If you need to make changes to the preference for multiple projects simultaneously, you can make the change to the highest relevant EPS node. All changes you make to the fields, options, and lists in the project preferences dialog box at EPS level will be applied to all visible child projects in all visible child EPS nodes of the selected EPS node.
Note: The settings shown in the Project Preferences dialog box at the EPS level reflect the default settings for P6.
To change project preferences for multiple projects:
- Click Projects.
- On the Projects navigation bar, click EPS.
- Select an EPS node.
- Click the Row Actions menu and select Set Project Preferences.
- In the Project Preferences of EPS dialog box:
- Make the changes you want to apply to child projects.
- Click OK.
Tips
- If you do not want to apply the change to all child projects of the selected EPS node, apply a filter to your view. Projects that are not selected to show in your view will not be modified when you change project preferences at the EPS level.
- To change any setting back to the default for multiple projects, select an option other than the default for that setting, then re-select the default setting before you apply the changes.