Creating a Strategy Map

You must have one of the following user type permissions:
  • BI Author Developer

  • BI Tenant Administrator

Home > Oracle Business Intelligence > Catalog
  1. Edit the scorecard in which you want to create the strategy map. For information, see "Opening or Editing a Scorecard".
  2. In the Scorecard Documents pane, click the New Object toolbar button and select Create Strategy Map.
    The Strategy Map tab: Diagram tab is displayed.
  3. Build the map as follows:
    • Add objectives and KPIs that measure their progress by dragging them from the Strategy pane and dropping them in the diagram as follows:
      • If the objective or KPI is aligned with a specific perspective, then drop it anywhere in the diagram. It is displayed automatically in the section for the perspective to which the objective or KPI is associated.

        You align an objective or KPI with a perspective when you create (or edit) the objective or KPI. See "Creating an Objective". For more information on perspectives, see Perspectives

      • If the objective or KPI is not associated with a perspective, then you drop it in the section for the perspective to which the objective or KPI is to be associated. Note that this does not permanently assign the perspective to this objective or KPI.

    • (optional) Add the direct cause and effect objects for the selected node (that is, the representation of an objective or KPI) to the diagram by right-clicking and selecting Add Related Strategy Nodes

    • Add cause and effect relationships, as needed.

      To add a cause and effect relationship, click the Draw A Casual Linkage Between Two Objectives button on the Scorecard editor: Strategy Map tab toolbar, select one of the nodes, and then select the second node. A line connecting the nodes is displayed.

    If you want to delete a node from the map, then right-click the node and select Remove From Diagram.

  4. To:
    • Display options that enable you to work with a node, click the Options button (on the right side of the node) to display the Node Options Menu.

    • Edit a causal linkage, right-click the linkage line and select Edit Causal Linkage. The Causal Linkage dialog is displayed.

    • Delete a causal linkage, right-click the linkage line and select Delete Causal Linkage.

    • Display additional performance data for the KPI, such as target value or variance, click the down arrow at the bottom center of the representation. To collapse this data, click the up arrow.

    • Zoom in and out of the diagram, use the toolbar buttons on the Scorecard editor: Strategy Map tab.

    • Work with comments:

      • Hover the mouse pointer over the Comment button in the upper-right corner of a node to display the Status window, where you can read the comments that were previously added, add another comment, or reply to a comment.

      • Click the Options button on the right side of the node to which you want to add a comment and select Add Comment from the Node Options Menu. The New Comment dialog is displayed, where you can add a comment or read any comments that were previously added.

      See "About Comments" and "Comments".

    • Work with status overrides on nodes for which you are the business owner:

      • Hover the mouse over the red asterisk (if available) in a node to display the Status window, where you can view the overrides that were previously applied or apply another override.

      • Click the Options button on the right side of the node to which you want to apply the status override and select Override Status from the Node Options Menu. The Status Override dialog is displayed, where you apply another override or view any overrides that were previously applied.

      See "Status Overrides" and "Status Overrides"

  5. Click the Strategy Map tab: Details tab.
  6. Specify a description, assign the business owner, and specify related documents, as appropriate. (By default, the business owner is the creator of the scorecard.)
  7. Click Save to display the Save As dialog. In the Save As dialog, you can rename the strategy map rather than use the default name.