Activities Interface Staging Table Structure
This table lists the details of the Activities Interface staging table structure:
| Field Number | Field Name | Type | Criteria | Description |
|---|---|---|---|---|
|
1 |
INTFC_ID |
Number |
Required |
Batch interface identifier. |
|
2 |
INTFC_LINE_NUM |
Number |
Required |
Unique batch line identifier. |
|
3 |
BUSINESS_UNIT |
Character |
Required |
Prompts from the SP_BU_PC_NONVW table. |
|
4 |
PROJECT_ID |
Character |
Conditional |
You can bulk load projects and use the system autonumbering functionality to generate the next PROJECT_ID. In this case, PROJECT_IDs are not required. However, if you perform update projects or incrementally add activities to projects, then PROJECT_IDs are required and are validated against the PROJECT table. |
|
5 |
ACTIVITY_ID |
Character |
Conditional |
You can bulk load activities and use the system autonumbering functionality to generate the next ACTIVITY_ID. In this case, ACTIVITY_IDs are not required. However, if you perform updates or incrementally add activities to projects, then ACTIVITY_IDs are required and are validated against the PROJ_ACTIVITY table. |
|
6 |
INTFC_TYPE |
Character |
Optional |
Not used in the activity interface. |
|
7 |
INTFC_STATUS |
Character |
Optional |
Populate the field with NEW. |
|
8 |
LOAD_STATUS |
Character |
Optional |
Populate the field with NEW. |
|
9 |
ORIG_INTFC_ID |
Number |
Optional |
Not used in the activity interface. |
|
10 |
ORIG_LINE_NUM |
Number |
Optional |
Not used in the activity interface. |
|
11 |
ACTIVITY_DESCR |
Character |
Optional |
Activity description up to 30 characters. |
|
12 |
ACTIVITY_TYPE |
Character |
Optional |
Prompts from the PROJ_ACT_TBL table. |
|
13 |
SYSTEM_SOURCE |
Character |
Optional |
Populate the field with BPC (batch process). |
|
14 |
PERCENT_COMPLETE |
Number |
Optional |
Schedule status percent complete. |
|
15 |
EARLY_START_DT |
Date |
Optional |
Early start date. |
|
16 |
LATE_START_DT |
Date |
Optional |
Late start date. |
|
17 |
ACTUAL_START_DT |
Date |
Optional |
Actual start date. |
|
18 |
EARLY_FINISH_DT |
Date |
Optional |
Early finish date. |
|
19 |
LATE_FINISH_DT |
Date |
Optional |
Late finish date. |
|
20 |
ACTUAL_FINISH_DT |
Date |
Optional |
Actual finish date. |
|
21 |
BASELINE_FINISH_DT |
Date |
Optional |
Baseline finish date. |
|
22 |
BASELINE_START_DT |
Date |
Optional |
Baseline start date. |
|
23 |
BCWP |
Number |
Optional |
Work performed. |
|
24 |
BCWS |
Number |
Optional |
Work scheduled. |
|
25 |
ACT_TYPE_SCH |
Character |
Optional |
Schedule activity type. Prompts from the PC_ACT_TYPE_SCH table. |
|
26 |
DTTM_STAMP |
Date/Time |
System-maintained |
Date and time when the project is created. |
|
27 |
DRAWING_NAME |
Character |
Optional |
Not used in the activity interface. |
|
28 |
ACTIVITY_USER1 |
Character |
Optional |
User-defined field. |
|
29 |
ACTIVITY_USER2 |
Character |
Optional |
User-defined field. |
|
30 |
ACTIVITY_USER3 |
Character |
Optional |
User-defined field. |
|
31 |
ACTIVITY_USER4 |
Character |
Optional |
User-defined field. |
|
32 |
ACTIVITY_USER5 |
Character |
Optional |
User-defined field. |
|
33 |
PC_ACT_USER_DT1 |
Date |
Optional |
User-defined field. |
|
34 |
PC_ACT_USER_DT2 |
Date |
