Complete the checklists in this appendix to ensure the site is prepared for your new Oracle Engineered System.
Note:
For ease of reading, the Oracle Engineered System is sometimes referred to simply as "the rack", which indicates the entire system, not just the cabinet.
- System Components Checklist
Use this checklist to ensure that the system component considerations have been addressed. - Data Center Room Checklist
Use this checklist to ensure that the data center room requirements have been addressed. - Data Center Environment Checklist
Use this checklist to ensure that the data center environment requirements have been addressed. - Access Route Checklist
Use this checklist to ensure that the access route requirements are addressed. - Facility Power Checklist
Use this checklist to ensure that the facility power requirements have been addressed. - Safety Checklist
Use this checklist to ensure that the safety requirements have been addressed. - Logistics Checklist
Use this checklist to ensure that the logistics requirements have been addressed. - Network Configuration Checklist
Use this checklist to ensure that the network configuration requirements have been addressed. - Auto Service Request Checklist
Use this checklist if you are planning to use Auto Service Request with the Oracle Exadata Database Machine. - Re-racking Checklists
Use these checklists prior to re-racking configurations approved for re-rack by Oracle Exadata Configuration Assistant (OECA) or your Oracle contact. - PDU Checklist for Re-racking
Use this checklist to verify the power distribution unit (PDU) requirements when using the re-racking service. - Recycling the Racks
Use this checklist when recycling the rack.