If you needed to turn the system power off to install the HBA, power on
the system.
Note -
If you do need to return power to the system, ensure that the power is
turned on to the SAS devices before or at the same time that the power
is turned on to the host system. If the system is powered up before
these devices, the devices might not be recognized.