availability.

Activity

Dates - (Activity)

Early Start

Dimension

The earliest possible date the remaining work for the activity can begin. This date is calculated by the project scheduler based on activity relationships, schedule constraints, and resource availability.

Activity

Dates - (Activity)

Expected Finish

Dimension

The date the activity is expected to finish. Typically, this date is entered in the Timesheets module by the primary resource.

Activity

Dates - (Activity)

Finish

Dimension

The current finish date of the activity. Set to the activity remaining early finish date while the activity is not started or in progress, and the actual finish date once the activity is completed.

Activity

Dates - (Activity)

Late Finish

Dimension

The latest possible date the activity must finish without delaying the project finish date. This date is calculated by the project scheduler based on activity relationships, schedule constraints, and resource availability.

Activity

Dates - (Activity)

Late Start

Dimension

The latest possible date the remaining work for the activity must begin without delaying the project finish date. This date is computed by the project scheduler based on network logic, schedule constraints, and resource availability.

Activity

Dates - (Activity)

Planned Finish

Dimension

The date the activity is scheduled to finish. This date is computed by the project scheduler but can be updated manually by the project manager. This date is not changed by the project scheduler after the activity has been started.

Activity

Dates - (Activity)

Planned Start

Dimension

The date the activity is scheduled to begin. This date is computed by the project scheduler but can be updated manually by the project manager. This date is not changed by the project scheduler after the activity has been started.

Activity

Dates - (Activity)

Primary Constraint Date

Dimension

The constraint date for the activity, if the activity has a constraint. The activity's constraint type determines whether this is a start date or finish date. Activity constraints are used by the project scheduler.

Activity

Dates - (Activity)

Remaining Early Finish

Dimension

The date the remaining work for the activity is scheduled to finish. This date is computed by the project scheduler but can be updated manually by the project manager. Before the activity is started, the remaining finish date is the same as the planned finish date. This is the finish date that Progress Reporter users follow.

Activity

Dates - (Activity)

Remaining Early Start

Dimension

The date the remaining work for the activity is scheduled to begin. This date is computed by the project scheduler but can be updated manually by the project manager. Before the activity is started, the remaining start date is the same as the planned start date. This is the start date that Progress Reporter users follow.

Activity

Dates - (Activity)

Remaining Late Finish

Dimension

Remaining late end date as calculated by the scheduler.

Activity

Dates - (Activity)

Remaining Late Start

Dimension

Remaining late start date as calculated by the scheduler.

Activity

Dates - (Activity)

Resume Date

Dimension

The date progress is resumed on an activity.

Activity

Dates - (Activity)

Secondary Constraint Date

Dimension

The second constraint date for the activity, if the activity has a constraint.

Activity

Dates - (Activity)

Start

Dimension

The current start date of the activity. Set to the activity remaining early start date while the activity is not started, and the actual start date once the activity is started.

Activity

Dates - (Activity)

Suspend Date

Dimension

The date progress is suspended on an activity.

Activity

Durations - (Activity)

 

 

 

Activity

Durations - (Activity)

Actual Duration

Dimension

Actual duration is the total working time from the activity actual start date to the actual finish date (for completed activities), or to the current data date (for in-progress activities). The actual working time is computed using the activitys calendar.

Activity

Durations - (Activity)

At Completion Duration

Dimension

The duration at completion is the total working time from the activitys current start date to the current finish date. The current start date is the planned start date until the activity is started, then it is the actual start date. The current finish date is the activity planned finish date while the activity is not started, the remaining finish date while the activity is in progress, and the actual finish date once the activity is completed. The total working time is computed using the activitys calendar.

Activity

Durations - (Activity)

Baseline Project Duration

Dimension

The duration for the activity in the primary baseline

Activity

Durations - (Activity)

Baseline Planned Duration

Dimension

Baseline Planned Duration is the total working time from the baseline activity planned start date to the baseline planned finish date. The baseline planned working time is computed using the activitys calendar.

Activity

Durations - (Activity)

Free Float

Dimension

The amount of time the activity can be delayed before delaying the start date of any successor activity.

Activity

Durations - (Activity)

Original Duration

Dimension

Original Duration is the total working time from the activity planned start date to the planned finish date. The planned working time is computed using the activitys calendar.

