Updating Existing Batch Schedule

You can modify the required details and later schedule the previously defined Batch for processing.

To update existing Batch schedule in the Batch Scheduler window:
  1. Select the checkbox adjacent to the Batch ID whose details are to be updated. The various Batch schedule options are displayed.
  2. In the Batch Scheduler section, select Existing Schedule as the Schedule type. The window is refreshed and displays the Existing Schedule options.
  3. Select the Schedule name whose details you want to modify from the drop-down list.
  4. Click Edit button in the Existing Schedule toolbar. The details of the scheduled Batch are displayed in the Batch Scheduler pane.
  5. Modify the required details. You can modify the Start and End dates, Run Time, Lag days, and other details depending on the Schedule Type selected. For more information, see Creating Batch Schedule.
  6. Click Save to save the modified details of an existing Batch schedule.
    You can also do the following in the Existing Schedule section of the Batch Scheduler window:
    • Click View button to view details of the selected Batch schedule. and buttons are displayed.
    • Click Task Logs button to view Task Logs
    • Click View Log Details button to view all the log details for the selected Batch.
    • Click Delete button to delete the selected Batch schedule.
    • Click Refresh button to reset the Batch scheduler details.