Migrate a Single Project from Oracle Primavera Cloud to Primavera P6 EPPM

For this workflow, you will activate and run the Oracle Primavera Cloud to P6 Migrate Project Sync integration.

  1. Go to the Integrations section of the project workspace.
  2. Activate the integration.
    1. Click Actions Actions icon next to the integration, then select Activate.
    2. In the Activate integration panel, select an appropriate Tracing level (Production, Audit, or Debug), then click the Activate button.

      A message confirms that the integration has been activated. Refresh the page to view the updated status of the integration.

      You can change the tracing level later by selecting Actions, and then Configure activation.

  3. Run the integration.
    1. Click Actions Actions icon next to the integration, then select Run.
    2. On the Configure and run page, update the following schedule parameters:
      • EPS Id: Specify the Primavera P6 EPPM EPS location to create projects in if the project does not exist already. This field is optional if you are updating an existing project.
      • Project Code: Specify the Oracle Primavera Cloud project filter.
      • PrjWorkspaceCode: Specify the Oracle Primavera Cloud workspace location.
    3. Click Run.