How You Add and Edit Operation Resources

You can add and edit operation resources in the Edit Operation Resources dialog box. To open the Edit Operation Resources dialog box, click the Resources link of the operation on the Operations tab of the Edit Work Order page. Alternately, select the operation, then from the Edit icon menu, select: Edit Operation Resources.

In the Edit Operation Resources dialog box, in the Operation field, you can select the operation for which you're adding or editing the operation resources.

These are the operation resource attributes:

Attribute

Description

Sequence

The resource sequence of the operation resource.

Name

The name of the resource.

Basis

The valid values are: Fixed and Variable.

Usage Rate

The usage amount of the operation resource.

Required Usage

The resource usage required for the work order quantity. The required usage is calculated and populated by default from the Usage rate depending on the Basis type. The calculation is done as follows:

  • If Basis is equal to Fixed, then the Required Usage is equal to Usage Rate.

  • If Basis is equal to Variable, then the Required Usage is equal to Usage Rate multiplied by Work Order Quantity.

Note: The work order quantity is always 1.

UOM Name

The usage unit of measure as defined in the resource definition.

Scheduled

The indicator that the resource is a scheduled resource. A resource can be scheduled if the Usage UOM belongs to the UOM class defined in the profile option RCS_DEFAULT_UOM_SRVICE_DURATION_CLASS.

Charge Type

Indicates whether the resources are charged manually or automatically when completing the operation. The valid values are: Automatic and Manual.

Description

The description of the resource.

Code

The code of the resource.

Inverse

The inverse of the usage rate. This attribute is applicable when the resource usage rate is fractional but its inverse is an integer.

Assigned Units

The number of resource units assigned to perform the operation.

Principal

The indicator that a resource is the principal resource within a group of simultaneous resources (resources sharing the same resource sequence number).

Resource Instances

Icon to open the Resource Instances dialog box in which you can add or edit the resource instances for the specific resource.
  • For Equipment type of resource, the Resource Instances dialog box contains the following fields: Name, Identifier, Asset Description, Asset Number, Actual Usage, and Additional Information.
  • For Labor type of resource, the Resource Instances dialog box contains the following fields: Name, Identifier, Person Type, Person Name, Actual Usage, and Additional Information.
Note: You can predefine labor resource instances for assignment or self-assign in the My Maintenance Work or Report Work pages. The logged in user must have a resource instance defined to support pre-assignment or self-assignment.

Start Date

The start date of the resource and also referred as scheduled start date. The resource start date is generally calculated by the scheduling engine. The resource start date must be encompassed within the operation start and completion date.

Completion Date

The completion date of the resource and also referred as scheduled completion date. The resource completion date is generally calculated by the scheduling engine. The resource completion date must be encompassed within the operation start and completion date.

Activity

The predefined values are: Setup, Run, and Tear Down. The lookup can be configured by adding new values.

Actual Resource Usage

The net actual usage of the assigned resource.

Attachments

The attachments in the resources. It can be of file, text, or URL type.