Activity

Durations - (Activity)

Remaining Duration

Dimension

Remaining duration is the total working time from the activity remaining start date to the remaining finish date. The remaining working time is computed using the activitys calendar. Before the activity is started, the remaining duration is the same as the Original Duration. After the activity is completed the remaining duration is zero.

Activity

Durations - (Activity)

Remaining Float

Dimension

The amount of time remaining by which the activity can be delayed before delaying the project finish date. Computed as Late Finish - Remaining Finish. If the remaining finish is the same as the early finish ( in general, when the activity is not started), then the remaining float is the same as the total float.

Activity

Durations - (Activity)

Total Float

Dimension

The amount of time the activity can be delayed before delaying the project finish date. Total float can be computed as Late Start - Early Start or as Late Finish - Early Finish; this option can be set when running the project scheduler.

Activity

General - (Activity)

 

 

 

Activity

General - (Activity)

Activity ID

Dimension

A short ID which uniquely identifies the activity within the project.

Activity

General - (Activity)

Activity Name

Dimension

The name of the activity. The activity name does not have to be unique.

Activity

General - (Activity)

Activity Status

Dimension

The current status of the activity, either Not Started, In Progress, or Completed.

Activity

General - (Activity)

Activity Type

Dimension

The type of activity, either Task Dependent, Resource Dependent, Level of Effort, Start Milestone or Finish Milestone. A Task Dependent activity is scheduled using the activitys calendar rather than the calendars of the assigned resources. A Resource Dependent activity is scheduled using the calendars of the assigned resources. This type is used when several resources are assigned to the activity, but they may work separately. A Start/Finish Milestone is a zero-duration activity, marking a significant start/end of project event. A Level of Effort activity has a duration which is determined by its dependent activities. Administration-type activities are typically level of effort.

Activity

General - (Activity)

Auto Compute Actuals

Dimension

Identifies whether the actual and remaining units, start date, finish date, and percent complete for the activity are computed automatically using the planned dates, budgeted units and the activitys schedule percent complete. If this option is selected, the actual/remaining units and actual dates are automatically updated when project actuals are applied. This assumes that all work for the activity proceeds according to plan.

Activity

General - (Activity)

Duration Type

Dimension

The duration type of the activity. One of Fixed Units per Time, Fixed Duration, or Fixed Units. For Fixed Units per Time activities, the resource units per time are constant when the activity duration or units are changed. This type is used when an activity has fixed resources with fixed productivity output per time period. For Fixed Duration activities, the activity duration is constant as the units or resource units per time are changed. This type is used when the activity is to be completed within a fixed time period regardless of the resources assigned. For Fixed Units activities, the activity units are constant when the duration or resource units per time are changed. This type is used when the total amount of work is fixed, and increasing the resources can decrease the activity duration.

Activity

General - (Activity)

Critical

Dimension

Indicates whether the activity is critical. An activity is critical when its Total Float is below the critical duration specified for the project. Delaying critical activities will delay the finish date of the project.

Activity

General - (Activity)

Percent Complete Type

Dimension

title="The activity percent complete type is one of Duration, Units, or Physical. The percent complete type controls whether the Activity % Complete is tied to the Duration % Complete, the Units % Complete, or the Physical % Complete for the activity. Set the percent complete type to Duration for activities which are duration driven, for example, administration tasks and training classes. Set the percent complete type to Physical for activities which are work-product driven, for example, creating a document or a product. Set the percent complete type to Units for activities which are work effort driven, for example, providing a consulting service."

Activity

General - (Activity)

Primary Constraint

Dimension

The type of constraint applied to the activity start or finish date. Activity constraints are used by the project scheduler. Start date constraints are Start On, Start On or Before, Start On or After and Mandatory Start. Finish date constraints are Finish On, Finish On or Before, Finish On or After and Mandatory Finish. Another type of constraint, As Late as Possible, schedules the activity as late as possible based on the available free float.

Activity

General - (Activity)

Secondary Constraint

Dimension

The second type of constraint applied to the activity start or finish date.

Activity

Percent Completes - (Activity)

 

 

 

Activity

Percent Completes - (Activity)

Duration % Complete

Dimension

The percent complete of the activity duration. Computed as (Original Duration - Remaining Duration)/Original Duration * 100. Always in the range 0 to 100. The Original Duration is taken from the current plan, not from the baseline.