Optional |
User-defined field. |
|
35 |
PC_USER_CURRENCY |
Character |
Optional |
User-defined field. Prompts from the CURRENCY_CD_TBL table. |
|
36 |
PC_ACT_USERAMT1 |
Sign |
Optional |
User-defined field. |
|
37 |
PC_ACT_USERAMT2 |
Sign |
Optional |
User-defined field. |
|
38 |
PC_ACT_USERAMT3 |
Sign |
Optional |
User-defined field. |
|
39 |
SETID |
Character |
Required |
Not used in the activity interface. |
|
40 |
OPRID |
Character |
Optional |
The interface assigns an operator ID. |
|
41 |
PROCESS_INSTANCE |
Number |
System-maintained |
The interface assigns a process instance number. |
|
42 |
DESCR254 |
Character |
Optional |
Activity description up to 254 characters. |
|
43 |
ACT_LOC_EFFDT |
Date |
Optional |
Activity location effective date. Populated with %Date (current server date) if not provided in the source file. |
|
44 |
EFFSEQ |
Number |
Optional |
Activity location effective sequence or activity status effective sequence. Default value is 1. |
|
45 |
LOCATION |
Character |
Optional |
Must be a value from the LOCATION_TBL table. Default value is from LOCATION_TBL.LOCATION. |
|
46 |
LOCATION_FRACTION |
Number |
Optional |
Not used in the activity interface. |
|
47 |
ACTIVITY_STATUS |
Character |
Optional |
Activity status. Prompts from the PROJ_STATUS_TBL table. |
|
48 |
ACT_STATUS_EFFDT |
Date |
Optional |
Activity status effective date. Populated with %Date (current server date) if not provided in the source file. |
|
49 |
START_DT_2 |
Date |
Optional |
User-defined field. |
|
50 |
END_DT_2 |
Date |
Optional |
User-defined field. |
|
51 |
START_DT |
Date |
Required |
Activity start date. |
|
52 |
END_DT |
Date |
Required |
Activity end date. |
|
53 |
ACTIVITY_PRIORITY |
Number |
Optional |
Activity priority. |
|
54 |
ACT_PCT_COMPLETE |
Number |
Optional |
Activity percentage complete. |
|
55 |
QUALITY_DTTM |
Date/Time |
System-maintained |
Date and time when the record is created. |
|
56 |
QUALITY_TYPE |
Character |
Optional |
Prompts from the PROJ_QUAL_TBL table. |
|
57 |
QUALITY_RATING |
Number |
Optional |
Not used in the activity interface. |
|
58 |
QUALITY_WEIGHT |
Number |
Optional |
Not used in the activity interface. |
|
59 |
QUALITY_MEMBER |
Character |
Optional |
Prompts from the PROJ_TEAM_VW table. |
|
60 |
ADDRESS_SBR |
Subrecord |
Optional |
The interface assigns address information. |
|
1 (ADDRESS_SBR) |
COUNTRY |
Character |
Optional |
Country. Prompts from the COUNTRY_TBL table. |
|
2 (ADDRESS_SBR) |
ADDRESS1 |
Character |
Optional |
Address line 1. |
|
3 (ADDRESS_SBR) |
ADDRESS2 |
Character |
Optional |
Address line 2. |
|
4 (ADDRESS_SBR) |
ADDRESS3 |
Character |
Optional |
Address line 3. |
|
5 (ADDRESS_SBR) |
ADDRESS4 |
Character |
Optional |
Address line 4. |
|
6 (ADDRESS_SBR) |
CITY |
Character |
Optional |
City. |
|
7 (ADDRESS_SBR) |
NUM6 |
Character |
Optional |
Number 6. |
|
8 (ADDRESS_SBR) |
NUM2 |
Character |
Optional |
Number 2. |
|
9 (ADDRESS_SBR) |
HOUSE_TYPE |
Character |
Optional |
House type. Prompts from the translate values for the HOUSE_TYPE field. |
|
10 (ADDRESS_SBR) |
ADDR_FIELD1 |
Character |
Optional |
Address field 1. Prompts from the translate values for the ADDR_FIELD1 field. |
|
11 (ADDRESS_SBR) |
ADDR_FIELD2 |
Character |
Optional |
