List of Figures
- 2-1 Low-voltage Single Phase Power Connector for North America, South America, Japan and Taiwan
- 2-2 Low-voltage Three Phase Power Connector for North America, South America, Japan and Taiwan
- 2-3 High-voltage Single Phase Power Connector
- 2-4 High-voltage Three Phase Power Connector
- 2-5 Low-voltage 22 kVA Single Phase Power Connector
- 2-6 High-voltage Single Phase Power Connector
- 2-7 Typical Data Center Configuration for Perforated Floor Tiles
- 3-1 RA21 Backplane External Network Connectivity
- 3-2 X8M Backplane External Network Connectivity
- 3-3 X8-2 and X7 Backplane External Network Connectivity
- 3-4 Network Diagram for Recovery Appliance
- 3-5 Network Connections to the Recovery Appliance Rack Components
- 3-6 Recovery Appliance Connection to an Oracle Tape System
- 3-7 Recovery Appliance Connection to a Third-Party Tape System
- 4-1 Auto Service Request Network Connections
- 6-1 ZDLRA Rack in Shipping Crate
- 6-2 Carefully Push ZDLRA Rack from Behind
- 6-3 Location of Leveling Feet on ZDLRA Rack
- 6-4 Securing ZDLRA Rack Using the Leveling Feet
- 6-5 Location of Leveling Feet on ZDLRA Rack X7 or later
- 6-6 Securing ZDLRA Rack Using the Leveling Feet
- 6-7 Earth Ground Attachment Bolt Location
- 6-8 Power Cord Routing Example
- 6-9 PDU Switch Locations
- 7-1 Server Expansion Kit Components
- 7-2 Removing the Rack Doors
- 7-3 Removing the Filler Panels
- 7-4 Location of the Trough
- 7-5 Aligning the Side-Rail Assembly With the Rack
- 7-6 Inserting the Server with Mounting Brackets into the Slide Rails
- 15-1 Rack Layout of the Recovery Appliance RA21 Full Rack
- 15-2 Rack Layout of the Recovery Appliance RA21 Minimum Configuration
- 16-1 Rack Layout of the Recovery Appliance RA21 and X8M Full Rack
- 16-2 Rack Layout of the Recovery Appliance RA21 and X8M Minimum Configuration
- 17-1 Rack Layout of the Recovery Appliance X8, X7, X6, or X5 Full Rack
- 17-2 Rack Layout of the Recovery Appliance X8, X7, X6, or X5 Minimum Configuration
- 18-1 Rack Layout of the Recovery Appliance X4 Full Rack
- 18-2 Rack Layout of the Recovery Appliance X4 Minimum Configuration
- 21-1 Connections Between Spine Switches and Leaf Switches for up to 8 Racks
- 22-1 Connections Between Spine Switch and Leaf Switches in a Single Rack
- 22-2 Connections Between Database Servers and Storage Servers and Leaf Switches
- 22-3 Connections Between Spine Switches and Leaf Switches Across Two Racks
- 22-4 Connections Between Spine Switches and Leaf Switches for up to 8 Racks
- 22-5 Leaf Switch Connections Between 2 Quarter Racks
- 22-6 Leaf and Spine Switch Connections Between a Quarter Rack and a Half or Full Rack
- 22-7 Leaf and Spine Switch Connections for a Quarter Rack Connected to One or More Half or Full Racks
- 24-1 Front View of Oracle Server X8-2 and X8M-2 Database Servers
- 24-2 Rear View of Oracle Server X8-2 and X8M-2 Database Servers
- 24-3 Front View of Oracle Exadata Storage Server X9M-2, X8M-2 and X8-2 High Capacity and XT servers
- 24-4 Rear View of Oracle Exadata Storage Server X9M-2, X8M-2 and X8-2 High Capacity and XT servers