3 PSR and ReSD reports after the upgrade

All the existing PSR and ReSD reports that were generated before the 8.1.3 upgrade are retained in the old format.

All the reports that are generated or re-generated after the upgrade are generated in the updated format/layout, as mentioned for individual forms.

When the reports are created (copied and saved after modification) using the submitted report, the Inclusion Date Report-level Configuration parameter is automatically set to Aware Date for all the reports. This allows the users to continue to generate the reports correctly, including the PMDA feedback cases, without the need to create a new report (with no historical schedule).