Access Route and Data Center Checklist
Review the following facility requirements before you install the server.
| Data Center Room Considerations | Yes | No | N/A | Comment |
| Has the access route been checked for clearances of the packaged equipment? | ||||
| Do all the doors and entryways conform to the width and height requirements for transportation, including the width of the unpacked unit? | ||||
| Are there any ramps, stairs, or thresholds that are in the moving path for the new hardware? | ||||
| Have you confirmed that the access route is free of any obstacles that would expose the device to shock? | ||||
| If there are stairs, then is a loading elevator accessible for moving the equipment? | ||||
| Has the rack location been allocated? | ||||
| Is there a vacant space in the rack for the new server? | ||||
| Does the floor layout meet the equipment maintenance access requirements? | ||||
| Have cabinet stabilization measures been implemented? | ||||
| Will the hardware location require any non- standard cable lengths? | ||||
| Is the floor to ceiling height a minimum of 2914 mm or 2.9 m (9.6 feet)? |