Activity

Percent Completes - (Activity)

Labor Units % Complete

Dimension

The percent complete of units for all labor resources for the activity. Computed as Actual Labor Units / At Completion Labor Units * 100. Always in the range 0 to 100.

Activity

Percent Completes - (Activity)

Nonlabor Units % Complete

Dimension

The percent complete of units for all nonlabor resources for the activity. Computed as Actual Nonlabor Units / At Completion Nonlabor Units * 100. Always in the range 0 to 100.

Activity

Percent Completes - (Activity)

Percent Complete

Dimension

The activity percent complete. This value is tied to the activity Duration % Complete, Units % Complete, or Physical % Complete, depending on the setting for the activity's Percent Complete Type, which is one of Duration, Units, or Physical. Always in the range 0 to 100.

Activity

Percent Completes - (Activity)

Performance % Complete

Dimension

The activity performance percent complete. The performance percent complete is used to compute earned value and may be based on the Activity % Complete, on the 0/100 rule, on the 50/50 rule, etc., depending on the technique for computing earned-value percent complete for the activity's WBS. The Performance % Complete specifies what percentage of the activity's planned worth has been earned so far.

Activity

Percent Completes - (Activity)

Physical % Complete

Dimension

The physical percent complete can either be user entered or calculated from the activity's weighted steps. There is a project setting specifying this.

Activity

Percent Completes - (Activity)

Schedule % Complete

Dimension

The activity schedule percent complete. The Schedule % Complete specifies how much of the activity's baseline duration has been completed so far. Computed based on where the current data date falls between the activity's baseline start and finish dates. If the data date is earlier than the baseline Start, the Schedule % Complete is 0. If the data date is later than the baseline Finish, the Schedule % Complete is 100. The Schedule % Complete indicates how much of the activity duration should be currently completed, relative to the selected baseline.

Activity

Percent Completes - (Activity)

Units % Complete

Dimension

The percent complete of units for all labor and nonlabor resources assigned to the activity. Computed as Actual Units / At Completion Units * 100. Always in the range 0 to 100.

 

 

 

 

 

Fact - Primavera - Risk Folder

 

 

 

 

Fact - Primavera - Risk

Costs

 

 

 

Fact - Primavera - Risk

Costs

Actual Cost Impact

Fact

Actual Cost Impact

Fact - Primavera - Risk

Costs

Actual Response Cost

Fact

Actual Response Cost

Fact - Primavera - Risk

Costs

Contingency

Fact

Contingency

Fact - Primavera - Risk

Costs

Planned Response Cost

Fact

Planned Response Cost

Fact - Primavera - Risk

Costs

Post Exposure Cost

Fact

Post Exposure Cost

Fact - Primavera - Risk

Costs

Pre Exposure Cost

Fact

Pre Exposure Cost

Fact - Primavera - Risk

Costs

QT Post Threshold Cost

Fact

QT Post Threshold Cost

Fact - Primavera - Risk

Costs

QT Pre Threshold Cost

Fact

QT Pre Threshold Cost

Fact - Primavera - Risk

Post Response

 

 

 

Fact - Primavera - Risk

Post Response

Post Response Cost Mean

Fact

Post Response Cost Mean

Fact - Primavera - Risk

Post Response

Post Response Probability Mean

Fact

Post Response Probability Mean

Fact - Primavera - Risk

Post Response

Post Response Schedule Mean

Fact

Post Response Schedule Mean

Fact - Primavera - Risk

Post Response

Post Response Score

Fact

Post Response Score

Fact - Primavera - Risk

Pre Response

 

 

 

Fact - Primavera - Risk

Pre Response

Pre Response Cost Mean

Fact

Pre Response Cost Mean

Fact - Primavera - Risk

Pre Response

Pre Response Probability Mean

Fact

Pre Response Probability Mean

Fact - Primavera - Risk

Pre Response

Pre Response Schedule Mean

Fact

Pre Response Schedule Mean

Fact - Primavera - Risk

Pre Response

Pre Response Score

Fact

Pre Response Score

 

 

 

 

 

Mitigation Folder

 

 

 

 

Mitigation

General - (Mitigation)

 

 

General Mitigation Information

Mitigation

General - (Mitigation)

Added By

Dimension

Added By

Mitigation

General - (Mitigation)

Date Added

Dimension

Date Added

Mitigation

General - (Mitigation)

Date Last Modified

Dimension

Date Last Modified

Mitigation

General - (Mitigation)