Address field 2. |
|
12 (ADDRESS_SBR) |
ADDR_FIELD3 |
Character |
Optional |
Address field 3. |
|
13 (ADDRESS_SBR) |
COUNTY |
Character |
Optional |
County. |
|
14 (ADDRESS_SBR) |
STATE |
Character |
Optional |
State. |
|
15 (ADDRESS_SBR) |
POSTAL |
Character |
Optional |
Postal code. |
|
16 (ADDRESS_SBR) |
GEO_CODE |
Character |
Optional |
Tax vendor geographic. |
|
17 (ADDRESS_SBR) |
IN_CITY_LIMIT |
Character |
Optional |
Within city limit (yes or no). |
|
61 |
RATE_PLAN |
Character |
Optional |
Not used in the PeopleSoft Project Costing interface. Note: The default value of the rate plan or rate set is based on the project type of the project or activity if you associate a predefined rate set or rate plan with the project type, and include the project type in the source file. |
|
62 |
PC_MILESTONE_FLG |
Character |
Conditional |
Indicates if activity is a milestone. |
|
63 |
AFUDC_ACT_SW |
Character |
Conditional |
Allows interest calculations for this project activity. |
|
64 |
ACT_TEMPLATE_SW |
Character |
Not used in the PeopleSoft Project Costing interface. |
|
|
65 |
PC_SCH_FIELD1 |
Character |
Optional |
Third-party user field. |
|
66 |
PC_SCH_FIELD2 |
Character |
Optional |
Third-party user field. |
|
67 |
PC_SCH_FIELD3 |
Character |
Optional |
Third-party user field. |
|
68 |
PC_SCH_FIELD4 |
Character |
Optional |
Third-party user field. |
|
69 |
PC_SCH_FIELD5 |
Character |
Optional |
Third-party user field. |
|
70 |
PC_SCH_FIELD6 |
Character |
Optional |
Third-party user field. |
|
71 |
PC_SCH_FIELD7 |
Character |
Optional |
Third-party user field. |
|
72 |
SUMMARY_ACT |
Character |
Optional |
Designates an activity as a summary activity. The default value is N (no). |
|
73 |
PC_DURATION |
Number |
Duration. |
|
|
74 |
ENFORCE |
Character |
Optional |
Identifies the enforce project team option, such as PeopleSoft Expenses only, PeopleSoft Time and Labor only, Expenses and Time and Labor, or do not enforce. |
|
75 |
PC_CHC_ACT_SW |
Character |
Optional |
Enables change control. Default value is PROJECT.PC_CHC_SW. |
|
76 |
PGM_SCHED_METHOD |
Character |
Optional |
Schedule method, such as fixed units, duration, and work. Default value is PROJECT.PGM_SCHED_METHOD. |
|
77 |
WBS_ID |
Character |
Optional |
Coded hierarchy identifier for each activity. |
|
78 |
PGM_WBS_SBR |
Subrecord |
Optional |
Hierarchy grid subrecord. |
|
1 (PGM_WBS_SBR) through 26 (PGM_WBS_SBR) |
LEVEL1 through LEVEL 26 |
Number |
Optional |
|
|
79 |
LEVEL_NUM |
Number |
Optional |
|
|
80 |
ROW_NUMBER_5 |
Number |
Optional |
Internal sequence number assigned to each row to uniquely identify a row. |
|
81 |
DEADLINE_DT |
Date |
Optional |
Deadline date. |
|
82 |
CONSTRAINT_DT |
Date |
Optional |
Constraint date. |
|
83 |
CONSTRAINT_TYPE |
Character |
Optional |
Constraint type. |
|
84 |
COSTING_ACT_SW |
Character |
Optional |
Activity costing flag. Indicates whether an activity is available for charging. |
|
85 |
PC_ACT_OWNER |
Character |
Optional |
Activity owner. Prompts from PC_TEAM_PROM_VW table. |
|
86 |
CURRENCY_CD |
Character |
Optional |
Default value is PROJECT.CURRENCY_CD. |
|
87 |
PC_ACT_DEF_CALC_MT |
Character |
Optional |
Activity calculation method. Default value is PROJECT.PC_ACT_DEF_CALC_MT. |