JavaScript is required to for searching.
Skip Navigation Links
Exit Print View
Sun Fire X2270 M2 Server Installation Guide
search filter icon
search icon

Document Information

Preface

Related Books

About This Documentation (PDF and HTML)

Documentation Comments

Download Server System Tools and Drivers

Documents History

Sun Fire X2270 M2 Server Installation Guide

Installation Overview and Preparation

Installation Flow Chart

Installation Task Table

Safety and Compliance Information

Required Tools

External Features and Components

Specifications

Installing the Server Into a Rack With Optional Slide Rails

Optional Slide Rail Compatibility

How to Disassemble the Slide Rails Before Installation

How to Install the Mounting Brackets on the Server

How to Attach the Slide Rail Assemblies to the Rack

How to Install the Server Into the Slide Rail Assemblies

How to Verify the Operation of the Slide Rails

How to Remove the Server from the Rack

Managing Your Server

About Server Management Tool Options

About the ILOM Software

Communicating With the ILOM and the System Console

Connecting Cables and Powering On to Standby-Power Mode

ILOM SP IP Address and the ILOM Interfaces

Determining the SP IP Address

Connecting to the ILOM

Connecting to the System Console

Setting Up Platform Operating System and Driver Software

Configuring the Factory--Installed Oracle Solaris 10 Operating System

The Oracle Solaris OS Installation Worksheet

Selecting Your Console Output

Configuring the Factory-Installed Oracle Solaris 10 Operating System

Updating Supplemental Drivers and Firmware

Getting Started on the Oracle Solaris OS

Powering On and Powering Off the Server

Power Modes

How to Power On the Server

How to Power Off the Server

Troubleshooting and Support

Troubleshooting the Sun Fire X2270 M2 Server

Contacting Support

How to Verify the Operation of the Slide Rails

Use this procedure to ensure that the slide rails are operating correctly.


Note - Two people are recommended for this procedure: one to move the server in and out of the rack, and one to observe the cables.


  1. Slowly pull the server out of the rack until the slide rails reach their stops.
  2. Inspect the attached cables for any binding or kinks.
  3. Push the server back into the rack.

    When the server is fully extended, you must release two sets of slide rail stops to return the server to the rack:

    1. The first set of stops are levers, located on the inside of each slide rail, just behind the back panel of the server. These levers are labeled “PUSH.” Push in both levers simultaneously and slide the server toward the rack.

      The server slides in approximately 38 cm (15 in.) and stops.

      Verify that the cables retract without binding before continuing.

    2. The second set of stops are the slide rail release buttons, located near the front of each mounting bracket. Simultaneously push or pull both of the slide rail release buttons and push the server completely into the rack until both slide rail locks engage.
  4. Adjust the cable hangers as required.