Description

Dimension

Description

Mitigation

General - (Mitigation)

Last Modified By

Dimension

Last Modified By

Mitigation

General - (Mitigation)

Mitigation Finish Date

Dimension

Mitigation Finish Date

Mitigation

General - (Mitigation)

Mitigation Id

Dimension

Mitigation Id

Mitigation

General - (Mitigation)

Mitigation Name

Dimension

Mitigation Name

Mitigation

General - (Mitigation)

Unique Mitigation ID

Dimension

The Unique ID of the mitigation

Mitigation

General - (Mitigation)

Manager

Dimension

Manager

Mitigation

General - (Mitigation)

Mitigation Start Date

Dimension

Mitigation Start Date

Mitigation

General - (Mitigation)

Planned Mitigation Finish Date

Dimension

Planned Mitigation Finish Date

Mitigation

General - (Mitigation)

Planned Mitigation Start Date

Dimension

Planned Mitigation Start Date

Mitigation

General - (Mitigation)

Status

Dimension

Status

 

 

 

 

 

Risk Folder

 

 

 

 

Risk

General - (Risk)

 

 

General- (Risk)

Risk

General - (Risk)

Actual Schedule Impact

Dimension

Actual Schedule Impact

Risk

General - (Risk)

Added By

Dimension

Added By

Risk

General - (Risk)

Cause

Dimension

Cause

Risk

General - (Risk)

Date Added

Dimension

Date Added

Risk

General - (Risk)

Date Last Modified

Dimension

Date Last Modified

Risk

General - (Risk)

Effect

Dimension

Effect

Risk

General - (Risk)

Has Post Response Data

Dimension

Has Post Response Data

Risk

General - (Risk)

Identified By User Name

Dimension

Identified By User Name

Risk

General - (Risk)

Identified Date

Dimension

Identified Date

Risk

General - (Risk)

Impacted Date

Dimension

Impacted Date

Risk

General - (Risk)

Last Modified By

Dimension

Last Modified By

Risk

General - (Risk)

Override Cost Threshold

Dimension

Override Cost Threshold

Risk

General - (Risk)

Override Probability Threshold

Dimension

Override Probability Threshold

Risk

General - (Risk)

Override Schedule Threshold

Dimension

Override Schedule Threshold

Risk

General - (Risk)

Risk Description

Dimension

Risk Description

Risk

General - (Risk)

Risk Id

Dimension

Risk Id

Risk

General - (Risk)

Risk Name

Dimension

Risk Name

Risk

General - (Risk)

Unique Risk ID

Dimension

The Unique ID of the risk

Risk

General - (Risk)

Manager

Dimension

Manager

Risk

General - (Risk)

Risk Score

Dimension

Risk Score

Risk

General - (Risk)

Risk Status

Dimension

Risk Status

Risk

General - (Risk)

Risk Type

Dimension

Risk Type

Risk

Location - (Risk)

Location - (Risk)

 

 

Risk

Location - (Risk)

Address Line 1

Dimension

The first line of the address

Risk

Location - (Risk)

Address Line 2

Dimension

The second line of the address

Risk

Location - (Risk)

City Name

Dimension

The city name for this Location

Risk

Location - (Risk)

Country Code

Dimension

The country code for this Location

Risk

Location - (Risk)

Latitude

Dimension

The latitude for this Location

Risk

Location - (Risk)

Location Name

Dimension

The name of the location

Risk

Location - (Risk)

Longitude

Dimension

The longitude for this Location

Risk

Location - (Risk)

Postal Code

Dimension

The postal code for this Location

Risk

Location - (Risk)

State/Province

Dimension

State/Province

 

 

 

 

 

Mitigation Activity Folder

 

 

 

 

Mitigation Activity

Costs - (Mitigation Activity)

 

 

 

Mitigation Activity

Costs - (Mitigation Activity)

Actual Schedule Cost

Dimension

Actual Schedule Cost

Mitigation Activity

Costs - (Mitigation Activity)

At Completion Schedule Cost

Dimension

At Completion Schedule Cost

Mitigation Activity

Costs - (Mitigation Activity)

Planned Schedule Cost

Dimension

Planned Schedule Cost

Mitigation Activity

Costs - (Mitigation Activity)

Remaining Schedule Cost

Dimension

Remaining Schedule Cost

Mitigation Activity

Dates - (Mitigation Activity)

