Standard Cost Rollup

The standard cost rollup helps maintain accurate costing data for assembly items by calculating the standard cost of assemblies. The cost of an assembly is determined based on current costs of member components.

The cost rollup process calculates the fixed cost based on data entered on the planned standard cost record. This allows the most accurate cost of each assembly component to be used in costing calculations.

For example, you want to know the cost of Assembly Item D. Assembly Item D is comprised of one each of Item A, Item B and Item C. The cost of each component is multiplied by the number used in the assembly. The sum is totaled to find the current cost of the assembly.

When a cost rollup is performed, NetSuite examines planned standard cost records to find the following:

Using this data, NetSuite calculates the cost of Item D as (5 + 6 + 7) = $18. After the cost is calculated, this information is stored. This enables you to track your expected cost of $18 for Assembly Item D.

Note:

Calculations are performed with decimal precision to seven places. For example, 9.87654321 is calculated as 9.8765432.

In addition, cost calculations are performed for all parent component items. If an assembly has a component that is itself an assembly item, the same calculation is performed for the sub-assembly members. The cost calculations are performed down to the lowest sub-assembly level and then rolled up to find the cost of the parent assembly item.

To run a cost rollup:

  1. Go to Lists > Accounting > Planned Standard Cost Rollup.

  2. Select one or more Standard Cost Versions. Click the icon to open a multi-select popup window.

    A list of items corresponding to the cost versions shows.

  3. In the Effective Date field, enter the date you want the new standard cost to take effect. This defaults to the current date.

  4. Check the Update Inventory Cost box to set the standard cost of all planned standard cost records of inventory items.

    The planned standard cost records of inventory items are created or updated based on the inventory costing method defined on the cost version. When the default item record selection is used on the cost version, the cost rollup process reflects the cost in the Standard Cost field. This field is on the item record for each item selected. In addition, the planned standard cost of inventory items is automatically generated as part of the rollup process.

    The next time you open this page, NetSuite checks or clears the box based on the previous use.

  5. The Rollup Assemblies Based on Components preference lets you select only the component. NetSuite creates inventory revaluation entries for all the higher-level assemblies. For example, you can introduce a new component for several existing assemblies, as follows:

    Assembly A, Subassembly B, Component C (new)

    Check the Rollup Assemblies Based on Components box and select component C on the page. When you submit, NetSuite finds all the associated assemblies within the entire bill of materials (BOM) tree. Then, creates inventory revaluation transactions for the component and for the assemblies (A,B,C).

  6. Check the Select box next to an item to include it in the cost rollup calculations. Clear the box next to an item to exclude it from calculations.

    Check the All Items box to perform calculations for all items.

  7. Click Submit to perform the calculations.

    NetSuite performs the cost rollup calculations and creates or updates the planned standard cost record for all items and sub-items. The list of these newly calculated planned standard cost records displays. Click View or Edit next to a planned standard cost records for details on that record. For more information, see Entering Planned Standard Cost Records.

Related Topics

Standard Costing Workflow
Standard Costing Example
Enabling Standard Costing
Creating Cost Categories
Creating Inventory Cost Templates
Setting Up Item Records for Standard Costing
Defining Cost Versions
Revalue Standard Cost Inventory
Standard Costing and Transactions
Assembly Build Production Cost Variances
Standard Costing FAQ
Standard Costing Reporting
Standard Costing

General Notices