About This Documentation (PDF and HTML)
Download Server System Tools and Drivers
Sun Fire X2270 M2 Server Installation Guide
Installation Overview and Preparation
Safety and Compliance Information
External Features and Components
Installing the Server Into a Rack With Optional Slide Rails
How to Disassemble the Slide Rails Before Installation
How to Install the Mounting Brackets on the Server
How to Attach the Slide Rail Assemblies to the Rack
How to Install the Server Into the Slide Rail Assemblies
How to Verify the Operation of the Slide Rails
How to Remove the Server from the Rack
About Server Management Tool Options
Communicating With the ILOM and the System Console
Connecting Cables and Powering On to Standby-Power Mode
ILOM SP IP Address and the ILOM Interfaces
Connecting to the System Console
Setting Up Platform Operating System and Driver Software
Configuring the Factory--Installed Oracle Solaris 10 Operating System
The Oracle Solaris OS Installation Worksheet
Configuring the Factory-Installed Oracle Solaris 10 Operating System
Updating Supplemental Drivers and Firmware
Getting Started on the Oracle Solaris OS
Powering On and Powering Off the Server
Four-post structure (mounting at both front and rear). Two-post racks are not compatible.
Rack horizontal opening and unit vertical pitch conforming to ANSI/EIA 310-D-1992 or IEC 60927 standards.
Distance between front and rear mounting planes of 610 mm and 915 mm (24 in. to 36 in.).
Clearance depth (to front cabinet door) in front of front rack mounting plane at least 25.4 mm (1 in.).
Clearance depth (to rear cabinet door) behind front rack mounting plane at least 800 mm (31.5 in.) with the cable management arm, or 700 mm (27.5 in.) without the cable management arm.
Clearance width (between structural supports and cable troughs) between front and rear mounting planes at least 456 mm (18 in.).
Caution - Always load equipment into a rack from the bottom up so that it does not become top-heavy and tip over. Deploy your rack’s anti tilt bar to prevent the rack from tipping during equipment installation. |
Caution - Ensure that the temperature in the rack does not exceed the server’s maximum ambient rated temperatures. Consider the total airflow requirements of all equipment installed in the rack to ensure that the equipment is operated within its specified temperature range. |