Completing the Shop Calendar Subtab

Use the following steps to complete the Shop Calendar subtab.

To complete the shop calendar subtab:

  1. Click the Shop Calendar subtab.

  2. Enter a Start Time with the HH:MM am/pm format.

    This is the time the work day begins.

  3. Enter an End Time with the HH:MM am/pm format.

    This is the time the work day finishes.

  4. Enter the total operating Hours.

    For example, if a Monday shift starts at 09:00 and ends at 16:30, Monday’s operating hours are 7.5.

    • For days that your shop does not operate, enter 0.

    • Deduct break times from the total unless the work center continues to run during the break.

    • Ensure to schedule half days, off days, or work stoppages.

  5. Repeat steps 2–4 for each day the work center operates.

  6. Click Save.

Related Topics

Creating an Advanced Manufacturing Work Center
Editing an Advanced Manufacturing Work Center
Completing the Assets Subtab
Completing the RCP Parameters Subtab
Creating an Advanced Manufacturing Location
Creating Manufacturing Work Benches
Conventional Work Order Plug-ins
Configuring Assemblies and Routings

General Notices