Record Downtime

Downtime start time defaults to the scanner location time. Scanner start time defaults to the current day’s date. If user preference time and scanner time are the same, the scanner calculates downtime duration after you tap save. If times are not synched, enter a labor downtime start time/duration and start time/end time in HH:MM (24 hour clock) format.

To record downtime using a scanner:

  1. Enter a Downtime Reason.

  2. Enter a Start date in HH:MM format (24 hour clock).

    The scanner calculates downtime duration.

  3. Tap Save.

Related Topics

Record Production
Record Loss (Scrap)
Record Labor
Issue Material
End Job
Initiating a Manufacturing Action

General Notices