Asset Abandonment
When a previously synchronized GIS feature is marked as abandoned in the GIS system, the next synchronization process detects these changes as an Abandonment operation that results in the following changes:
-
The corresponding asset location is marked inactive.
-
The corresponding asset is retired.
-
If the asset is not allowed to be left in place based on current location’s type the asset is moved to the default out of service location defined on the Esri WAM Integration master configuration record.
The synchronization process looks for a designated “abandonment” GIS field and a corresponding “abandonment” value on the GIS feature to mark the feature as abandoned. The “abandonment” GIS field and value combination are configured on the Esri WAM Integration master configuration record.