 

 

 

Mitigation Activity

Dates - (Mitigation Activity)

Actual Finish

Dimension

The date on which the activity actually finished

Mitigation Activity

Dates - (Mitigation Activity)

Actual Start

Dimension

The date on which the activity actually started

Mitigation Activity

Dates - (Mitigation Activity)

Baseline Project Finish

Dimension

The Project Baseline Planned Finish Date

Mitigation Activity

Dates - (Mitigation Activity)

Baseline Project Start

Dimension

The Project Baseline Planned Start Date

Mitigation Activity

Dates - (Mitigation Activity)

Early Finish

Dimension

The earliest possible date the activity can finish. This date is calculated by the project scheduler based on activity relationships, schedule constraints, and resource availability.

Mitigation Activity

Dates - (Mitigation Activity)

Early Start

Dimension

The earliest possible date the remaining work for the activity can begin. This date is calculated by the project scheduler based on activity relationships, schedule constraints, and resource availability.

Mitigation Activity

Dates - (Mitigation Activity)

Expected Finish

Dimension

The date the activity is expected to finish. Typically, this date is entered in the Timesheets module by the primary resource.

Mitigation Activity

Dates - (Mitigation Activity)

Finish

Dimension

The current finish date of the activity. Set to the activity remaining early finish date while the activity is not started or in progress, and the actual finish date once the activity is completed.

Mitigation Activity

Dates - (Mitigation Activity)

Late Finish

Dimension

The latest possible date the activity must finish without delaying the project finish date. This date is calculated by the project scheduler based on activity relationships, schedule constraints, and resource availability.

Mitigation Activity

Dates - (Mitigation Activity)

Late Start

Dimension

The latest possible date the remaining work for the activity must begin without delaying the project finish date. This date is computed by the project scheduler based on network logic, schedule constraints, and resource availability.

Mitigation Activity

Dates - (Mitigation Activity)

Planned Finish

Dimension

The date the activity is scheduled to finish. This date is computed by the project scheduler but can be updated manually by the project manager. This date is not changed by the project scheduler after the activity has been started.

Mitigation Activity

Dates - (Mitigation Activity)

Planned Start

Dimension

The date the activity is scheduled to begin. This date is computed by the project scheduler but can be updated manually by the project manager. This date is not changed by the project scheduler after the activity has been started.

Mitigation Activity

Dates - (Mitigation Activity)

Primary Constraint Date

Dimension

The constraint date for the activity, if the activity has a constraint. The activity's constraint type determines whether this is a start date or finish date. Activity constraints are used by the project scheduler.

Mitigation Activity

Dates - (Mitigation Activity)

Remaining Early Finish

Dimension

en|CD_Primavera_Cloud_-_Risk_Mitigation_Dates_-_(Mitigation_Activity)_Remaining_Early_Finish|The date the remaining work for the activity is scheduled to finish. This date is computed by the project scheduler but can be updated manually by the project manager. Before the activity is started, the remaining finish date is the same as the planned finish date. This is the finish date that Progress Reporter users follow.

Mitigation Activity

Dates - (Mitigation Activity)

Remaining Early Start

Dimension

The date the remaining work for the activity is scheduled to begin. This date is computed by the project scheduler but can be updated manually by the project manager. Before the activity is started, the remaining start date is the same as the planned start date. This is the start date that Progress Reporter users follow.

Mitigation Activity

Dates - (Mitigation Activity)

Remaining Late Finish

Dimension

Remaining late end date as calculated by the scheduler

Mitigation Activity

Dates - (Mitigation Activity)

Remaining Late Start

Dimension

Remaining late start date as calculated by the scheduler

Mitigation Activity

Dates - (Mitigation Activity)

Resume Date

Dimension

The date progress is resumed on an activity

Mitigation Activity

Dates - (Mitigation Activity)

Secondary Constraint Date

Dimension

The second constraint date for the activity, if the activity has a constraint

Mitigation Activity

Dates - (Mitigation Activity)

Start

Dimension

The current start date of the activity. Set to the activity remaining early start date while the activity is not started, and the actual start date once the activity is started.

