Adding Planned Demand Details

The Planned Demand subtab displays the items to be produced within the selected horizon. You can use planned demand before creating a work order. You can also add demand to an existing plan or complete the add items to the Product Demand subtab.

Note:

Each item added to the planned demand must be associated with a valid manufacturing routing. For more information, see Manufacturing Routing.

To add planned demand details:

  1. Go to Advanced Manufacturing > Capacity Planning > Capacity Planning.

  2. Select a Location from the list.

  3. Click List.

  4. Click Edit beside the plan you want to update.

  5. Enter the Order No (number).

  6. Enter the Item No.

  7. Enter a product Description.

  8. Enter a product Quantity.

  9. Click the calendar icon to enter a Production Date.

    Production Date is based on the work order production start date.

    Demand is tied to this date, even when an operation sequence crosses over to the next planning period.

  10. Click the calendar icon to enter a Planning Period.

    Planning Period is based on the time fence.

  11. Click Add.

    • Click Insert to add another order.

    • Click Remove to delete the selected order.

  12. Click Save the Plan.

  13. To generate demand for the RCP, click the Planned Demand button.