Mitigation Activity

Dates - (Mitigation Activity)

Suspend Date

Dimension

The date progress is suspended on an activity

Mitigation Activity

Durations - (Mitigation Activity)

 

 

 

Mitigation Activity

Durations - (Mitigation Activity)

Actual Duration

Dimension

Actual duration is the total working time from the activity actual start date to the actual finish date (for completed activities), or to the current data date (for in-progress activities). The actual working time is computed using the activity's calendar.

Mitigation Activity

Durations - (Mitigation Activity)

At Completion Duration

Dimension

The duration at completion is the total working time from the activity's current start date to the current finish date. The current start date is the planned start date until the activity is started, then it is the actual start date. The current finish date is the activity planned finish date while the activity is not started, the remaining finish date while the activity is in progress, and the actual finish date once the activity is completed. The total working time is computed using the activity's calendar.

Mitigation Activity

Durations - (Mitigation Activity)

Baseline Project Duration

Dimension

The duration for the activity in the primary baseline

Mitigation Activity

Durations - (Mitigation Activity)

Baseline Planned Duration

Dimension

Baseline Planned Duration is the total working time from the baseline activity planned start date to the baseline planned finish date. The baseline planned working time is computed using the activity's calendar.

Mitigation Activity

Durations - (Mitigation Activity)

Free Float

Dimension

The amount of time the activity can be delayed before delaying the start date of any successor activity.

Mitigation Activity

Durations - (Mitigation Activity)

Original Duration

Dimension

Original Duration is the total working time from the activity planned start date to the planned finish date. The planned working time is computed using the activity's calendar.

Mitigation Activity

Durations - (Mitigation Activity)

Remaining Duration

Dimension

Remaining duration is the total working time from the activity remaining start date to the remaining finish date. The remaining working time is computed using the activity's calendar. Before the activity is started, the remaining duration is the same as the Original Duration. After the activity is completed the remaining duration is zero.

Mitigation Activity

Durations - (Mitigation Activity)

Remaining Float

Dimension

The amount of time remaining by which the activity can be delayed before delaying the project finish date. Computed as Late Finish - Remaining Finish. If the remaining finish is the same as the early finish ( in general, when the activity is not started), then the remaining float is the same as the total float.

Mitigation Activity

Durations - (Mitigation Activity)

Total Float

Dimension

The amount of time the activity can be delayed before delaying the project finish date. Total float can be computed as Late Start - Early Start or as Late Finish - Early Finish; this option can be set when running the project scheduler.

Mitigation Activity

General - (Mitigation Activity)

 

 

 

Mitigation Activity

General - (Mitigation Activity)

Activity ID

Dimension

A short ID which uniquely identifies the activity within the project.

Mitigation Activity

General - (Mitigation Activity)

Activity Name

Dimension

The name of the activity. The activity name does not have to be unique.

Mitigation Activity

General - (Mitigation Activity)

Activity Status

Dimension

The current status of the activity, either Not Started, In Progress, or Completed.

Mitigation Activity

General - (Mitigation Activity)

Activity Type

Dimension

The type of activity, either 'Task Dependent', 'Resource Dependent', 'Level of Effort', 'Start Milestone' or 'Finish Milestone'. A Task Dependent activity is scheduled using the activity's calendar rather than the calendars of the assigned resources. A Resource Dependent activity is scheduled using the calendars of the assigned resources. This type is used when several resources are assigned to the activity, but they may work separately. A Start/Finish Milestone is a zero-duration activity, marking a significant start/end of project event. A Level of Effort activity has a duration which is determined by its dependent activities. Administration-type activities are typically level of effort.

Mitigation Activity

General - (Mitigation Activity)

Auto Compute Actuals

Dimension

Identifies whether the actual and remaining units, start date, finish date, and percent complete for the activity are computed automatically using the planned dates, budgeted units and the activity's schedule percent complete. If this option is selected, the actual/remaining units and actual dates are automatically updated when project actuals are applied. This assumes that all work for the activity proceeds according to plan.

Mitigation Activity

General - (Mitigation Activity)

Duration Type

Dimension

The duration type of the activity. One of Fixed Units per Time, Fixed Duration, or Fixed Units. For Fixed Units per Time activities, the resource units per time are constant when the activity duration or units are changed. This type is used when an activity has fixed resources with fixed productivity output per time period. For Fixed Duration activities, the activity duration is constant as the units or resource units per time are changed. This type is used when the activity is to be completed within a fixed time period regardless of the resources assigned. For Fixed Units activities, the activity units are constant when the duration or resource units per time are changed. This type is used when the total amount of work is fixed, and increasing the resources can decrease the activity duration.

Mitigation Activity

General - (Mitigation Activity)

Critical

Dimension

Indicates whether the activity is critical. An activity is critical when its Total Float is below the critical duration specified for the project. Delaying critical activities will delay the finish date of the project.

Mitigation Activity

General - (Mitigation Activity)

Percent Complete Type

Dimension

The activity percent complete type is one of Duration, Units, or Physical. The percent complete type controls whether the Activity % Complete is tied to the Duration % Complete, the Units % Complete, or the Physical % Complete for the activity. Set the percent complete type to Duration for activities which are duration driven, for example, administration tasks and training classes. Set the percent complete type to Physical for activities which are work-product driven, for example, creating a document or a product. Set the percent complete type to Units for activities which are work effort driven, for example, providing a consulting service.

Mitigation Activity

General - (Mitigation Activity)

Primary Constraint

Dimension

The type of constraint applied to the activity start or finish date. Activity constraints are used by the project scheduler. Start date constraints are 'Start On', 'Start On or Before', 'Start On or After' and 'Mandatory Start'. Finish date constraints are 'Finish On', 'Finish On or Before', 'Finish On or After' and 'Mandatory Finish'. Another type of constraint, 'As Late as Possible', schedules the activity as late as possible based on the available free float.

Mitigation Activity

General - (Mitigation Activity)

Secondary Constraint

Dimension

The second type of constraint applied to the activity start or finish date.

Mitigation Activity

Percent Completes - (Mitigation Activity)

 

 

 

Mitigation Activity

Percent Completes - (Mitigation Activity)

Duration % Complete

Dimension

The percent complete of the activity duration. Computed as (Original Duration - Remaining Duration)/Original Duration * 100. Always in the range 0 to 100. The Original Duration is taken from the current plan, not from the baseline.

Mitigation Activity

Percent Completes - (Mitigation Activity)

Labor Units % Complete

Dimension

The percent complete of units for all labor resources for the activity. Computed as Actual Labor Units / At Completion Labor Units * 100. Always in the range 0 to 100.

Mitigation Activity

Percent Completes - (Mitigation Activity)

Nonlabor Units % Complete

Dimension

The percent complete of units for all nonlabor resources for the activity. Computed as Actual Nonlabor Units / At Completion Nonlabor Units * 100. Always in the range 0 to 100.

Mitigation Activity

Percent Completes - (Mitigation Activity)

Percent Complete

Dimension

The activity percent complete. This value is tied to the activity Duration % Complete, Units % Complete, or Physical % Complete, depending on the setting for the activity's Percent Complete Type, which is one of Duration, Units, or Physical. Always in the range 0 to 100.

Mitigation Activity

Percent Completes - (Mitigation Activity)

Performance % Complete

Dimension

The activity performance percent complete. The performance percent complete is used to compute earned value and may be based on the Activity % Complete, on the 0/100 rule, on the 50/50 rule, etc., depending on the technique for computing earned-value percent complete for the activity's WBS. The Performance % Complete specifies what percentage of the activity's planned worth has been earned so far.

Mitigation Activity

Percent Completes - (Mitigation Activity)

Physical % Complete

Dimension

The physical percent complete can either be user entered or calculated from the activity's weighted steps. There is a project setting specifying this.

Mitigation Activity

Percent Completes - (Mitigation Activity)

Schedule % Complete

Dimension

The activity schedule percent complete. The Schedule % Complete specifies how much of the activity's baseline duration has been completed so far. Computed based on where the current data date falls between the activity's baseline start and finish dates. If the data date is earlier than the baseline Start, the Schedule % Complete is 0. If the data date is later than the baseline Finish, the Schedule % Complete is 100. The Schedule % Complete indicates how much of the activity duration should be currently completed, relative to the selected baseline.

Mitigation Activity

Percent Completes - (Mitigation Activity)

Units % Complete

Dimension

The percent complete of units for all labor and nonlabor resources assigned to the activity. Computed as Actual Units / At Completion Units * 100. Always in the range 0 to 100.

Related Topics

Primavera Cloud Subject Area Field Reference

Primavera Cloud - Lean Task

Primavera Cloud - Resource Assignment

Primavera Cloud - Schedule Health



Last Published Friday, December 8, 2023